RTA A_Report Cover 30/11/00 1:04 PM Page 1

RTA:2000
ROADS AND TRAFFIC
AUTHORITY ANNUAL
REPORT 2000
RTA A_Report NEW GUTTER 30/11/00 9:54 AM Page b

integrated solutions innovation efficiency

FRONT COVER – FOR THE CORROBOREE 2000 AND THE WALK


FOR RECONCILIATION IN MAY 2000, THE RTA CLOSED THE
SYDNEY HARBOUR BRIDGE FOR NINE HOURS AND ASSISTED
IN CROWD MANAGEMENT OF ABOUT 150,000 PEOPLE
(PHOTO COURTESY AAP)
THIS PAGE – CAPTAIN COOK BRIDGE, SANS SOUCI

© ROADS AND TRAFFIC AUTHORITY, NSW


ISSN 1037-3276
Published November 2000. RTA/Pub 00.113
Printed on recycled paper (50% recycled fibre, 50% chlorine free)

This report, and many other publications referred to within it,


are available on our website at www.rta.nsw.gov.au
RTA A_Report NEW GUTTER 30/11/00 9:54 AM Page 1

2 Profile of the RTA


3 Our Vision, Mission and Priorities
4 Letter to the Minister
5 Chief Executive’s Message
6 Management Structure
8 1999/2000 Highlights
12 Delivering Results
14 Financial Overview
16 Ensuring Transport Efficiency
22 Developing the Road Network
28 Maintaining Roads and Bridges
34 The Road Safety Challenge
40 Working with our Customers
44 Drivers and Vehicles
50 Business Efficiency
56 Whole of Government Planning
60 Our People
64 Caring for the Environment
70 Corporate Governance
71 Financial Statements
119 Appendices
RTA A_Report NEW GUTTER 30/11/00 9:54 AM Page 2

PROFILE OF THE RTA

> HISTORY
The Roads and Traffic Authority
(RTA) was established on 16
January 1989 under the Transport
Administration Act 1988 through
an amalgamation of the former
Department of Main Roads,
Department of Motor Transport
ASSETS
The written down value of
the road, bridge and traffic
infrastructure we look after is
$44 billion, including the value
of land under roads. Property,
plant, equipment, private sector
provided infrastructure and other
and the Traffic Authority. non-current assets, including
major works in progress, are
RESPONSIBILITIES valued at $4.3 billion.
We provide road management,
design, construction and FUNDING
maintenance solutions for the Annual funding for the Roads
NSW community within an Program is about $2.2 billion,
integrated urban and regional derived principally from road
design framework with an user charges.
emphasis on meeting community,
environmental, regulatory and OUR PEOPLE
aesthetic needs. We employ 6,425 staff in more
than 200 offices throughout NSW
We promote road safety and including 130 Motor Registries.
traffic management and are
responsible for driver licensing OUR CUSTOMERS
and vehicle registration. We have a vast and varied
We manage the operations, range of customers, including
maintenance and enhancement individuals, private organisations,
of 17,783km of State Roads, community and road transport
including 3,128km of National groups, local councils and State
Highways. We also manage and Federal Government agencies.
nearly 3,000km of Regional The 4.1 million drivers and the
Roads and Local Roads in the owners of 4.3 million vehicles in
unincorporated area of NSW NSW generate about 405,000
where there are no local transactions and 57,000 phone
councils. We assist local councils calls a week.
in managing about 18,430km of
Regional Roads and, to a limited
extent, Local Roads, through
funding and other support.
Roads in which we have an
interest also take in 4,275
bridges, including major culverts
and tunnels, and nine vehicular
ferries. We are also responsible
for traffic facilities such as
traffic lights, roundabouts,
signs and linemarking.

(2) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:54 AM Page 3

OUR VISION, MISSION


AND PRIORITIES

OUR VISION
To be recognised by the
people of NSW as the leader in
providing cost effective, safe
and accessible road based
transport solutions within an
integrated transport system. GOVERNMENT PRIORITIES Managing NSW’s transport THE JOURNEY AHEAD
FOR THE RTA needs The Journey Ahead 1998–2003
OUR MISSION Our strategies and programs We fulfil our responsibilities by: is the RTA's corporate strategic
In the delivery of the best focus on delivering the priorities – managing and developing the plan, which builds on our
transport outcomes we will of the NSW Government in road network in a way that achievements of recent years
balance the needs of public meeting the road transport balances the needs of public and outlines our vision for the
transport passengers, cyclists, needs of the community. transport passengers, cyclists, future. It sets the organisation's
pedestrians, motorists and pedestrians, motorists and direction and priorities, and
commercial vehicles by: Meeting customer needs reflects the challenges and
commercial vehicles, and
We put in place strategies and initiatives of the NSW
– placing our customers’ needs first – preparing and implementing an
policies to: Government's Action for
– working with innovation, integrated transport plan which
openness and integrity – develop and maintain fast, meets the needs of all road users Transport 2010 – An Integrated
– achieving value for money, and reliable passenger and freight and which contributes to the Transport Plan for NSW.
– being environmentally responsible. transport corridors between achievement of Government air This Annual Report includes
regional centres, capital cities quality targets. information on our performance
and ports and achievements against The
– provide leadership in national Key Responsibilities Journey Ahead 1998–2003: its
land transport reform to deliver Our key responsibilities are to: objectives, initiatives and
efficiency, productivity and safety – enable road users to make more performance measures.
benefits to NSW efficient travel decisions by
– continue to develop a customer providing timely information
focus, especially in the areas of about routes and traffic
traffic management, motor conditions
registry services and community – maintain roads and bridges in
consultation, and good condition, at minimum
– facilitate ease of access to essential whole of life cost
Government services by providing – make New South Wales roads
a suitable spread and range of the safest in the world, and
outlets, including the internet. – provide fair and consistent
Using funds wisely licence administration and
We actively pursue the best penalty structures to promote
value for money in the responsible road use.
performance of activities and
the delivery of services. Caring for our environment
We minimise impacts on the
natural and built environment
both from road use and from
our own activities.

(3) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:55 AM Page 4

LETTER TO THE
MINISTER
The Honourable Carl Scully, MP
Minister for Transport and Minister for Roads
Level 34, Governor Macquarie Tower
1 Farrer Place, Sydney NSW 2000
THE HON. CARL SCULLY, MP
Dear Minister,
I have pleasure in submitting the Annual Report and Financial
Statements of the Roads and Traffic Authority for presentation to the
Parliament of New South Wales for the financial year ended 30 June,
2000. It has been prepared in accordance with the Annual Reports
(Statutory Bodies) Act 1984 and the Public Finance and Audit Act 1983.

Yours sincerely,

Paul Forward
Chief Executive

THE NEW BULAHDELAH TO


COOLONGOLOOK FREEWAY

(4) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:55 AM Page 5

CHIEF
EXECUTIVE’S
MESSAGE

The last twelve months have The State’s heritage legacy and Road Safety, and particularly the
seen a number of significant the preservation of the natural road toll, remained a critical
achievements for the RTA and environment have been paramount focus for the RTA. We continued
a sharpening of our focus. We in the network infrastructure our efforts to further reduce the
continued to refine the structure programs undertaken by the RTA toll with the release of Road
of the organisation to better during the past year. Also, urban Safety 2010, a framework which
deliver the Government’s design considerations played an sets out a strategy to halve the
transport strategies. Our emphasis increasingly important role. road toll by 2010.
is firmly based on our core We worked consistently in The RTA is well positioned to
business, clearer accountabilities 1999/2000 to maximise the take advantage of the challenges
and delivering results in a cost efficiency of the road network, and opportunities facing us.
effective manner. promote alternative forms of We have and will continue to
In 1999/2000, the RTA continued transport and contribute to the sensitively balance the often
to develop and improve the State’s State Government’s “whole of competing needs of the
road network, with over $1.5 government” approach to community, interest groups and
PAUL FORWARD, CHIEF EXECUTIVE billion spent on construction and transport planning. individuals, and the competing
maintenance in both metropolitan Undoubtedly the greatest challenge
demands for funding.
and regional areas. we encountered in 1999/2000 I would like to extend my thanks
The RTA’s maintenance was preparing for the Sydney to the Minister for Roads, the
program was improved with 2000 Olympic Games and the Hon. Carl Scully, for his continuing
the implementation of a reform Paralympic Games. Over the last support and encouragement,
package that included the twelve months and more, the and also to our other stakeholders
introduction of a road RTA has worked closely with and commercial partners for
maintenance prequalification organisations such as the Olympic their positive involvement
scheme for local councils. Roads and Transport Authority, throughout 1999/2000. I would
SOCOG, OCA and other State especially extend my thanks to
Government agencies to develop all the staff of the RTA for their
comprehensive traffic and loyalty and commitment.
pedestrian plans for the Sydney Without them, the achievements
games. The RTA’s new Transport of the past twelve months would
Management Centre has played a not have been possible.
key role in coordinating major test
events, such as New Year’s Eve
1999, in preparation for being the Paul Forward
nerve centre for the entire Olympic Chief Executive
and Paralympic transport network.

(5) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:55 AM Page 6

MANAGEMENT
STRUCTURE

ROAD SAFETY AND ROAD ROAD NETWORK TRAFFIC AND CLIENT SERVICES
USER MANAGEMENT INFRASTRUCTURE TRANSPORT Director
Director Director Director David Stuart-Watt
Sue Sinclair Mike Hannon Chris Ford

Funder Purchaser

ROAD SAFETY AND ROAD ROAD NETWORK TRAFFIC AND TRANSPORT CLIENT SERVICES
USER MANAGEMENT INFRASTRUCTURE Improve the operational Act as the RTA’s principal agent
Reduce the trauma and cost to Maintain State Roads and bridges performance of the road network in managing the provision and
the community of road deaths in good condition at minimum through traffic control, driver procurement of road transport
and injuries.Ensure that drivers whole-of-life cost. Develop the information systems, management services to ensure best value for
and motorcyclists are eligible, State Road network focusing on of incidents and integrated route money. Provide professional
competent and safety-conscious. strategic routes. Contribute to management strategies. Plan advice in the development
Ensure that vehicles meet road the ‘Whole of Government’ and organise public transport and delivery of integrated road
worthiness, road impact and approach to transport planning. infrastructure improvements. transport solutions, specialist
road emission standards and that Manage National Highway and Improve pedestrian and cyclist technical support, and expert
they operate safely. Ensure that the Roads of National facilities and maintain traffic management of programs,
driver and vehicle transactions Importance programs. facility assets. projects, assets and the network.
are accessible and a high Ensure consistency of practice
standard of customer service across the State, the integration
is maintained. of programs at the local level, and
knowledge of local Government
and community needs.

(6) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:55 AM Page 7

CHIEF EXECUTIVE
OFFICER
Paul Forward

ENVIRONMENT AND
COMMUNITY POLICY
General Manager
Jay Stricker

OPERATIONS FINANCE CORPORATE SERVICES STRATEGIC PROJECTS


Director A/Director A/Director Director
Ulf Fraser Noel Hancock Catherine Herriman David Thomson

Provider Corporate Support

WARRINGAH FREEWAY, NORTH SYDNEY

OPERATIONS FINANCE CORPORATE SERVICES STRATEGIC PROJECTS


Provide comprehensive road, Develop and implement policies Develop and implement strategic Develop and co-ordinate special
bridge, traffic and driver and and practices to provide a contem- human resource plans and projects that impact on the long-
vehicle services across NSW. Act porary financial and commercial policies. Plan and manage the term role of the RTA and the road
as the RTA’s principal service management framework and deployment of information and traffic systems of NSW. This
provider and deliver services to manage the RTA’s finance functions. technology resources across area links the responsibilities of a
agreed levels of time, cost and Lead corporate and finance strategic the RTA. Provide legal and number of Directorates. Examples
quality on a commercial basis. planning, facilitate business business services to the RTA. of strategic projects include
planning and development of Manage internal and external Electronic Toll Collection Systems
performance indicators across the communications, including and Intelligent Transport Systems.
RTA. Monitor, evaluate and report media relations, communications
on the financial performance of the policy development, Ministerial
RTA in all key result areas. coordination, the development
and implementation of public
ENVIRONMENT AND education campaigns in support
COMMUNITY POLICY of RTA core programs, and the
Develop the RTA’s environmental corporate identity of the RTA.
management system and community
consultation processes. Provide
policy advice and guidance on
various environmental and planning
issues. Ensure comprehensive
environmental impact assessment,
community consultation,
environmental management
and compliance across the RTA.

(7) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:55 AM Page 8

HIGHLIGHTS
3

July August September


Dual carriageway on the Pacific Northbound carriageway of the Transport Management Centre
Highway between Henry Parry Federal Highway at Lake George (TMC) opened (3)
Drive & Renwick St, Wyoming, opened (2)
Traffic Emergency Patrols
completed (1)
commenced full-scale operations
Windale Pedestrian Bridge, part in Sydney and surrounds (4)
of the West Charlestown Bypass
Action for Bikes 2010 cycling
project, opened to pedestrians
strategy released
and cyclists

(8) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:55 AM Page 9

> 99/00

5 7

6 9

October November December


Bulahdelah to Coolongolook Road Safety 2010 strategy released Eastern Distributor opened in
Freeway opened (5) New primary school road safety central Sydney (8)
Roadcrack won the Engineering education resource Move Ahead On-line purchasing of number
R&D, Training and Processes with Street Sense launched plates commenced
category of the 1999 Engineering Country Road Safety Campaign Australian Road Rules introduced
Excellence Awards (6) featuring Testimonials television in NSW (9)
Vehicle Identification Inspection commercial commenced (7)
Final stage of Kamilaroi Highway
Units commenced operations to Upgrade in north west NSW
identify high risk and suspect officially opened
vehicles
Fixed digital speed camera
program introduced in NSW
Contract to install a new
Electronic Tolling System on the
Sydney Harbour Bridge and
Tunnel signed

(9) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:55 AM Page 10

HIGHLIGHTS 11

13

14

10 12

January February March


Traffic arrangements planned RTA 1999 Environment Report Variable Speed Limit signs in
and successfully managed for released (11) Sydney commenced operation (13)
New Year's Eve/New Year's Day RTA Big Ride cycling event held (14)
Erina Roundabout, at the
celebrations (10)
intersection of The Entrance Rd Widening of Cowpasture Road to
Successful implementation of and Carlton Rd, completed (12) four lanes between Elizabeth Drive
Y2K-compliant business systems and the Horsley Drive at Bossley
Park completed

(10) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:55 AM Page 11

> 99/00

50
15 18

17

16 19

April May June


Taree Bypass (final stage), Newcastle Call Centre opened (17) New Graduated Licensing
Tyndale, Woodburn & Eversons Scheme community information
Traffic arrangements planned and
Creek works on the Pacific campaign commenced
managed for Corroboree 2000
Highway opened to traffic
and Walk for Reconciliation across 106 councils introduced
Meadowbank Railway Bridge the Sydney Harbour Bridge 50km speed zones by end of
Pedestrian-Cycleway opened (15) 1999/2000 (18)
First Community Road Safety Forum
Traffic arrangements planned and held in Bathurst 5km of new bus lanes and
managed for World Cup 28km of transit lanes added to
Triathalon and Host City the road network by end of
Marathon Olympic Test Events 1999/2000 (19)
held in Sydney
City West Link Road from Balmain
Unveiling of the ANZAC statue Road to Boomerang Street opened
on the ANZAC Bridge (16) to traffic

(11) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:55 AM Page 12

>
Task How we are measured What we achieved in 1999/2000
MEETING STATE TRANSPORT NEEDS

Develop the State Road network – Achieve 40% dual carriageway – 22% of dual carriageway completed along Pacific Highway.
focusing on strategic routes to: along the Pacific Highway by – 91% of major projects (over $1M) completed were within budget or
– promote economic growth 2003. within 10% over budget.
– improve road safety – M5 East Motorway open to – 94% of major projects (over $1M) completed were within planned
– encourage greater use of public traffic in 2002. duration or within 10% over planned duration.
transport – M5 East Motorway on target for 2002 opening to traffic.
– meet environment targets. – Eastern Distributor opened to traffic.
– Continued the Pacific Highway upgrade program with openings of the
Bulahdelah to Coolongolook Freeway, completion of the Tyndale
Realignment north of Grafton, and the final section of the Taree
Bypass. Construction began on the Yelgun to Chinderah Freeway.
The improvements so far completed in this program have reduced the
journey times between Sydney and Brisbane by over half an hour.
– Other Country NSW improvements included the Hume Highway
Interchange at South Gundagai, the Illalong Deviation on the Burley
Griffin Way (MR84), completion of dual carriageway construction on
the New England Highway in Tamworth, the sealing of the Kidman
Way, and the construction of the Gobba Bridge Deviation.
– Completed and opened the remaining section of the 602km Kamilaroi
Highway to provide a continuous, dependable all weather road to the
north west portion of New South Wales.
– EISs for Cross City and Lane Cove Tunnels progressed on schedule.
– Completed the improvements to City West Link Road and
Heathcote Road.
– Woronora Bridge on schedule.

Actively contribute to the "Whole – Achieve zero growth in Vehicle – EIS for Liverpool–Parramatta Transitway prepared for August
of Government" approach to Kilometres Travelled per capita 2000 release.
land use and transport planning. by 2011. – Implementation of real time bus passenger system on Sydney Northern
Beaches trial route.
– Teleworking trial at Gosford conducted and to be extended to other
centres, including Penrith.

Maximise the efficiency of – Maintain average peak travel – Average peak travel speeds at or near 98/99 levels achieved even
moving people and goods by: speeds in Sydney at existing with increased traffic volumes.
– better managing the existing levels. – Transport Management Centre opened September 1999.
road network. – Increase the proportion of people – 5km of new bus lanes and 28km of transit lanes added to the road
– encouraging people to use using Bus and Transit Lanes. network.
alternative forms of transport to – Commencement of Traffic Emergency Patrols and Traffic Commander
the motor car (public transport, operations for Sydney Metropolitan Area and F3 Freeway.
cycling and walking). – Variable Speed Limit Signs along the M4 Motorway commenced
operation.
– Traffic management of various major events including the Walk for
Reconciliation, New Year's Eve celebrations, Gay and Lesbian Mardi Gras,
Host City Marathon, World Cup Triathalon, and Royal Easter Show.
– Contract signed for the development and installation of Electronic
Tolling systems for the Sydney Harbour Bridge and Tunnel.
– Action for Bikes – Bike Plan 2010 released September 1999.
– Opening of pedestrian and cycle way on the converted Meadowbank
rail bridge.
– RTA Big Ride from Tweed Heads to Sydney conducted.
– Support for Walk to Work Day

Actively participate in the – Reduce the cost to the New – Changes to NSW road laws under the Australian Road Rules
National road transport reform South Wales freight industry implemented from 1 December 1999.
process to achieve National laws of vehicles operating across – NSW implemented Combined Vehicle Standards to provide uniform
which improve efficiency, State borders. construction and equipment standards for all vehicles. This will
productivity and safety. benefit the community through increased consistency in vehicle
dimensions, common basic vehicle safety standards and uniform
smoke and noise standards.

(12) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:55 AM Page 13

DELIVERING
RESULTS
Task How we are measured What we achieved in 1999/2000
KEY RESPONSIBILITIES

Maintain State Roads and – 88% of State Roads quality rated – 90% of State Roads ride quality rated "good or better".
bridges to agreed economic, "good or better". – 36 targeted timber bridges were replaced or restored under the
technical and environmental Rebuilding Country Roads Program.
standards. – Bulahdelah to Coolongolook project received the International Erosion
Control Association Environment Award.
– Completed the sealing of the Cobb Highway (SH21) from Booligal to
Ivanhoe.
– Implemented a road maintenance reform package including the
introduction of single invitation contracts and a road maintenance
prequalification scheme for local councils.
– 1999 RTA Environment Report released.
– Roadcrack won the Engineering R&D, Training and Processes category
of the 1999 Engineering Excellence Awards.

Reduce the trauma and cost to – Reduce road fatalities to 500 per – At 577 fatalities, the 1999 road toll was the third lowest since 1950.
the community of road deaths annum by 2000. – The "Road Safety 2010" strategy was released in November 1999.
and injuries. – 106 Councils (covering 90% of the NSW population) have adopted
50 km/h urban speed zones.
– The Country Road Safety public education campaign was developed and
implemented to specifically address the rising road toll in country NSW.
– 23 fixed digital speed cameras were erected at sites with high crash
rates across the State.
– The ‘‘Three strikes and you're out’’ speeding program was established
to ensure that owners of heavy vehicles are also accountable for the
behaviour of their drivers.
– 21 Safe-T-Cam sites operating to monitor and modify behaviour of
heavy vehicle drivers and owners.
– Conducted a trial of vehicle-alcohol interlock devices aimed at
addressing recidivist drink drivers.
– Introduced Move Ahead with Street Sense, a new resource for educating
Kindergarten–Year 6 children about road safety.
– Community Road Safety Forum held in Bathurst to facilitate
communication with stakeholders.
– 1,162 primary schools participating in Safer Routes to School Program.

Ensure that drivers and motor – Maintain licensed driver levels – Licensed driver levels above Australian average.
cyclists are eligible and competent. above 94% (Australian average). – The Graduated Licensing Scheme developed for introduction from
1 July 2000.
– Passage of Road Transport (Driver Licensing) Amendment Act 1999
which provides for storage of images used to produce drivers licences,
proof of age cards and other licences produced by RTA.

Ensure that vehicles meet – Vehicles with serious defects – Vehicle Identification Inspection Units commenced operations.
roadworthiness, road impact and reduced. – A survey of heavy and public passenger vehicles including B-doubles,
emission standards and that they – Proportion of New South Wales road trains and buses indicated major defect rates of 4% or less. This
operate safely. motor vehicles tested against result was less than the overall rate of 7% for all vehicle categories in
exhaust emission standards. the 1998 survey.
– Botany and Penrith vehicle exhaust emission testing facilities operating.

CUSTOMER SERVICE

Ensure that drivers and vehicle – Maintain "good or very good" – Customer satisfaction rated at "good or very good" by 91% of
transaction services are Motor Registry customer customers surveyed.
accessible and that the high satisfaction at 90% or above. – Newcastle Call Centre commenced operations.
standard of customer service is – Increase the range of RTA services – Online selection and ordering of number plates from the RTA website
maintained. provided at Motor Registries. implemented.
– E-commerce transactions over the internet trialed for selected car
dealers, and registration renewal of trailers and some business vehicles.
– Driver Knowledge Test question bank published on the RTA website to
improve knowledge of road rules, particularly for new drivers.
– Successfully implemented Y2K-compliant business systems.

(13) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:55 AM Page 14

> FINANCIAL
OVERVIEW
TOTAL ROADS PROGRAM
The amount expended on the 1999/00 roads program was $2,310
million, compared with the revised budget of $2,311 million for the
year. Accounting adjustments of $134 million, which relate to an
actuarial reduction to the unfunded superannuation liability, reduces
the RTA's total expenditure in the year to $2,176 million. In achieving
this result, we met Government commitments to specific initiatives,
including Action for Transport 2010, the Pacific Highway Upgrading,
Western Sydney Roads, and Rural and Regional Roads Programs.

FUNDING SOURCES
Of the funding received during the year, State sources contributed
some $1,855 million or 85 percent which was approximately $61
million more than in 1998/99. The Federal Government contributed
$326 million, or 15 percent of total funding, for National Highways in
NSW, roads of national importance, accident blackspot treatments and
under the Interstate Road Transport Act, 1985. The Federal
Government contribution was approximately $0.9 million more than
the funding provided in 1998/99.

OUR FINANCIAL PERFORMANCE


A summary of our financial performance in 1999/00, as compared
to previous years, is shown in the Table below:

Notes Result Result Result Target Result Target


96/97 97/98 98/99 99/00 99/00 00/01
Financial Performance Indicators
Debt Servicing Cost as % of Roads Program 6.8 7.1 5.4 5.3 4.4 5.3
Asset Sales ($M) 1 16.1 31.5 34.5 35.1 38.7 29.1
Interest Earned
– Hourglass Facility 2 6.8 5.0 5.0 5.5 5.5 5.5
– Other Institutions 6.6 5.2 5.0 5.4 5.4 5.4

General Notes
The RTA is a budget dependent agency funded by the State and
Federal Governments. Many standard financial ratios are therefore
not applicable.
1. Sale of surplus real properties including those acquired for
roadworks, and which are no longer required. All dollar amounts
reported in nominal terms.
2. Target represents benchmark rate as advised by Treasury Corporation.

(14) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:55 AM Page 15

FEDERAL EXCISE DUTIES Figure 1 – Source of Funds 1999/00 $2,176M


Following a High Court decision in August 1997 that declared State-
based franchise fees invalid, arrangements were entered into between
the States and the Federal Government to increase excise duty on fuel
imposed by the Federal Government. The increase in duty on fuel was
paid to the States, less an administration fee. During the year $616
RTA Revenue & Other Funds $280M Federal $326M
million was received, which excluded rebates paid by State Treasury
from gross Federal excise payments. This arrangement ceases as part of Other Consolidated Funds $67M M4/M5 Cashback $35M
the Federal Government Tax Reform Package commencing 1 July 2000.
Fuel Levies $616M Motor Vehicle Tax $728M
In accordance with an amendment enacted to the Road Improvement
(Special Funding) Act in 1998, 44.5 percent of funds received from the
Untied Road Funding $124M
Federal Government under the above arrangements, less certain
rebates paid by the State, were made available for the ‘3x3’ program.

GOODS AND SERVICES TAX (GST)


The legislation passed on 8 July 1999, as part of the Federal
Government’s tax reform package requires business enterprises with a
turnover exceeding $50,000 a year to be registered for GST purposes.
The official commencement date is 1 July 2000 although under certain Figure 2 – Expenditure 1999/00 $2,176M
transitional arrangements announced by the Australian Taxation Office,
some contracts entered into before this date to provide goods and
services may be subject to GST.
We will be affected by the introduction of the GST in a similar manner
to most other business enterprises that are registered for GST
Voluntary Redundancies $4M Network Development $933M
purposes. In many instances we will be required to adjust our business
processes and systems to account for the GST. However, under the Infrastructure Maintenance $563M
Inter-Government Agreement there are provisions to exclude particular
RTA fees and charges from the GST. The mechanism by which this is
achieved is Division 81, titled A New Tax System (Goods and Services
Tax) (Exempt Taxes, Fees and Charges) Determination 2000 (No.2). Debt Servicing $100M Traffic & Transport $213M
The Federal Treasurer’s determination exempts the fees and charges on
the Division 81 listing from being subject to GST. Road Safety & Road User M4/M5 Cashback $36M
Management $327M
A project team was created as part of the RTA’s preparation for
implementing the GST.
The project team presented GST information sessions in corporate
and regional offices to representatives of all Directorates and technical
sessions were also delivered to administrative staff to create an
awareness of tax invoice processing requirements.

(15) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:55 AM Page 16

>> ENSURING TRANSPORT


EFFICIENCY

(16) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 17

> THE MAIN CONTROL ROOM OF THE RTA


TRANSPORT MANAGEMENT CENTRE,
OPENED IN SEPTEMBER 1999

(17) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 18

ENSURING TRANSPORT
EFFICIENCY

Figure 3 – Speed and traffic volume trends Maximise the efficiency of There is an ever-growing demand
for seven major routes to and from Sydney moving people and goods by: on existing roads and traffic
– better managing the existing facilities as our economy grows
45 70 road network and more drivers and vehicles use
– encouraging people to use the road system. In response, we
alternative forms of have put an increasing emphasis
40
transport to the motor car on continually improving the
60
(public transport, cycling management and use of the
35 and walking). existing network. A key challenge
for transport efficiency is to
% Change in Volume Since 1990

50 encourage people to use their cars


30 less and opt for the use of public
transport, bicycles and walking.
Avergae Speed (km/h)

25 40 KEEPING THE TRAFFIC


FLOWING
Improvements in 1999/00
20 focussed on:
30
– maintaining consistent travel
times for motorists, particularly
15
during peak hours, by reducing
20 congestion and delays
10 – minimising disruption to traffic
flow by responding more
10 efficiently to incidents, and
5 – helping road users navigate the
road system more effectively.
1991

1992

1993

1994

1995/96

1996/97

1997/98

1998/99

1999/00

0
1990

0 More consistent
travel times
During 1999/00 our programs
PM Speed AM Speed % Change succeeded in maintaining
in Traffic Volume consistency of peak travel times
on the State Road network
in Sydney. For the overall
metropolitan network, average
speeds in 1999/00 were 36km/h
for the AM peak and 39km/h for
the PM peak, which were similar
to speeds over the last four years.
On the seven major routes to
and from the Sydney CBD,
average speeds in 1999/00 were
31km/h for the AM peak and
38km/h for the PM peak. The
trends in the average speeds for
these major routes are compared
with the increase in traffic volumes
on these routes in Figure 3.
Despite traffic volume growth
over the past ten years of 38
percent, the average peak speeds
on the seven major routes are
consistent with previous years.

(18) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 19

The RTA has a key role to play in


ORTA's plans by providing and
managing the road system
(including route and traffic
management) which will transport
the Olympic and Paralympic
Family, spectators and Games
workforce to Sydney Olympic
Park, Homebush, and the many
other Olympic venues around
Sydney. As well, the RTA is
responsible for ensuring that
the daily non-Games travellers
have maximum access to the
road network.
Other State departments and VARIABLE MESSAGE SIGNS CONTROLLED
FROM THE TMC INFORM MOTORISTS
agencies working with ORTA are OF CHANGING TRAFFIC CONDITIONS
Department of Transport, State
Rail Authority, State Transit
Authority, Bus 2000 and NSW
Taxi Council.

SPECIAL EVENTS AND 2000 closing the Bridge to traffic for


Reducing traffic disruptions Some key initiatives for the OLYMPIC AND PARALYMPIC some nine hours and assisting in
management of road incidents GAMES crowd management of about
The management of unplanned for the year included: 150,000 people. The success of
Traffic Management Operation
incidents and planned community – appointment of Traffic this event demonstrated our
Plans were completed for all
events that occur on NSW roads Commanders to assume primary ability to handle the challenges
Sydney 2000 Olympic and
is an issue of key importance to responsibility for traffic of major community events.
Paralympic Games venues, routes
the community and the NSW management around incident and road events. ELECTRONIC TOLLING
Government. Because of the scenes on major roads
extra activities and major events The Royal Easter Show at The RTA is installing a new
– establishment of 24 hour-a-day, Electronic Tolling System on the
scheduled for the lead-up to the Homebush Bay in April 2000 was
7 day-a-week Traffic Emergency Sydney Harbour Bridge and is
Sydney 2000 Olympic and an official test event for the Games.
Patrol service for motorists along working with the Sydney Harbour
Paralympic Games we placed It provided further opportunity
major routes in Sydney and on Tunnel company to install it for
greater emphasis on this area for the RTA and ORTA to work
the F3 Freeway the tunnel. A contract for the
during the year. together to develop transport
– development of a Driver Aid installation of this system was
options for Homebush Bay, such
TRANSPORT Scheme of Variable Message signed in December 1999 with
as regional bus services, and
Signs (VMS) and cameras on the Abigroup/Q-Free and a staged
MANAGEMENT CENTRE special event clearways and
F3 Freeway trial of all aspects of operation is
Our Transport Management parking schemes, while still
– installation of 45 Variable Speed continuing. The system will make
Centre (TMC) was opened in catering for the other road users
Limit (VSL) signs on the M4 it easier for motorists to pay the
September 1999 and is providing in the area. Some 275,600
Motorway to allow displayed toll and ease congestion around
innovative and integrated spectators used regional buses
speed limits to be adjusted in the tollbooths.
management of the State’s road during the 2000 Easter Show.
response to prevailing traffic
network. It is designed to take a In March 2000 a field trial
conditions Similar arrangements were
whole-of-Government approach demonstrated that Melbourne
– implementation of 30 new trialed during events at Stadium
to meeting road based transport tags could be read by the system
VMS across the Sydney Australia at Homebush Bay,
needs, including public transport, being installed on the Harbour
metropolitan area including the 1999 NRL Grand
by placing key operators and the Bridge. This is a major milestone
– further expansion of closed Final and Bledisloe Cup matches
Police Service side-by-side. in achieving interoperability for
circuit television coverage across with near capacity crowds. We
The TMC will also provide a Sydney, and were also involved in planning tolling systems within Australia.
command capability for managing – attachment of a Police Liaison and operations for sporting and This was a vision of the Australian
the transport task of the Sydney Officer, and two support officers cultural test events at the other Transport Council in 1998 when it
2000 Olympic and Paralympic to the Transport Management Homebush Bay venues and adopted a standard for Electronic
Games as well as other major Centre, to further assist the preparation for Olympic venues Tolling in Australia. Other tollways
events leading up to, and working relationship between across Sydney, including special are working with the RTA to make
beyond, 2000. the two agencies. event traffic arrangements for their systems compatible.
The main role of the TMC is to major events held in the Moore
OLYMPIC ROADS & Park precinct at the Sydney IMPROVED SIGNPOSTING
ensure the road network is In partnership with Tourism
TRANSPORT AUTHORITY Cricket Ground and Sydney
available to run to its capacity NSW and the NSW Council
(ORTA) Football Stadium. The on-road
and this is achieved by managing of Tourist Associations, we
ORTA was established by the Olympic events such as the
unplanned incidents and special continued to play a lead role in
State Government in 1997 to Marathon and Triathlon were
events, disseminating information the development of new tourist
coordinate all transport during successfully trialed. We also
and optimising the operation of signposting strategies. Emphasis
the Sydney 2000 Olympic and played a significant role in the
traffic systems. It is the hub for was on new Visitor Information
Paralympic Games, including planning of the Olympic Torch
identifying and directing the Network signposting (‘i’ signs)
roads, public transport and Relay throughout NSW.
response to incidents such as and State border and tourism
pedestrian and cyclist movement
crashes, breakdowns and spills, NEW YEAR’S EVE 1999 region ‘welcome’ signs.
in Sydney.
passing on information through The success of the traffic and
radio reporters and variable transport arrangements for the
message signs, fine tuning 1999 New Year’s Eve celebrations
coordinated traffic signals and was a major achievement for the
controlling other traffic operations. RTA and the other agencies
involved. The planning for
Corroboree 2000 and the Walk
for Reconciliation across the
Sydney Harbour Bridge which
took place in May 2000 involved

(19) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 20

Signposting was also a major SHARING THE ROAD More and better cycling
feature of the transport For some years we have been networks
preparations for the Sydney 2000 running public education
Olympic and Paralympic Games. In Sydney, eight cycleway
campaigns under the theme
We developed, designed and projects which form part of the
The Road is There to Share to
installed an estimated 15,000 principal bicycle network were
promote a better understanding
guidance and regulatory signs fully funded by the RTA and we
for venues, Olympic family and of traffic facilities and the rights
assisted councils on a dollar-for-
regional bus routes, special of different road users. This
dollar basis with a further 40
event clearways, special event program continued in 1999/00.
local cycleway projects.
parking arrangements, park This year, public education
and ride schemes, and bus Major cycleways completed
campaigns were largely associated
and rail interchanges. included:
with the introduction of uniform
PUBLIC TRANSPORT Australian Road Rules, including – conversion of the old railway
In line with the Government’s new rules for roundabouts and bridge from Meadowbank to
integrated transport objectives giving way to buses pulling out Rhodes to a pedestrian and
outlined in Action for Transport from the kerb. Themes of other cyclist path
2010, we are committed to public education campaigns – construction of a pedestrian and
improving priority for buses included promoting buses as a bicycle path ramp from Victoria
along major road corridors, on mode of travel, introducing the Road to the ANZAC Bridge
cross regional bus routes and to new variable speed limit signs – stage I of the Homebush to
transport interchanges, through and generally reinforcing Sydney CBD cycleway, and
a program of improvements to messages on sharing the road with – concept design of Homebush
public transport infrastructure. buses, bicycles and pedestrians. Bay to Fairfield cycleway.
Bus priority measures target In rural and regional NSW, 100
impediments to efficient bus
CYCLISTS
cycleway projects were completed
Cycling is an economic and
operation and include bus lanes, during the year including:
efficient means of travel,
transit lanes, priority traffic signals
as well as being healthy and – Swansea: Channel Street Stage I
and bus bays along existing major
environmentally friendly. In NSW, cycleway, Sandgate Road
bus corridors as well as rapid bus-
there are nearly 2 million bicycles Cycleway at Newcastle
only transitways.
with almost half of all households – West Charlestown: bypass
In 1999/00, the program having at least one bicycle. cycleway
achieved: – Minnamurra to Dunmore:
We are committed to promoting
– an increase in the total length cycleway
facilities for cyclists and making
of transit lanes by over 28km – Gwynneville to North Wollongong:
it safer to cycle. In September
– an increase in the total length cycleway
1999, the Government released
of bus lanes by over 5km – Nyngan: extension of cycleway
Action for Bikes – BikePlan 2010,
– provision of a comprehensive – Grafton: cycleway from bridge to
a four-point plan designed to
Sydney CBD bus priority scheme, Charles Street
improve the bike network, make
including red colouring of – Tamworth: Calala Lane cycleway,
it safer to cycle, improve personal
dedicated bus lanes to make and
and environmental health and
them easily visible to motorists – Wagga Wagga: cycleway.
raise community awareness of the
– implementation of a package of benefits of cycling.
bus priority works, associated
Action for Bikes – BikePlan 2010
with the opening of the Eastern
sets out a costed 10-year plan
Distributor
for the provision of cycle facilities
– upgrading of signposting and
and for the promotion of
linemarking on every transit lane
cycling. It includes commitment
in the Sydney metropolitan area
for the RTA to build off-road
– progress on the Liverpool to
cycleways wherever practicable
Parramatta Transitway
when new roads are built and to
– improved bus stop facilities
create off-road cycleways
throughout rural NSW,
wherever possible.
– public education campaigns
encouraging the use of public
transport, and
– a trial of bus passenger
information systems on the
Northern Beaches.
The red colouring of the George
Street bus lane in the city has led
to reductions in illegal usage by
up to 70 percent.

(20) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 21

We continued to assist ORTA in


its promotion of teleworking as
an alternative to commuting
during the Sydney 2000 Olympic
and Paralympic Games. This
included responding to enquiries
from businesses seeking assistance
in setting up teleworking
programs and alternative office
sites (satellite offices/telecentres)
for the Games period.
CAR POOLING
We undertook market research
to investigate the potential for
providing car parking facilities
for commuters who live on the
Central Coast and who informally
car pool to and from Sydney each
day. Key findings were:
– the majority of people start their
journey between 5am and 6am
– 92 percent use their own vehicle
Australian Road Rules commuters, school children, the Traffic in local streets to get to the car park
for Cyclists elderly, people with disabilities, – on average, each vehicle carries
recreational walkers and tourists. Our partnership with local
In December 1999, the new three people including the driver
The plans identified existing councils is the cornerstone of
Australian Road Rules introduced – the majority car pool five days
facilities and determined where local street environment
several changes to cycling rules, a week
access and mobility needed to initiatives which promote the
including permitting children – surfaces and security are the
be improved. management and reduction of
under 12 years of age to ride on main problems with car parks,
through-traffic in mainly high
footpaths and allowing cyclists PAMPs have been developed and
pedestrian concentration areas,
to turn right from left-hand lanes for Marrickville, North Sydney, – with the exception of Kariong,
such as residential and town
at multi-lane roundabouts. Bankstown, Burwood, Canterbury the majority are satisfied with
centres. Measures to improve
The new rules were promoted and Hurstville. Other plans are location of car parks.
the amenity of these streets
through a statewide public being developed in Auburn, included traffic calming
Blacktown, Blue Mountains, WORKING WITH OTHERS
education campaign. treatments such as roundabouts Although we have the lead role
Campbelltown, Fairfield, and slow points. Projects
Liverpool, Penrith, Strathfield in managing traffic, we do not
Special events and completed in 1999/00 included:
and Willoughby. work alone. In 1999/00, we:
promotions
– Balmoral: The Esplanade – continued to work in partnership
We sponsored a number of We supported the Pedestrian – Rydalmere: Kirby Street, and
Council of Australia, which with local councils in managing
bicycle events including: – Morpeth: Main Street. the road network, delivering
facilitated the 1999 Pedestrian
– Bike Week which encourages the Summit and Walk to Work Day traffic and transport programs,
TELEWORKING
use of bicycles and promotes 1999. These activities encourage and meeting local community
Following the successful
safe cycling walking as a travel option and needs
1998/99 trial of the West
– the RTA Big Ride which educate the community to – consulted with major community
Gosford telecentre established
celebrated its 10th anniversary reconsider travel choices and groups representing different
for our staff who live on the
with a 1,100km trip from Tweed reduce car use. road users, ensuring traffic
Central Coast and commute to
Heads to Sydney, and management solutions balanced
Other programs for pedestrians either Sydney or Newcastle,
– RTA Cycle Sydney which often conflicting requirements,
included: we expanded teleworking
encourages new cyclists, including and
opportunities for other staff. The
families, to cycle in Sydney. – pedestrian bridge program – conducted ongoing research into
centre provides opportunities for
funded by commercial community expectations and
PEDESTRIANS staff to work for part of the time
advertising with priority given to satisfaction with traffic facilities
During the year we worked on a closer to home. Plans are also
providing bridges near schools and services.
number of initiatives to improve underway to establish a second
– installation of tactile push telecentre at Penrith for staff
pedestrian movement and safety. buttons and kerb ramps to assist living in western Sydney and
One major initiative known as pedestrians with visual and the Blue Mountains areas.
Pedestrian Access and Mobility mobility impairments
Plans (PAMPs) continued in – installation of traffic signals and The telecentres are models
partnership with local councils to construction of pedestrian for the NSW Government
improve planning for pedestrians. crossings at various locations Telecentre Program currently
It involved drawing up plans for a – implementation of school zones being established by the NSW
specific locality, which recognised to enhance pedestrian amenity Premier’s Department.
the particular needs of and safety at 130 sites, and We continued to provide
– appointment of supervisors at an information on teleworking
extra 19 school crossing sites. to business, commuters, other
Government departments and
agencies and the community
through our website
(www.rta.nsw.gov.au/telework).

(21) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 22

DEVELOPING THE ROAD


NETWORK

>> (22) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 23

> THE $140 MILLION BULAHDELAH TO


COOLONGOLOOK FREEWAY, NORTH OF
NEWCASTLE, OPENED IN OCTOBER 1999

(23) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 24

DEVELOPING THE
ROAD NETWORK

Develop the State Road By providing an efficient road Transitways The WSO will be the final link in
network focussing on strategic network for both passenger and Sydney’s high standard orbital
One of the strategies proposed road network, connecting all of
routes to: freight requirements, the RTA
in Action for Transport 2010 is Sydney’s motorways (M5, M4
– promote economic growth makes a vital contribution to the
a network of rapid bus-only and M2) and providing high
– improve road safety economic development of NSW
transitways for western Sydney. standard access to and from all
– encourage greater use of and to the NSW Government’s
The first of these transitways to parts of Sydney as well as linking
public transport Action for Transport 2010. Launched all major employment and
be constructed will be the
– meet environmental targets. in 1998, this ten year strategic residential areas. It will bypass
Liverpool to Parramatta transitway
plan outlines the transport and 56 sets of traffic signals and
(LPT) which will enhance travel
road initiatives NSW needs to save up to one hour in travel
choice and reduce travel times
take into the new millennium. time between Liverpool and
for the 500,000 people who Pennant Hills.
Improvements to the road live in the Liverpool, Fairfield,
network impact directly on the Holroyd and Parramatta Local The proposal will encourage
more efficient movement of Government areas. It will link further investment in new
produce which, in turn, enables major residential areas with the industries due to potential
industry to be more efficient, employment zones of Smithfield savings in transport costs,
reduces costs and leads to job and Wetherill Park. create up to 1,200 jobs during
creation. During the year, in construction, and, by lowering
The LPT will be 30km long transport costs, encourage more
consultation with the Department
and is estimated to cost $200 jobs in western Sydney. The
of Urban Affairs and Planning and
million. During 1999/00 an Environmental Impact Statement
other regulatory authorities, we
Environmental Impact Statement is being prepared in consultation
continued developing the
(EIS) was drafted and concept with the Federal Government.
following projects:
plans prepared. The EIS will be
released in August 2000. Some 200,000 newsletters on
Cross City Tunnel
Expressions of interest for the the proposed WSO were
The Cross City Tunnel will operation of the network have distributed in Arabic, Chinese,
comprise twin, two-lane tunnels been evaluated and, subject to Croatian, Greek, Japanese,
which link the Kings Cross tunnel satisfactory environmental Korean, Serbian, Spanish, Turkish,
with the Western Distributor. The assessment, construction will be and Vietnamese. An 1800
project is estimated to cost $400 completed in 2003. Further work information line was provided
million and will be electronically on the Western Sydney Transitway using the same ten languages.
tolled. By removing the east-west Network Overview Report is
traffic from the surface road underway and is expected to Lane Cove Tunnel
network, the environmental be released in 2001. The Lane Cove Tunnel project
quality of central Sydney will will link the M2 with the Gore
be improved, travel times Western Sydney Orbital Hill Freeway and complete a
reduced and accessibility within missing motorway link
The proposed Western Sydney
central Sydney greatly improved. connecting the north west sector
Orbital (WSO) will comprise
The network of bus lanes will be of Sydney with the CBD. It will
about 39km of new divided
also extended. be 3.4km long and is estimated
carriageway motorway
During 1999/2000 there was including major grade separated to cost $550 million. The project
extensive consultation over design interchanges at 15 locations is proposed to consist of twin,
options and an Environmental between the M5 and the Hume two-lane tunnels and will be
Impact Statement (EIS) was Highway at Prestons, and the M2 electronically tolled. It includes
prepared for release in August at West Baulkham Hills. It will be widening the Gore Hill Freeway
2000. Subject to satisfactory part of the National Highway to provide transit lanes to
environmental assessment, work system through Sydney and, as improve bus travel. North facing
will commence in 2001 and be such the Federal Government is ramps at Falcon Street on the
completed in 2004. responsible for funding its Warringah Freeway will also form
construction and maintenance. part of the project.
Estimated cost of the project is An overview report on the Lane
$1.2 billion. Cove-Gore Hill corridor which
examined the impact of the
proposed tunnel on the corridor
was released in December 1999.

(24) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 25

Travel times for motorists and City West Link


bus passengers will be significantly
reduced. Less traffic will use The section of the City West Link
Epping Road and the Local Road between Balmain Road and
network. Pedestrian safety will Dobroyd Parade, Haberfield was
also improve. An Environmental substantially completed in
Impact Statement (EIS) will be 1999/2000. Involving complex
released in early 2001 and construction above the railway
subject to approval, construction at Lilyfield, and a new bridge
is planned to begin in 2002. over the Hawthorne Canal, the
IMPROVING ACCESS link provides a new arterial road
WITHIN SYDNEY from the west to the City Centre
During 1999/2000 several major via the new Anzac Bridge.
road projects were completed
Woronora Bridge
and opened to traffic, and others
were under construction. Construction is continuing on
schedule on a new four lane
Eastern Distributor bridge over the Woronora River
In December 1999 the Eastern at Woronora. With upgraded
Distributor was opened to traffic approach roads, the bridge will
as a toll road. Together with replace the old two lane low-
the widening of Southern Cross level bridge and its hairpin bend
Drive it provided motorway approaches, which are notorious Elizabeth Drive
conditions between the Sydney for traffic delays and for large
vehicles becoming stuck. The As an important bus route and
Harbour Tunnel and Sydney access road between the growing
airport. It forms an eastern communities on both sides of
the river will no longer be suburbs of south western Sydney
segment of the Sydney Orbital. and the town centres of Liverpool
In addition to providing subject to such delays when
the new bridge opens to traffic and Cabramatta, Elizabeth
congestion-free access to the Drive has been widened
airport from the City centre later in 2000.
between Cowpasture Road
and the north shore, the Eastern and Cabramatta Road.
Windsor Road/Old Windsor
Distributor has rejuvenated the
Road
environment of East Sydney, IMPROVING ACCESS
Darlinghurst and Surry Hills. Construction continued on BETWEEN CITIES AND
upgrading Old Windsor Road REGIONS
M5 East Motorway with the following works We are undertaking programs on
Work on this $750 million scheduled: five of the major routes that link
project, the largest infrastructure – upgrading of Old Windsor the greater metropolitan area TUNNELLING WORK IN PROGRESS ON
road project to be built to date Road from Seven Hills Road to and regional NSW. THE M5 MOTORWAY EXTENSION
under an RTA contract, is on Schofields Road/Windsor Road
Princes Highway
schedule to open mid-2002. to a four-lane divided road New England Highway
The new 10km four-lane dual – upgrading of Windsor Road to a Our goal is to provide four
Our goal is to provide 80
carriageway will run from the four-lane divided road from lanes from Sydney to Kiama by
percent dual carriageway
existing M5 at King Georges Schofields Road to Garfield Road 2010 as outlined in the State’s
between Newcastle and
Road, Beverly Hills, to General – construction of a high level flood Action for Transport 2010.
Muswellbrook by 2010. Planning
Holmes Drive at Sydney Airport. evacuation route across South Works underway include
for the Muswellbrook bypass is
The construction of the 4km Creek at Windsor, in conjunction the Oak Flats interchange and
well advanced and further
long tunnel between Bexley with Department of Land and preconstruction work for the
consultations were held over
Road and Marsh Street began Water Conservation North Kiama Bypass. New ramps
options in the vicinity of Allandale
in June 1999 and the 0.5km – provision of new traffic signals at to and from Helensburgh are
for the F3 to Branxton link.
long tunnel under the Cooks a number of intersections on under construction.
The progress of these works is
River in September 1999. A Windsor and Old Windsor Roads
F5/Hume Highway dependant upon the level of
3.3km section for a cycleway – completion of works on the
funding provided by the Federal
around the western side of Windsor Road intersection at
Investigations into the provision Government as part of the
Sydney Airport was opened in Schofields Road and on the Old
of additional on/off ramps on National Highway Program.
December 1999. Windsor Road at Sunnyholt Road
this National Highway in the
and Balmoral Road, and Federal Highway
The completed M5 East Campbelltown area are underway.
– upgrading of Windsor Road to a
Motorway will provide a fast, four-lane divided road from The third stage of the Federal
Great Western Highway
reliable freight link between the Roxborough Park Road to Highway upgrade at Lake
growing industrial areas in South Showground Road. In August 1998, the NSW George was opened in August
Western Sydney, Sydney Airport Premier announced a $360 1999. This 12km stretch of
and Port Botany. It will reduce Cowpasture Road million program for the provision northbound carriageway along
noise and traffic on local streets, of four lanes from Penrith to the scenic shores of Lake
particularly from heavy vehicles, In March 2000 the widening of
Katoomba and other works to the George, completes 24km of
and improve road safety. Cowpasture Road to four lanes
west of Katoomba. Subsequently, road works that began in 1996.
was completed between
the Federal Minister for Transport The completion of the Federally
Elizabeth Drive and The Horsley
and Regional Services committed funded Lake George project was
Drive at Bossley Park. In a rapidly
an additional $100 million to the a major step in the provision of
developing part of south western
route as a Road of National dual carriageway conditions
Sydney, this widening has
Importance. Works currently from the Hume Highway to the
provided safe access to and from
underway are at Linden Bends ACT and provides motorists
local residential side streets, as
and Faulconbridge. Advanced with improved travel times
well as an important north-south
planning is underway for Leura and road safety benefits.
route for commercial traffic.
to Katoomba, Shell Corner,
Medlow Bath bridge replacement,
Soldiers Pinch and Hartley Vale.

(25) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 26

Rebuilding Country Roads UPGRADING THE PACIFIC – March 2000


Program (RCRP) HIGHWAY commencement of construction
In January 1996 the Pacific of Tandys Lane upgrade
Under Action for Transport 2010, – March 2000
the RTA is committed to spending Highway Reconstruction Program
Agreement was signed by the display of Environmental Impact
at least $100 million a year on Statement for Coopernook to
this program, with $117 million Federal and NSW Governments.
It involves Federal financial Moorland
spent in 1999/00. The program – April 2000
aims to: assistance for improvements to
the Pacific Highway from July completion of the final section
– support the rural industry and 1996 to June 2006. on the Taree Bypass, and
underpin export competitiveness – June 2000
by focussing road investments The ten-year agreement requires completion of the Tyndale
towards the needs of the road the NSW Government to maintain Realignment, north of Grafton.
transport industry, including its its existing commitment of $100
role in providing efficient rail million a year to the Pacific Bulahdelah to Coolongolook
transport, and Highway for major projects, Freeway opened
– ensure country roads are wide maintenance and minor works,
plus an additional $120 million a The $140 million Bulahdelah to
and strong enough for legal Coolongolook Freeway, north of
travel as well as being available year funded equally by the NSW
and Federal Governments ($60 Newcastle, was officially opened
for travel in a safe, reliable, in October 1999, two months
consistent manner without million each).
ahead of schedule. The 22km
undue delays, especially during The $2.2 billion program has dual carriageway project is the
prolonged periods of wet already achieved some important biggest single stage of the $2.2 Yelgun to Chinderah Freeway
weather or flooding. milestones during its first four billion Pacific Highway upgrading
years, with 14 major projects A $2 million road safety package
The program involves major program completed to date. was put in place on the
works to renew road and bridge and 16 additional projects
opened to traffic, construction The project bypasses over 60 Burringbar Range, south of
infrastructure to the latest bends, including two of the most Murwillumbah, after a spate of
standards, rather than simply currently underway at 9 sites
and 16 projects being planned. notorious highway blackspots at serious and fatal accidents
patching roads that were built Wootton and O’Sullivans Gap. In identified parts of the road as
to previous standards. Roads The NSW Government is the last 10 years the old section of blackspots.
and bridges that are important committed to developing the highway saw 658 accidents in
to rural industry are being whole Pacific Highway as a dual The Yelgun to Chinderah
which 35 people died and 402 Freeway, which commenced this
restored or replaced. It illustrates carriageway route. Action for were injured.
the State Government's long Transport 2010, released in year will completely bypass the
term commitment to rural December 1998, confirms this The new freeway now provides Burringbar Range bringing
areas by investing for the next commitment and the NSW a safer, easier journey for the enormous benefits in terms of
generation of country industries Government is looking to the 11,000 vehicles that travel the improved safety and travel times
and communities. Federal Government to match the route each day. for motorists passing through
NSW commitment by continuing the scenic Tweed Valley. It will
The first stage of the RCRP The project also included
the existing joint funding be the biggest project undertaken
includes the $129 million extensive environmental
arrangement beyond 2006. in the $2.2 billion 10 year Pacific
Country Timber Bridge Program. initiatives including:
Highway upgrading program.
140 timber bridges are being Major highlights of the upgrade – landscaping with more than The new freeway, which will be
replaced or restored. Thirty six program during 1999/2000 85,000 native trees and shrubs built at a cost of $348 million
were completed by 30 June 2000. included: – construction of five green- will be a major engineering
– August 1999 thighed frog underpasses and achievement and will include:
Kamilaroi Highway extensive biological studies of
environmental approval for – 28.6km divided dual carriageway
On 13 February 1999, the Brunswick Heads to Yelgun the species
separated by medians up to
602km Kamilaroi Highway project to proceed – 18 fauna underpasses and 30km
11m wide
was officially proclaimed by the – September 1999 of ‘floppy top’ fencing to direct
– 59 bridges over creeks, roads
Minister for Roads, with the display of Environmental Impact animals to underpasses and
and drains
final 64km sealed link being Statement for Bangalow to prevent them accessing the
– 3 major road interchanges/
completed in December 1999. St Helena highway, and
intersections, and
The project was a team effort – October 1999 – preservation of Aboriginal
– a tunnel under Cudgen Road.
with funding provided by the completion of the Bulahdelah to artefacts.
State Government, the sealing Coolongolook Freeway A number of features have also
The project also included nine
program managed by the RTA, – December 1999 been included to make sure local
bridges, four arch structures and
and the work carried out by the commencement of construction fauna and flora are protected.
two cattle and machinery
Walgett and Brewarrina Councils. of Coolongolook to Wang Wauk These include fauna over/under
underpasses. It has two fully
– December 1999 passes, seed collection and
The highway, named after the equipped rest areas and 21 car
display of Environmental Impact germination of local species
Kamilaroi Aboriginal people pull-over spots to encourage
Statement for Karuah bypass for future landscaping and soil
of north western NSW, now motorists to break their journey
– February 2000 erosion and sediment controls.
provides a dependable all and Stop. Revive. Survive. to
commencement of studies for Archaeological site management
weather road to the north west prevent driver fatigue.
upgrade at Bulahdelah and koala studies have also
portion of NSW for local residents, been included.
the trucking industry and the – March 2000
tourist industry. commencement of construction
of Yelgun to Chinderah Freeway
– March 2000
environmental approval for
Bonville Deviation project to
proceed

(26) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 27

PROGRAMS WITH CONTRACT MANAGEMENT Figure 4 – Return on Construction Expenditure


ECONOMIC RETURNS As an outcome of the
During the year, our Road cooperative approach developed
through the NSW Construction 50 95/96 Funds
Network Development Program
expenditure was nearly $750 Policy Steering Committee 96/97 Funds
million (including State and (CPSC) we continued to 97/98 Funds
Federal funding) on major support industry development 98/99 Funds
construction projects of over $1 to improve productivity. 99/00 Funds
million each. This expenditure 40
There was continued focus on
continued to provide the improving the management
community benefits at least three of occupational health and
times greater than its cost – the safety and improving the
% of programmed funds

fourth consecutive year this has environmental responsiveness


been achieved. Figure 4 illustrates of the construction industry. 30
the distribution of project Opportunities were identified
benefit/cost ratios from project to make greater use of
funding over the past four years. information technology to
More than 75 percent of our improve productivity. Our
1999/00 construction funding model specifications and test 20

has been spent on projects with methods are freely available on


benefits amounting to more than the internet and our offices
twice the cost. have direct access to Australian
Standards through the Standards
ON TIME AND WITHIN Australia online facility. 10
BUDGET
During the year, 28 major In line with Government policy,
projects with individual project new requirements for the
costs of more than $1 million management of industrial
each were completed. Total relations were introduced
0
expenditure on these projects through the Building and <=1 1 to 2 2 to 3 3 to 4 4 to 5 >5

was $517 million. Project time Construction Industry Security of


Benefit Cost Ratio
and budget performance Payment Act 1999 (NSW).
summaries are shown in the
following table:

PROJECT TIME AND BUDGET PERFORMANCE


Project delivery Number of Total % of projects
projects expenditure weighted by
$ million project
cost
Completed within budget or 22 473 91
within 10% over budget
Completed within planned 17 487 94
duration or within 10% over
planned duration

(27) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 28

MAINTAINING ROADS
AND BRIDGES

>> (28) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 29

> THE STONEWORK ON THE SYDNEY


HARBOUR BRIDGE IS CLEANED
USING AN ABSEILING TECHNIQUE

(29) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 30

MAINTAINING ROADS
AND BRIDGES

Figure 5 – Ride Quality % on State Roads (including National Highways) Maintain State Roads and The NSW road network is a
bridges to agreed economic, significant public asset which
100 technical and environmental must be continually maintained
standards. to ensure reliability, safety and to
retain its value. Our responsibilities
90 are far reaching and include
spending more than $610
80 million a year maintaining:
– 17,783km of State Roads which
70 carry 70 percent of all traffic
in NSW
– traffic facilities such as traffic
60
lights, roundabouts, signs and
linemarking
50 – 4,275 bridges and major culverts
on State, Regional and Local
Roads
40
– 2,919km of Regional and Local
Roads in the unincorporated
30 area, and
– 9 vehicular ferries.
20 We also:
– resurface about 10 percent
10 of all NSW roads annually, and
– assist local councils manage
0
18,430km of Regional Roads.
1989

1990

1991

1992

1993

1994

1995

1996

1997

1998

1999

2000

KEEPING THE NETWORK IN


GOOD ORDER
In 1999/00 roads with significant
Good Fair Poor economic importance and high
vehicle use were targeted for
improvement via the Rebuilding
Country Roads Program in line
with our objective to make road
conditions throughout the State
suit the particular use of roads
and transport routes.

(30) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 31

PAVEMENTS ROADCRACK Figure 6 – Roughness on Major Country State Roads


‘Ride quality’ (a measure of the Our multi-award winning
100
roughness of travel over road RoadCrack technology,
surfaces) is a primary indicator developed in partnership with
of road conditions and customer the CSIRO over the past five
95
needs. During 1999/00, ride years, has been an outstanding
quality on National and State success and paid dividends, both
Roads recovered after a slight in terms of road maintenance
90
fall in that year as a result of repairs and commercial success.
substantial flooding in NSW In 1999 RoadCrack won the
during 1998/99. The recovery NSW Engineering Excellence
85
reflects the $119 million Award presented by the Institution
program of disaster repairs. of Engineers Australia’s Sydney
% Good

Rating of ride quality as ‘good’ Division, the Institution’s


National AusIndustry Innovation 80
exceeded 90% for the first time.
(Figures 5, 6, 7) Award and the CSIRO Medal for
Excellence in Research.
The level of service on key 75
National Highways and State RoadCrack comprises sophisticated
funded corridors has become computer equipment installed
much more consistent over the into a 6-tonne truck with a lap top
70
past five years. computer providing information
to the operator. The vehicle,
‘Pavement durability’ is a measure
which can operate at up to
of road surface cracking. We 65
100km/h, gives instant feedback
achieved a level of 77.3% ‘good’,
on the surface condition of a
an improvement on the previous
range of road surfaces. Cracks
year. (Figure 8 ) 60
as small as 1mm in width can
1989

1990

1991

1992

1993

1994

1995

1996

1997

1998

1999

2000
BRIDGES be detected and classified as
Deficient bridges cause a negative either transverse, longitudinal
impact on freight transport. or ‘crocodile’ in pattern.
Currently nine out of 4,127 (0.2 RoadCrack has been accessed by Mitchell Princes
percent) bridges on State Roads three other States, most notably Western All National Highways
are considered deficient, see South Australia where the RTA
Figure 9. completed about 10,000km Pacific
Deficient bridges are those of their road network survey
that are: for 1999. Expressions of interest
to commercialise the technology
– washed away and closed to traffic are being assessed.
– load and/or speed limited, or
– supported by undertrussing,
bailey bridging or replaced with
emergency bridging.
The NSW Government’s $129
million Country Roads Timber
Bridge Replacement Program
which will restore or replace
where necessary 140 country
timber bridges has reduced the
number of deficient bridges on
State Roads from 16 to nine
during 1999/00, and will
continue to reduce bridge
deficiencies. Thirty six bridges
were completed by 30 June 2000.

(31) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 32

Figure 7 – Roughness % Good on National Highway Routes ROAD MAINTENANCE Existing contracts for maintenance
REFORM PACKAGE works on State Roads currently
This NSW Government package undertaken by the private
100 sector are continuing. We have
announced in November 1999
developed contract documents
represents a significant step
98 in consultation with our in-house
forward for road maintenance. It service providers and local
initiates major improvements in government. The contracts,
96 road safety, road environmental which are managed under
management, worker safety, the our Prequalification Scheme
quality of roadworks and value for Construction Industry
94 for taxpayers’ money while Contractors, require that all
supporting the long term viability providers develop adequate
92 of rural communities and re- management control systems for
investment in a rural road network safety, environmental control,
cost control and product quality.
and supports viable industries.
90
Local Government and the RTA We have conducted information
Road Services have responded sessions with local government
88 very positively to the program. to advise on how to develop and
implement management systems
The package has also established
which were adapted to suit the
86 minimum response times for
scope of the works.
repairing defects which could
affect road safety. This will limit AUDIT ON ROAD
84
road user exposure to unexpected MAINTENANCE
defects such as potholes. In December 1999 the State Audit
82
There are three key reforms. Office completed a program audit
Firstly, maintenance works would of our maintenance planning. The
80 continue to be undertaken by Office was of the opinion that
existing providers, primarily our “the RTA is taking positive steps
1989

1990

1991

1992

1993

1994

1995

1996

1997

1998

1999

2000

Road Services organisation and in planning for road maintenance


local councils, thereby securing and in many instances follows
country and regional employment. best practice. There are, however,
Hume Newell
some important improvements
Secondly, the reforms would
Sydney/Newcastle Sturt which need to be implemented
establish minimum standards for
New England Cumberland
in order to enhance the
worker safety, traffic control and
efficiency and effectiveness
safety, as well as environmental
Canberra All National Highways of road maintenance”. We
protection. Thirdly, we will
are implementing the
pursue efficiency gains via
recommendations of the report.
benchmarking using consistent
standards of work quality arising
from the introduction of a
contractual relationship.

(32) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 33

Figure 8 – Pavement Durability on Sealed Country State Roads Figure 9 – Deficient bridges on State Roads ( including National Highways)
(including National Highways)
% Pavement area

80% 20

70%

15
60%

50%

10

40%

30%
5

20%

10% 0
1993 1994 1995 1996 1997 1998 1999 2000

0% Bridges with load or speed limits Bridges closed


1991

1992

1993

1994

1995

1996

1997

1998

1999

2000

Bridges with temporary strengthening

Good Fair Poor

Since 1998, new automated technology has


been used to collect Pavement Durability data.

(33) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 34

>> > STUDENTS DEMONSTRATE THE CORRECT WEARING


OF BICYCLE HELMETS, JUST ONE COMPONENT OF
THE MOVE AHEAD WITH STREET SENSE PROGRAM

(34)
(34Roads
) Roads
and Traffic Authority
and Traffic Annual Report
Authority Annual2000
Report 2000
RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 35

THE ROAD SAFETY


CHALLENGE

(35) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 36

THE ROAD SAFETY


CHALLENGE

Figure 10 – Fatalities in NSW 1995–1999* ROAD SAFETY 2010 SOME CAUSES OF


In November 1999, the Minister ACCIDENTS
800
for Roads released Road Safety Analysis of 506 fatal crashes in
2010 – a Framework for Saving 1999 revealed:
2000 Lives by the Year 2010 in
700 – speeding was a factor in around
NSW (Road Safety 2010). This
40 percent of fatal crashes
major road safety strategy
– driver fatigue contributed to
replaces the previous Road Safety
600 about 18 percent
2000 and reflects the evolution
– illegal alcohol levels were evident
of ideas since 1990. Road Safety
in at least 17 percent, and
2010 has four prime actions –
– at least 91 people killed in motor
500 safer people, safer roads, safer
vehicles were not wearing
vehicles and community based
available seat belts.
action. It sets out the key
400 initiatives being addressed over Our core road safety strategies
the next few years and describes for 2000/01 include working
the directions for road safety with our key partners to reduce
300
over the next decade. the above factors. Figure 12
demonstrates the reductions
FACTS AND FIGURES in fatalities for each of these
In the twelve months ending contributing factors over the
200 30 June 2000, there were 587 past decade.
fatalities on NSW roads, up 5
percent (29) from the 558 deaths REDUCING THE COUNTRY
100 in the year to 30 June 1999. See ROAD TOLL
Figure 10. While fatalities have tended to
Although the 1999 road toll of decline in metropolitan areas in
0 577 fatalities was higher than for recent years, they have tended
1995 1996 1997 1998 1999
1998, it was still the third lowest to increase in country NSW.
fatality total since 1950. In 1998/99 this trend was
Fatalities Significantly reduced road crash particularly evident in the far
fatalities were recorded in a north of the State.
* Provisional data for 1999
number of key road user groups: To combat the rising toll on
– passenger fatalities were down country roads, several country
6 percent on 1998 (the third- road safety initiatives were
lowest total since 1945), and implemented:
– fatalities aged 21 to 25 and over – In November 1999, the Minister
70 were down 21 percent and for Roads launched a new
12 percent respectively. country road safety public
education campaign using
Overall, NSW’s performance television and radio advertising
in minimising road fatalities featuring the testimonials of the
compared favourably with the families of road victims. The
most recent results from other main message was that local
industrialised countries. See people were dying on country
Figure 11. However, we are roads, and that local people
committed to achieving the State could do something about the
Government’s Road Safety 2010 issue. In the commercial,
target of halving the road toll country people who had actually
by the end of 2010. lost a relative, friend or mate
in a country road crash speak
about their loss and feelings
of bereavement.

(36) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 37

SPEED MANAGEMENT
A Speed Limit Zoning Advisory
Group (comprising representatives
from the NSW Police Service,
NRMA, Local Government and
the Institute of Public Works and
Engineering Australia) continued
to oversee a review of speed
zoning, speed limits and signage
practices in NSW. The review is
due for completion in the second
half of 2000.
In order to assist with speed
enforcement, we have installed THE MATES TELEVISION CAMPAIGN
HIGHLIGHTED THE DANGERS OF
23 fixed digital speed cameras SPEEDING ON COUNTRY ROADS
throughout NSW, including in
the northbound and southbound
tunnels of the Eastern Distributor
in east Sydney. Sites for the
cameras were determined by
applying a series of criteria
– As a follow-up, a hard-hitting which included the crash and
The cost saving to the community We continued to convene the
country speeding public education speeding history of the site. in the study area from avoided tri-State National Highway 39
campaign was launched in Public education campaigns accidents over the 21 month Driver Fatigue Strategy Group
January 2000 which focussed designed to discourage speeding period has been estimated at which comprises representatives
on speeding, especially around included television commercials $6.5 million. There were large of the NSW, Victorian and
curves in 100 km/h speed zones. reductions in the proportions of Queensland Police and transport
A country seatbelt public based on the Safe Speeding.
vehicles exceeding 60, 70 and authorities as well as community
education campaign was also There's no such thing strategy: 80 km/h on the 50 km/h speed- and industry groups. Its aim is to
run in March 2000, targeting – Kid Brother, targeting young zoned streets. reduce the number and severity
rural men. drivers in metropolitan areas, and of fatigue related crashes on the
A television and radio campaign,
–The RTA joined with State – Mates, which targeted country National Highway 39 (Newell
including ethnic media, Highway) between Melbourne
Emergency Services to trial a people who speed on country promoted the new speed limit and Brisbane.
new model for reporting wet roads. and brochures were printed in
road conditions in the far north The Strategy Group also
– There were also statewide Chinese, Vietnamese, Arabic,
coast of NSW, Central Coast and promoted joint enforcement
promotions of enhanced Police Italian and Spanish. Community
Lithgow areas. The trial, between activities along National Highway
enforcement and double demerit attitude surveys showed 70
December and the end of April, 39, and played a significant role
points during key holiday periods, percent of the community were
provided up-to-date road weather in the development of the Driver
using television, radio, press and in favour of the reduced limit.
conditions to local radio stations Reviver Program by bringing
through the use of weather radar bridge banners, together with
DRIVER FATIGUE together Queensland Transport
and fax stream technology. ‘live reads’ of safe driving tips
Public education campaigns on and RTA program managers
Feedback from radio stations on radio.
driver fatigue included the More at regular meetings.
was favourable. We also ran an Older Pedestrian than 2 Hours Gets Deadly Boring
– In May 2000 the Minister for Safety public education – Every 2 Hours Stop. Revive. DRINK/DRUG DRIVING
Roads opened a community- campaign using radio, including Survive message on television, PROGRAM
based road safety forum at ethnic radio, press advertising radio, billboards and bridge The trial of the use of vehicle-
Bathurst with people from the and bus shelter posters. banners across the State during alcohol interlock devices began
region discussing a variety of peak travel periods. in July 1999 and was completed
road safety issues including INTRODUCTION OF 50KM/H in March 2000. The devices
matters affecting heavy vehicles, SPEED LIMITS We continued to support the require the driver to be breath
roadsides, speeding, youth, In June 1998, the Minister for community-based Driver Reviver tested for alcohol before their
pedestrians, cyclists, motor Roads invited each local council program. Almost 100 sites now vehicle can start. Some 23
cyclists, drink driving and in NSW to implement 50 km/h operate across the State. All sites volunteer offenders participated
fatigue. The outcomes will be speed limits on urban roads in our Western Region were and had the devices fitted to
used in developing actions for throughout their local government audited during the year and a their vehicles for 3–6 months.
future road safety initiatives. areas. The lowered limit was new rest area signage system
was trialed in Northern Region. The evaluation revealed the
Another two forums are planned implemented as a partnership
Bushells Tea, the new national devices performed adequately
for later in 2000 for Maitland between councils, local
sponsor of Driver Reviver, will throughout the trial and
and Campbelltown. communities and the RTA. The
provide product free of charge to prevented people who had
introduction of 50km/h urban
A number of support activities all sites for the next three years. been drinking from driving the
speed limits contributes to a
such as increased Police vehicle. Ninety four percent of
reduction in the number and The Federal Parliament House
enforcement and the use of volunteers involved in the trial
severity of crashes in urban of Representatives Standing
Variable Message Signs along supported a statewide interlock
areas, particularly for vulnerable Committee on Communications,
major country routes were also program. Some 88 percent
older and younger pedestrians Transport and the Arts conducted
adopted. During the first half of reported the device acted as a
and cyclists. an inquiry into managing fatigue
2000, fatalities in our Northern strong deterrent and said the
Region declined by more than By the end of June 2000, 106 in transport. We made a joint experience would permanently
35 percent on the corresponding councils across NSW (housing in submission with the NSW improve their drink-driving
period for 1999. excess of 90 percent of the NSW Department of Transport on behaviour.
population) were participating in fatigue management in the
land transport industry. Our We are currently considering the
the initiative. All councils in the
officers provided evidence at implementation of an alcohol
Sydney metropolitan area are
the hearing which was held in interlock program as an option
involved. A major evaluation
November 1999. for courts to use in sentencing
found there were 262 fewer
targeted drink-drive offenders.
crashes than otherwise expected
on streets zoned at 50 km/h in
the study area.

(37) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 38

Figure 11 – Fatalities Per 100,000 Population, International


Comparisons
30

25

20

15

10 Our ongoing drink-driving Other initiatives in 1999/2000


public education campaign included:
focussed on strengthening
– 121 workshops conducted
community understanding of
the consequences of drink- across the State to support
driving, increasing awareness of teachers from 2,200 primary
5 police random breath testing schools in the delivery of road
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999

and the promotion of strategies safety education and the use of


for avoiding or preventing the newly released Move Ahead
drink-driving. with Street Sense resource. This
Statewide advertising targeted package, developed through
NSW Great Britain the NSW Board of Studies,
drivers likely to risk low range
USA Japan drink-driving and emphasised includes age-appropriate
the criminality of drink-driving, material on road safety messages
Australia using a variety of formats and
particularly through a new
television commercial Courtroom also provides opportunities for
Figure 12 – Fatalities, Contributing Factors which was also supported by discussion, problem solving,
billboard advertising. interviewing, role playing and
350 family involvement
Regional campaigns promoted – creation of new resources for
alternative transport arrangements early childhood road safety
such as the Wollongong area’s education including the Tertiary
300 ‘Summer Bus’, a joint initiative Resource Folder for child carers
with local licensed hotels, in training, and three editions
restaurants and local bus of the Kids and Traffic Gazette,
companies, which provided bus which provides road safety
250 services on Friday and Saturday
-24% information for parents and carers
evenings during summer when – support for high school teachers
normal services did not operate. in implementing road safety
Number of Fatalities

200 aspects of the new Year 11 and


TRAFFIC OFFENDERS
12 courses, and
PROGRAM
– initiation of a review of the
Following the evaluation of this
road safety education resources
program in 1999, a steering
150 for high schools to ensure the
committee was formed to oversee
program addresses all issues
the development of guidelines
for young pedestrians, cyclists,
and standards to ensure
passengers and drivers.
100 -43% consistency of program design,
-54%
-27% content and data collection. SAFER ROUTES TO
The steering committee report SCHOOL PROGRAM
outlined options for future This program, which focusses
50 development of the program on primary schools, entered its
and will be presented to the third year in 1999/2000. It
Government Agencies Road involves parents, schools, P&C
Safety Council for cross-agency Committees, local councils and
0 Seatbelt consideration.
Speed Fatigue Alcohol Police working together to
Non Useage
design action plans to make
SCHOOL ROAD SAFETY
1988–1990 Average 1999* Provisional data
children’s travel to and from
EDUCATION PROGRAM school safer.
This program aims to influence
the development of road use Some 1,162 schools were
knowledge, attitudes and registered in the program by
behaviour in children and the end of June 2000, with
adolescents. The 1999 evaluation 958 completing stage I which
showed an increase in road qualified them to be self-
safety education in schools, sustaining in the program.
with 85 percent of respondents
delivering road safety education
in the previous 12 months.

(38) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:56 AM Page 39

YOUTH ROAD SAFETY ROAD SAFETY INITIATIVES


PROGRAMS FOR ABORIGINAL PEOPLE
Activities for these programs, A major research project into the
which target young people road safety profile of Aboriginal
aged between 17 and 25 and Torres Strait Island
years, included: communities was completed in
Consultation with young September 1999. The 8-volume
people report includes a demographic
– nineteen focus groups were held and socio-economic profile of
across NSW with young men indigenous NSW communities,
aged between 17–19 years and an overview of Aboriginal and
20–22 years on issues related to non-Aboriginal road trauma in
speeding, risk taking and unsafe NSW, an investigation into
driving. This work was undertaken hospitalisation data, and a study
by the RTA, in partnership with of accident and emergency
NSW Health and the Motor department injury statistics in
Accidents Authority (MAA). The the Far West, Bourke and Barwon
findings of these focus groups areas. The report also looked
make valuable contributions to at the most effective way we
the development of our programs can communicate road safety
and initiatives messages to indigenous
Consultation with key communities and the awareness
stakeholders and receptivity of communities the road network ranging from Surveys of seat belt wearing
– the NSW Youth Road Safety to current road safety public traffic signal improvements to rates showed a slight increase in
Steering Group which has education messages and strategies. intersection reconstruction and the already high rates of usage.
members representing key youth safety barrier installation. These Overall, wearing rates were
We are participating in the improvements targeted known measured as 96 percent (up
and road safety stakeholders
development of the National high risk locations and also from 95 percent in the last
(MAA, NRMA, Office of Children
Aboriginal and Torres Strait allowed us to respond to local survey in 1996). For drivers
and Young People, NSW Health, the rate exceeded 97 percent.
Islander Road Safety Strategy, concerns about road safety.
NSW Police Service and peak
along with Queensland, the Testing for the Child Restraint
youth organisations) continued The accelerated $3.2 million
Northern Territory, South Evaluation Program was
to meet throughout 1999/2000. bridge screening program,
Australia and Western Australia. completed with 177 tests
This expert group advises on announced in 1998, was
A draft National Indigenous carried out to determine the
program development for completed. Over 70 bridges in
People’s Road Safety Strategy relative safety performance of
youth programs NSW have now been screened
was circulated for comment to currently available child
– NSW discussion paper on youth to prevent objects being thrown
our Aboriginal Liaison Officers. restraints. These results were
road safety – this highlights the from them. Work is continuing
achievements of the RTA in road Nominations for representation to screen further bridges as collated into a comprehensive
safety for young people, reviews on the NSW Aboriginal and part of an ongoing program to guide for prospective child
current road crash involvement Torres Strait Islander Road Safety identify and treat the locations restraint purchasers, which
by young people and the factors Strategy Reference Group were of greatest potential risk. is now available as a free
influencing this behaviour, and called for from RTA regions in publication and on our website.
– Youth activity guidelines – these June 2000. The reference group SAFER VEHICLES Our support for the Authorised
were developed in consultation will assist us develop the NSW A brochure detailing results of the Restraint Fitting Station network
with local council road safety Aboriginal and Torres Strait Australian New Car Assessment continued. These independent
officers, MAA, Institute of Public Islander Road Safety Strategy Program, was released in businesses are supported by the
Works Engineering Australia throughout the following year. November 1999 showing the RTA to ensure that consumers
(IPWEA) and RTA staff with the range of safety performance have ready access to services to
We mounted a road safety
aim of adopting a consistent of each car tested and the provide safe seat belt and child
display at the NSW Aboriginal
approach to youth road safety continuing improvements in restraint installations. Nine new
Rugby League Association
programs and projects. performance since the program stations were authorised during
Knockout Competition in
began in 1993. Work continued the year and, at 30 June 2000,
ROAD SAFETY CAMPAIGNS Dubbo in October 1999. The
to develop more comprehensive 138 organisations were operating
competition attracted over 61
FOR YOUNG PEOPLE tests and to forge stronger links from more than 145 locations.
Aboriginal football teams and
Public education campaigns with overseas programs to lead
2,000 players over the weekend.
focussing on children and to the sharing of information SAFE-T-CAM
youth included: We are consulting with the and joint development of Safe-T-Cam comprises 21 digital
Aboriginal community on the new procedures. camera sites on major interstate
– television and radio public
development of our parent transport routes throughout
education campaigns about A large study into defects in
workshops to ensure the NSW. The system records and
the 40km/h speed limit around crashed vehicles was completed
program supporting the new processes data on the travel
school buses and the supervision resulting in the establishment
Graduated Licensing Scheme patterns of heavy vehicles,
of children travelling to and of a large database of
is appropriate to their needs. providing us with information to
from school (eg Right side of information to assist researchers
the Road), and in understanding the role of monitor both drivers and owners
MAKING ROADS SAFER in the road transport industry
– a television commercial based We progressed the NSW defects and other vehicle
on the theme Safe Speeding. characteristics in vehicle crashes. to ensure they operate in a safe
Government’s commitment to
There’s No Such Thing aimed The study examined 4,426 and legal manner. Safe-T-Cam
improve road safety by carrying
at younger drivers. vehicles involved in 2,705 contributes to a reduction in
out improvements to targeted
crashes across the State. speeding and driver fatigue
Most public education campaigns roads and roadsides. Some $15
accidents involving heavy
included material and media million was spent in 1999/2000,
OCCUPANT RESTRAINTS vehicles. Over 6,000 warning
coverage for young people. with $10.3 million of this being
Public education programs were letters were sent to vehicle
in country regions. These works
conducted targeting seat belt operators and just over 1,000
complemented the $12.1 million
use by rural males including a breaches were subsequently
Federal ‘blackspot’ expenditure
widespread seat belt advertising issued to operators who did
administered by the RTA.
campaign on radio and not comply during the year.
These funds allowed a number of television in country NSW in
improvements to be made across February 2000.

(39) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:57 AM Page 40

WORKING WITH
OUR CUSTOMERS

(40) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:57 AM Page 41

>>
> THE NEWCASTLE CALL CENTRE
OPENED IN MAY 2000

(41) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:57 AM Page 42

WORKING WITH
OUR CUSTOMERS

Over four million people are In addition, five other business E-COMMERCE
licensed to drive in NSW. We units were relocated to the new Our internet service which
strive to ensure that driver and premises: DRIVES Help Desk, enables customers to check the
vehicle services are accessible Registry Services (North), Vehicle availability of registration number
and delivered in an efficient, Regulation (North), Information plates was expanded in December
professional and friendly manner. Management & Information
1999 to allow customers to
Technology (Newcastle) and
Fleet Services (North). place orders and make payment
MOTOR REGISTRIES by credit card over the internet.
We have a network of 130 The new call centre will employ Around 1,900 enquiries were
Motor Registry outlets, 38 some 128 people, representing received each day and 2,800 on-
agencies and three Government a major boost for the line orders placed during the year.
access centres across NSW. A Hunter region and the NSW
total of 68 Motor Registries offer Government’s commitment to We began a trial to allow motor
Saturday trading, and nine of decentralise and create more dealers to register new vehicles
these are open until 2.00pm. jobs in rural and regional NSW. on the internet in November
One hundred of the new 1999. This service allows
In May 2000 we conducted an dealers to print the certificate
independent survey throughout positions include two-year
traineeships carrying a Certificate of registration, issue the label
NSW to measure customer and finalise the transaction at
satisfaction with registries. A III in Communications (Call
Centre) qualification and have the dealership. It is planned to
total of 6,447 interviews were extend the service to additional
carried out at 128 registry attracted Federal and State
Government funding which new vehicle motor dealers in
outlets. The results were pleasing 2000/2001.
with 91 percent of customers includes salary subsidies,
surveyed rating the overall traineeship salary rates, fully A trial began in December 1999
service as ‘good’ or ‘very good’. funded training and access to to allow customers to renew
specialist training. light trailer registrations via the
NEWCASTLE CALL CENTRE Our Interactive Voice Response internet and the Interactive
In May 2000, the Parramatta (IVR) system was expanded to Voice Response (IVR) telephone
Call Centre, Newcastle Call offer customers the opportunity system. This trial has been
Centre and a number of smaller to choose basic information via expanded to include eligible
call centres were consolidated recorded voice messages or to business-registered vehicles less
into a single centre at Newcastle speak with staff for more than three years old. A total of
to realise business efficiencies, involved enquiries. Operating 3,670 vehicles were registered
improve customer service and hours of the new centre were using this process.
contribute to the development extended to 8.30am–5pm
of Newcastle. Monday to Friday and
9am–2pm Saturdays.

(42) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:57 AM Page 43

GOVERNMENT ACCESS
CENTRES
The Government Access Program
MOTOR REGISTRIES OFFER A RANGE OF
is a NSW Government initiative SERVICES TO THE COMMUNITY OF NSW
to provide better service for
people in remote rural areas.
It involves providing a single
access point for a range of
Government services and
eliminates the need for local
residents to make lengthy
return journeys to other SYDNEY 2000 OLYMPIC Major areas identified as a OMBUDSMAN’S ‘MYSTERY
regional centres. NUMBER PLATES priority for the RTA were: SHOPPERS’
We developed two styles of – ensuring drivers remain Mystery shoppers from the
A development strategy, drawn Sydney 2000 Olympic Games Ombudsman’s Office visited a
competent throughout their
up in consultation with the NSW number plates with the Sydney sample of our Motor Registries
driving life
Premier’s Department is being Organising Committee for the between December 1999 and
– minimising air pollution from
produced to progress the Olympic Games (SOCOG). January 2000 as part of a random
vehicle emissions
Government Access Program During 1999/2000, over 32,500 sampling of customer service in
– educating people about traffic
with the RTA taking a broader sets of the standard Olympic the public sector following the
control systems (eg roundabouts
management role. plates with the Share the Spirit Government’s Guarantee of
and electronic signage)
The centre at Dorrigo successfully slogan and about 4,500 sets of – timing and coordination of traffic Service initiative of the early
trialed a DRIVES internet facility the premium Olympic plates lights 1990s. They sampled 115
and an enhanced version were sold. – reducing accident prone areas separate customer interactions
of the internet system is being – building and maintenance of (34 telephone calls, 22 letters,
developed for release at other LISTENING TO OUR 37 face-to-face meetings and 22
country freeways/major roads,
centres during 2000. CUSTOMERS and email requests). The ‘shoppers’
We encourage feedback, – regulating trucks and buses. represented a mix of gender,
FLEXIBLE SERVICE which we monitor and use ages and ethnic origin to reflect
To increase customer convenience with our own customer research Some major findings indicate the variety of customers we
and improve accessibility, to continually improve all communication between the deal with.
Fairfield Heights Motor Registry RTA services. Our Community RTA and the community has
was relocated to Greenway Plaza Attitudes Survey was conducted improved with the RTA seen to The report found our level of
shopping complex at Wetherill during late November to be communicating better. Road service was of ‘good professional
Park and Kogarah Registry was mid-January 2000 to gauge users showed a general rise in standard’ with 97 percent of
relocated to Rockdale Plaza community attitudes to our satisfaction with their needs customer enquiries handled on
shopping complex at Rockdale. activities and obtain feedback. being met. Bus users’ satisfaction first contact. The report suggested
The two new registries provide This was the fourth major is much improved. Satisfaction reducing standard response times
improved facilities for customers survey, the others having been of cyclists also improved slightly to written enquiries and emails
and staff with the upgrading of conducted in 1994, 1996 and compared to previous surveys. as a measure to further improve
the DRIVES equipment and 1998. Some 1,400 households Our performance on minimising customer service.
counter layout, installation were surveyed throughout NSW. noise from major roads and
of the Q-matic queuing system, Interviews were held on a 35 landscaping was well regarded
provision of improved facilities minute face-to-face basis with by the community.
for driver testing and more people 16 years and over in To ensure the community’s
convenient customer parking. their own homes. needs are met, the survey findings
form an important input into
CENTRALISED BOOKING
the development of our strategic
SYSTEM
direction, as well as business plans
We currently have a Centralised
and performance measurement
Driver Test Booking System to
throughout the RTA.
enable customers to book driving
tests by phone or at a Motor
Registry. Research is being
undertaken to expand the
booking system to other tests
and develop an internet interface
to allow customers to make
their own bookings.

(43) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:57 AM Page 44

>> DRIVERS AND


VEHICLES

(44) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:57 AM Page 45

> HEAVY VEHICLE INSPECTION FACILITIES


PLAY A KEY ROLE IN MONITORING
VEHICLE STANDARDS AND COMPLIANCE

(45) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:57 AM Page 46

DRIVERS AND
VEHICLES

THE GRADUATED LICENSING


SCHEME PROVIDES NEW
RESOURCES AND SYSTEMS FOR
EDUCATING NOVICE DRIVERS.

DRIVER AND RIDER New drivers will be required to


COMPETENCE pass through three licensing
Our management of a safe and stages, Learner, Provisional P1
equitable transport system in and Provisional P2, over a
minimum of three and a half
NSW includes ensuring all road
years before obtaining an
users are capable and competent. unrestricted driver licence.
The licensing of novice drivers
and riders is a vital part of this Drivers will be phased-in to
responsibility. on-road driving allowing them
to get initial experience under
Accident statistics consistently conditions that involve lower
demonstrate that young, risk. A learner’s experience
inexperienced drivers, particularly must be recorded in a log book
young men, are at greater risk and signed off by the learner’s
of death or injury on our roads. supervisor. Drivers are required
While 17 to 25-year old drivers to pass four tests:
hold 16 percent of licences, they
account for some 26 percent – the computer-based Driver
of all drivers involved in fatal Knowledge test, before
or injury crashes. obtaining a Learner licence
– the Driving Ability Road Test
Changes to driver licensing which must be passed before
To address this problem, we graduating to a Provisional P1
have developed a comprehensive licence
revamp of the licensing of new – the Hazard Perception Test
drivers in NSW which involves which must be passed before
a phased progression through graduating to Provisional P2
various licence stages and licence, and
the use of the latest technology – the Driver Qualification Test
to assess the new driver’s which must be passed before
competence. graduating to an unrestricted
The new system, developed for licence.
introduction on 1 July 2000, and Under the new scheme, a driver
known as the new Graduated who holds a Provisional P1
Licensing Scheme, is the most licence will have the licence
significant change to the licensing suspended if he/she reaches a
system since the introduction of total of four or more demerit
provisional licences in 1966. points. A driver who holds a
Provisional P2 licence will have
the licence suspended if a total
of seven or more demerit points
is reached.

(46) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:57 AM Page 47

AUSTRALIAN ROAD RULES We are developing a new set of


Australia-wide road rules were procedures so that replacement
developed by the National Road licence applications will be subject
Transport Commission following to further checks before issue, to
comprehensive discussions enhance measures against
fraudulent licences. In some
and negotiations between all
cases, photo licences will be sent
Australian States and Territories. by mail to enable checks to be
From 1 December 1999, completed with the applicant
individual jurisdictions began being given an interim receipt to
implementing the changes to allow continued driving.
their road rules to make them
The Road Transport (Driver
more consistent throughout
Licensing) Act 1999 was
Australia. A more uniform set of
amended in February 2000
road rules for all States and
to allow for storage of images
Territories will improve road safety
used to produce photo licence
and contribute to National Road
identifications on our computer
Transport Reform objectives.
system. This will significantly
In NSW, most road rules did enhance the integrity of the
not change as they were licensing system by reducing
already consistent with the the possibility of fraudulent
new Australian Road Rules. The transactions.
changes that did occur were
Hazard perception testing explained to the community ABORIGINAL AND TORRES
Road safety research has through an extensive public STRAIT ISLANDERS
consistently shown that novice education campaign that included We continued programs and
drivers find it difficult to identify television, print, radio and actions in accordance with the
and react appropriately to outdoor advertising. The New recommendations of the 1991
hazardous situations which Road Rules for NSW brochure was Royal Commission into Aboriginal
may arise while they are driving. also delivered to each household Deaths in Custody including:
Development of a hazard in NSW and a Changes to Road Motor vehicle offences
perception test was completed Rules in NSW Guide made (Recommendation No. 95)
during the year. It will be used available through our registries Community Based Knowledge
in the new licensing scheme to and website. Testing Program (CBKT)
assess an applicant’s ability to The campaign included television, This program, which helps
recognise and react to hazardous print and radio advertising and prepare people for the driver
situations. It is expected that the brochures in ten community knowledge test, is available at
test will play a significant role in languages: Arabic, Chinese, centres such as Broken Hill,
ensuring new drivers have the Croatian, Greek, Japanese, Korean, Forbes and Moree. Aboriginal
skills necessary to drive safely. Serbian, Spanish, Turkish, and people have been accredited to
Driver knowledge test Vietnamese. translate the test to participants
In order to improve drivers’ at community agencies and
knowledge of the road rules NEW CONTROLS other locations where community
and better prepare applicants to We completed a trial of birth members feel comfortable
become safer drivers, the test’s certificate validation with the attending and practising the test.
question bank was expanded NSW Registry of Births, Deaths
Following the successful
and published, together with and Marriages which we are
operation of the scheme at the
a demonstration version of the planning to implement statewide.
Mannus Correctional Centre, near
test, on our website. It involved on-line computer
Tumbarumba, and agreement
checks by motor registry staff to
Our Driver Knowledge Test with the Department of Corrective
ensure the particulars on birth
and Road User Handbook for Services, the program has been
certificates tendered as proof-of-
obtaining a driver’s learning adopted at other correctional
identity were valid. We are
licence is available in Arabic, centres including Broken Hill,
also seeking the cooperation of
Chinese, Croatian, Greek, Bathurst, Oberon, Ivanhoe and
Federal agencies for validation
Korean, Serbian, Spanish, Turkish Kirkconnell. It has also been
arrangements for Australian
and Vietnamese. taken up by the Aboriginal
passports, citizenship,
Services Office in Nowra.
naturalisation or immigration
papers.

(47) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:57 AM Page 48

VEHICLE STANDARDS Petrol vehicles


Compared to 20 or 30 years
Motorists took advantage of the
ago, today’s vehicles give far
free, voluntary emission tests
more protection to drivers and
available at our emission testing
passengers. Better structural
facilities at Botany and Penrith.
design, improved seats, more
Members of the public are able
advanced seatbelts and airbags
to have a no-obligation check of
have all contributed to a
their car's exhaust performance
dramatic reduction in serious
by means of sophisticated
or fatal injuries. Drivers, too,
testing equipment which checks
are increasingly aware of the
levels of hydrocarbons, oxides of
importance of safety in motor
nitrogen and carbon monoxide,
vehicles and demand higher
all of which are major contributors
safety standards and performance.
to Sydney's photochemical smog.
We continued to actively
In addition, the test provides
improve vehicle safety for
information on fuel consumption.
drivers, occupants and other
road users. Diesel testing
Roadworthy vehicles One of the biggest air quality
problems in Sydney is caused by
In a follow-up to our 1998 Heavy
particulate matter. Diesel vehicles
Vehicle and Public Passenger
are the biggest contributors to
Vehicle Road-worthiness Survey,
particulates despite comprising
B-Doubles, road trains and
a small sector of NSW vehicles.
coaches were randomly inspected
We have been working with the
for defects in late 1999. Major
Environment Protection Authority
defect rates of 4 percent or less
(EPA) and Environment Australia
were reported for all three groups
to develop a suitable test for
which was less than the overall
measuring pollution levels of
rate of 7 percent for all vehicle
diesel vehicles. During the year,
categories in the 1998 survey.
a method was identified with a
Uniform vehicle standards view to adopting it as a national
test standard. This ground
NSW implemented Combined breaking project is a world first
Vehicle Standards during in the provision of a short,
December 1999 which provided accurate test for diesel vehicles.
uniform construction and
Testing of a sample of 600
equipment standards for all
vehicles will be completed
vehicles. This will result in a
before the end of 2000 to
number of benefits, including
determine the condition of the
increased consistency in vehicle
diesel vehicle fleet and to identify
dimensions, common basic vehicle
the benefits obtainable from a
safety standards and uniform
testing program.
smoke and noise standards.

Unregistered vehicle survey


A survey of about 5,000
stationary vehicles revealed 1.9
percent were unregistered, the
same rate as revealed in the
1998 road survey. Comparison
with other jurisdictions which
conduct similar surveys reveals
that this rate is lower than that
found in Victoria, Queensland
and Tasmania.

(48) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:57 AM Page 49

Alternative fuels Checking on heavy vehicles National stolen vehicle


initiatives
One way of reducing pollution RTA Inspectors were engaged in
is by the use of fuels other than a number of major operations The RTA led a National Stolen
petrol and diesel. We have been last year targeting heavy vehicles. Vehicle initiative by providing
examining practical ways to A key operation was AUSTRANS input to the National Motor
increase the number of cleaner which is a major joint operation Vehicle Theft Reduction Council
vehicles registered in NSW. with road authority enforcement (NMVTRC) for the management
Federal subsidies are currently agencies throughout Australia. of written-off vehicles.
available for vehicles fuelled by National data was collected for The package is being used to
compressed natural gas and we a week in February 2000. develop national best practice
are currently identifying which principles for written-off vehicle
Our Inspectors focussed their
particular vehicle applications registers in all states and
efforts on the main transport
are most suited to conversion. territories, and most jurisdictions
routes and intercepted over
The implementation of the 9000 vehicles. Some 629 vehicle now plan to implement NSW
conversion program is defects were issued of which written-off vehicle business rules.
scheduled to coincide with the 15.4 percent were for major It is expected that the adoption
announcement of an expanded defects. In addition, 882 of nationally consistent practices
network of natural gas refuelling driving/operating offences in all jurisdictions will significantly
stations at the end of 2000. were detected. Of these 49 reduce the incidence of motor
percent were for exceeding vehicle theft and rebirthing.
We support the Liverpool
regulated driving hours.
Council’s program of converting Identifying high risk or
their fleet to natural gas and Faded number plates
Plain English information suspect vehicles
the Western Sydney Natural Gas A faded plate program was
Vehicle Taskforce’s assistance We introduced a series of plain We set up Vehicle Identification implemented in northern NSW
in expanding the conversion English information sheets for Inspection Units (VIIU), a new in November 1998 and extended
program to other councils in heavy vehicle operations to third tier inspection process, for to Sydney in November 1999.
western Sydney. provide clear, concise information high risk or suspect vehicles in Since the introduction of the
to the transport industry October 1999 to help reduce program, almost 19,000
Third heavy vehicle on restricted access vehicle the registration of stolen and deteriorated number plates have
reform package operations such as controlled rebirthed vehicles. Since the unit been replaced, free of charge to
access buses, 14.6m semi-trailers began operating, some 17,503 motorists. It is planned to extend
We have been working with road
and 14.9m refrigerated semi- vehicles have been inspected the program across NSW in the
agencies from other jurisdictions
trailers. The information was also with 400 referred to the Police second half of 2000.
and the National Road Transport
made available on our website. for further investigation. This
Commission to develop this
represents a substantial Strong ties with industry
reform package which draws
Heavy vehicle checking reduction in the number of
together initiatives with the Regular meetings with transport
station unnecessary inspection referrals
potential to deliver considerable industry groups and primary
to the Police compared to the
benefits in productivity, safety, We are currently constructing a producers greatly improved
previous procedure involving
environmental impacts and/or new high volume heavy vehicle relationships between the RTA
Authorised Inspection Stations.
efficiency for freight and checking facility at Twelve Mile and industry. We participated in
passenger tasks. Key areas Creek, north of Newcastle on the Inspections were carried out by the agricultural equipment
include Driver Health and Pacific Highway which will RTA officers beginning in the exhibition (Agquip) held in
Fatigue Management, Load provide vehicle checking facilities greater urban areas of Sydney, Gunnedah and with Grain Corp
Restraint for heavy vehicles and at a strategic location between Newcastle and Wollongong. at pre-harvest meetings in
light commercial vehicles and Sydney and the Queensland By the end of June 2000, there country locations where our
Heavy Vehicle Noise and Diesel border. The site has been were eight inspection sites staff made presentations on issues
Emissions. The package was designed to take advantage of located at Unanderra, Penrith, such as registration, licensing and
endorsed by Australian Transport the latest technology including Liverpool, Five Dock, Botany, enforcement. We are working
Ministers at the Australian automatic truck scanning and West Gosford, Carrington and to establish similar forums with
Transport Council in May 2000. Safe-T-Cam monitoring. Singleton. Over the next year we other primary industry groups.
will be extending VIIUs to other
New vehicle configurations Routes for high vehicles regional locations through the
use of mobile inspection crews.
We began trials of B-Triple freight We approved route assessment
vehicles on selected road train criteria for selecting roadways Faster communication
routes in the north west of NSW. and passageways suitable for
B-Triples are an alternative to use by 4.6m high vehicles. The We are trialing a mobile
double-trailer road trains, with criteria cover livestock crates, communications system in
improved productivity and multi-deck car carriers and northern NSW which will provide
vehicle stability. vehicles carrying baled wool, heavy vehicle inspectors with a
hay and other primary products. wide range of up-to-date
information to assist in carrying
out their duties. It comprises a
computer and modem carried
in the vehicle which allows
Inspectors to validate driver
licences and logbooks by gaining
immediate access to driver,
vehicle and Safe-T-Cam records.
The information available will be
expanded as the system is
developed over time. If the
trial is successful the mobile
communications will be extended
across the State.

(49) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:57 AM Page 50

BUSINESS EFFICIENCY

>> (50) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:58 AM Page 51

> A ROAD CREW APPLYING


PAVEMENT MARKINGS

(51) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:58 AM Page 52

CLIENT SERVICES
BUSINESS DIRECTORATE
The primary responsibility of
Client Services Directorate is to

EFFICIENCY deliver value for money when


purchasing services on behalf
of clients. Core programs
of road development, road
maintenance, road safety and
traffic management amounting
to $1.62 billion were delivered.

Asset Management
A system of Single Invitation
Maintenance Contracts (SIMC)
was implemented for asset
maintenance to provide more
efficient and effective project
management and project
surveillance in the purchase
of maintenance.
There is an ongoing need for Implementation of the change Quality procedures were
government agencies and management program has been developed and implemented
statutory authorities to review undertaken through the use of for management of the SIMC,
the efficiency and effectiveness consultative work groups and to facilitate consistency of
of their operations. Through its project teams comprising staff, approach and provide a basis
union representatives and key for ongoing improvement of
change management processes
stakeholders.
the RTA has implemented the management of maintenance
structures and functions that A key feature was a commitment contracts. The quality system is
aim to deliver better services to to transfer over 229 permanent on the RTA intranet to make it
customers and internal clients. jobs from Sydney to rural and readily accessible to staff.
regional NSW (Newcastle,
MANAGING CHANGE Grafton, Dubbo, and Glen Innes) Project Management
The second stage of our change as part of the NSW Government’s
management program, which The Project Management Office
Rural Employment Strategy.
began in May 1999, further was established as a ‘Centre
Thirteen positions servicing a of Excellence’ to implement
focussed on delivering better
Heavy Vehicle Regulation best practices and drive
value for taxpayer dollars.
Prosecution Unit, and auditing consistency in project and
The first stage of the program, activities associated with contract management across
completed last year, resulted in Authorised Inspection Stations, the State. Quality certification
the redirection of more than $38 previously based in Sydney were to ISO 9000 standards was
million from efficiency savings moved to Glen Innes in April secured for the integrated
back into the Roads Program. 2000. Our Sydney and country project management system.
This stage looked at eliminating customer call centres were
duplication and overlap of A project to benchmark the
consolidated into a single base
functions performed in various project management function
at Newcastle in May 2000
parts of our operations and against other Australian state
resulting in 128 positions being
introduced more commercialised road authorities was completed.
relocated to Newcastle.
business operating procedures. The findings determined that
A further 46 positions forming project and construction
The second stage is expected to our Driver and Vehicle management costs were
take two years to complete, and Administration Section are being competitive. Best practices that
has involved the restructure of relocated to Grafton in September were identified are now being
some Corporate Directorates and 2000, and up to 42 positions implemented across the project
the establishment of statewide (full-time and part time) will be management function.
Operations and Client Services established in Dubbo in
Directorates. These Directorates November 2000 to process Business Development
were restructured as a funder/ Cashback scheme payments.
purchaser/provider model A number of initiatives were
In all of these locations, a large
which creates clearer roles successfully implemented in
number of the positions have
and accountabilities. Funder support of the RTA's
already been filled by local
Directorates establish standards, commercialisation model,
workers, or are expected to be.
policy and determine funding including the following:
Other initiatives which progressed
priorities. Client Services – A commercial budgeting model
through the change management
Directorate purchases services on was developed and implemented
program during 2000/01
behalf of the funders to ensure to ensure consistency across the
were proposals to design and
best value for money outcomes. State. The model promoted the
implement a skills based wages
Operations Directorate delivers principles of fee for service based
classification structure, completion
road services, driver and vehicle on standardised charge out rates
of trials of team based working
services, technical services, fleet across the Directorate.
arrangements in road services,
services and environmental
and the introduction of
technology services on a
process improvement initiatives
commercial basis.
to enhance management
operating systems in our
administrative centres.

(52) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:58 AM Page 53

– The timesheet system has been OPERATIONS DIRECTORATE Vehicle Regulation


enhanced and an improved Our Operations Directorate
database linked version is being Vehicle Regulation Inspectors
was created in July 1999 to
trialed across the Directorate. maintained an extended presence
help achieve our objectives of
This will link to the financial at Quarry Hill on the Pacific
delivering road, bridge, traffic,
system and thereby allow projects Highway in the Burringbar Range
driver and vehicle services as
to be charged accurately and during the year following an
consistently across the State. cost effectively as possible for
increase in heavy vehicle crashes
– An improved overtime reporting the benefit of the people of
in this area in the early part of
system has been developed to NSW. It operates on commercial
1999. The 24-hour, 7 day a
assist managers to monitor and principles and increasingly has to
week strategy supplemented
control overtime expenses more compete for work from clients
other engineering modifications
effectively. both within and outside the RTA.
to the road asset providing a
With some 4,300 staff, Operations
– An RTA-wide video conferencing safer journey for heavy vehicle
employs around two thirds of
system was successfully established drivers and road users in general, CONSULTATION WITH STAFF
our entire workforce and
linking Centennial Plaza, pending completion of the new CONTRIBUTES TO THE CHANGE
encompasses an extensive MANAGEMENT PROCESS
Blacktown, the Transport Yelgun to Chinderah section of
base of skills and experience.
Management Centre and all the Pacific Highway.
regional offices. Significant In 1999/2000, Operations
savings in travel time and other successfully delivered works and Technical Services
costs, estimated at $0.5 million services to the value of $774
Crashlab, an independent test
per annum, are being realised. million and made a surplus of
facility operating as a commercial
$59 million.
business unit within the RTA,
Road Pavements was accredited by the UK based
Road Services
The Pavement Projects Branch Vehicle Certification Authority
has been established as a Road Services income for the to conduct motor vehicle
specialised consultancy providing financial year totalled $481 frontal and side impact tests in
advice and technology transfer million and resulted in a surplus accordance with the European
across the RTA in all aspects of $36 million. Union directives.
of pavements including Projects, totalling over $39 Provision of technical services for
materials, design, construction, million were won in open the Western Sydney Transitway
maintenance and life cycle competition, including diverse project provided a significant
costing of pavement options. projects such as the new Oak new market. Strategic plans for
Flats Interchange, New England the survey and project design
Pacific Highway Office Highway reconstruction at functions of the branch were
A Pacific Highway roadwork Pamger Drive and the design, also developed to reinforce
information service which manufacture and installation of commitment to an RTA-wide
enables road users and members 30 Variable Message Signs on approach.
of the community to obtain major arterial routes in Sydney.
accurate, timely and relevant $16 million of the income Business Development
information regarding possible earned was from external clients.
Ongoing coordination across all
traffic delays, due to roadworks To meet the performance delivery branches was achieved
or unplanned incidents, was requirements for preferred during the year by developing
established as an integral supplier status and the client relationships and building
element of the Pacific Highway introduction of single invitation future business opportunities.
Delay Management Strategy. contracts for maintenance of
The 1800 number is now A single Directorate-wide quality
State Roads, Road Services
transferred to the Transport system was implemented and
established its business credentials
Management centre outside of prequalification under RTA
for example prequalification and
normal working hours to categories R20 and M for works
benchmarking and made major
improve the current information within NSW was achieved.
improvements to its business
service, reduce the need for a Prequalification for roadworks
systems and business rules.
recorded message, and more in the ACT was also gained in
effectively utilise staff resources. Driver and Vehicle Services mid-2000.

Improvements in customer Commercial Services


service levels in Motor
Commercial performance
Registries, the opening of a
reporting formats were developed
new consolidated Customer
and corporate contribution
Call Centre and the relocation
targets for the year set. Business
of the DRIVES computer Help
rules, including bid policies and
Desk to Newcastle were
procedures and the commercial
highlights of the year.
procurement policy and
procedures were developed,
and more than 20 commercial
projects, including functional/
product reviews and systems
improvements, were completed.

(53) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:58 AM Page 54

BUSINESS SERVICES
GROUP
The Business Services Group (BSG)
was established in our Corporate
Services Directorate in November
1999 to better align the RTA
with NSW Government policy.
It provides business support
services to RTA Directorates using
a shared services model enabling
elimination of unnecessary
processes and providing
economies from amalgamation
and standardisation of services.
The BSG has approximately
400 staff who provide products
and services that can be broadly
classified under the following
areas:

Employment and Workforce


Services
FINANCIAL MANAGEMENT Interest rate risk
Delivers support services in The RTA constantly implements Interest rates on the RTA’s debt
accordance with our human improvements to its risk are a mixture of fixed and
resources policies and standards management and financial floating rates. The RTA initially
to meet legislative requirements information reporting processes managed this exposure by
to facilitate management buying and selling semi-
Logistic and Facility Services decisions and enhance business government bonds in the
Delivers security, record keeping, efficiency across the organisation. physical market with TCorp
fleet management, mail systems, handling all transactions.
procurement and disposal, Risk management In January 2000, the RTA agreed
inventory management, building Large organisations as diverse as that TCorp should manage the
management services and the ours have many inherent risks RTA Debt Portfolio.
RTA Library that may directly or indirectly In March 1999, the Treasurer
result in loss: approved our use of TCorp’s
Financial and Administrative
Services Operating risks Come and Go Facility which will
Our investment in the be in place until 31 December
Provides financial performance improvement of Occupational 2001. It allows us to use our
reporting, revenue and banking, Health and Safety (OHS) investment funds to repay debt
and financial administration management resulted in a rebate in the short term and benefit
support, and of $6.33 million on the deposit from the gains on the margin
premium of $14.95 million paid between investments and
Continuous Improvement to the Treasury Managed Fund borrowing rates.
Services for the 1996/97 premium year. Following agreements with State
Provides quality management, The focus on improving OHS Treasury, as part of the 1999/00
continuous improvement, performance also translated State budget allocation process,
process improvement and into financial savings for the savings generated from further
benchmarking services. 1999/2000 financial year as the efficiencies in the RTA will be
In July 2000 the BSG began workers compensation deposit used to reduce debt.
formal operation across NSW as premium payment of $12.15 Superannuation liability
a business, delivering products million represented a reduction There was a marked decrease in
and services on a full cost of $1.55 million on the previous our net unfunded superannuation
recovery basis through priced year. This was the lowest deposit liability. This occurred as a result
Service Level Agreements with premium levied by the Treasury of our continued extra payments
Directorates. As a preferred Managed Fund on the RTA since and changes to actuarial
supplier for two to three 1994/1995. assumptions. We have an ongoing
years, the BSG is required to Commercial risk commitment entered into
demonstrate improved customer- Contemporary financial and with the State Superannuation
centred services in an efficient economic analysis techniques Board in 1992 to eliminate the
and effective delivery framework. were used to assess infrastructure unfunded liability over 20 years.
This will enable it to return and business asset investment
productivity savings to the RTA proposals to ensure all projects
and ensure the long term were subject to appropriate
viability of the business. criteria including predetermined
rates of return.
The pre-qualification process
applied to potential suppliers
and contractors provided
assurance on the financial
capacity of service providers
to fulfil their obligations.

(54) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:58 AM Page 55

Integrated Management Research and Development Control Management


System Services
Investment in research and
We embarked on a project to development (R&D) continued The quality system accredited
acquire and implement a to improve our work practices Control Management Services
packaged Integrated Management and knowledge. The R&D Branch provided senior
System (IMS) to replace the Program funded 37 projects with managers and other customers
existing Finance and Human a total expenditure of $2.80 with a high quality, cost-
Resources/Payroll systems. The million, including research into: effective auditing service across
key benefits of implementing the – fauna passages across roads, air our full range of activities. It also
IMS will include development quality, koala movements, and supplied corruption prevention
and application of uniform sleep disturbance and investigation services, and
business processes, benchmarking – Roadcrack pavement system, assistance in improving the RTA’s
capabilities and enhanced timber bridge assessment control environment. Further
management information to techniques, pavement stability details of internal audit and
support decision making. and skid resistance, geotextile other services are provided in
use and soil stabilisation, and Appendix 8.
In addition, the new system will
reduce interfaces, streamline and Whisper concrete trial, and
– development of traffic incident M4/M5 Cashback Scheme
automate workflow and business
processes, promote employee modelling software, crash In October 1996 the State
self service capabilities, which simulation and testing of Government announced that
will achieve significant savings. collapsible sign structures, from 1 January 1997 drivers of
perceptual countermeasure road NSW privately registered motor
e-Business safety treatments, and a trial of vehicles using the M4 and M5
alcohol ignition interlock devices. motorways would be eligible to
Significant efficiency gains were
receive a refund on the tolls
achieved using new technology Property Management
paid under the M4/M5
to conduct business electronically.
Our property portfolio is Cashback scheme. This is
Examples included the use of
reviewed regularly. Property administered by the RTA with
purchasing cards to buy and pay
surplus to current and future refund claims made quarterly.
for goods and services, and for
requirements for road During the year 232,721
downloading data, such as
construction and related rebate claims were processed,
purchase card usage details and
purposes was disposed of in representing a 26.7 percent
bank statements from the ANZ
accordance with Government increase over last year. Total
Bank, and loan account balances
policy. Revenue raised was cost of the scheme during
from TCorp. Direct debiting of
returned to the Roads Program. 1999/00, including
the Sydney Harbour Bridge toll
Further details regarding land administration, was $36.2m,
collections was successfully
disposal are provided in compared with $27.9m in
implemented for a number of
Appendix 14. 1998/99. At 30 June 2000,
customers, including the taxi
there were in excess of 104,000
industry.
Cashback accounts registered
with the motorway companies.
The scheme is funded from
consolidated revenue.

(55) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:58 AM Page 56

WHOLE OF GOVERNMENT
PLANNING

(56) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 9:58 AM Page 57

>>
> ONE OF THE MOST DISTINCTIVE FEATURES OF
THE EASTERN DISTRIBUTOR IS THE LANDBRIDGE
OVER THE CAHILL EXPRESSWAY THAT REUNITES
THE TWO HALVES OF THE DOMAIN

(57) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 10:00 AM Page 58

WHOLE OF
GOVERNMENT
PLANNING

In 1998 the NSW Government An RTA Urban Design Advisory


released its visionary plan Action Panel was set up to ensure we
for Transport 2010 which sets achieve the highest possible
forth a whole-of-Government standards of urban and regional
approach for meeting the design excellence. An RTA Urban
Design Noise Wall Panel was also
transport needs of NSW up to set up to specifically review noise
2010. The Plan contains detailed wall proposals and provide
construction programs for the advice. We also established a
integrated expansion of the rail Register of Urban Design
and bus network as well as major Contractors which was compiled
roads. The RTA made a significant following our call for Expressions
contribution to the objectives of of Interest for urban design
the Plan by undertaking the providers. The register will be
following projects: updated periodically.

URBAN DESIGN Completion of the Eastern


Distributor in December 1999
In December 1999 we launched delivered to NSW a landmark
our urban design guidelines project with significant urban
manual Beyond the Pavement – design outcomes which provides
RTA Urban and Regional Design a gateway to Sydney. It
Practice Notes which is aimed at improves the quality of adjacent
changing the way we operate, environments by taking traffic
to improve the design quality of off local streets, allows for the
our projects in the context of enhancement of key public
their urban and regional settings spaces such as Taylor Square,
and to improve the public and for major improvements to
domain. The manual also reflects bus services on Oxford and
a renewed interest around the Flinders Streets. One of its
world in the urban design of most distinctive features is
road projects. It addresses new the landbridge over the Cahill
roads, bus-only transitways and Expressway that reunites the two
the upgrading and retrofitting of halves of The Domain, improves
existing roads in both urban and the setting of the NSW Art Gallery
regional environments. and creates major landscaped
As well as this initiative, we are a green space.
signatory to the NSW Government We contributed $50,000 to a
Urban Design Charter, prepared national urban design competition
by the Urban Design Advisory for Parramatta Road 2000
Service of the Department of and Beyond, which is being
Urban Affairs and Planning. coordinated by the Inner
The charter aims at raising the Metropolitan Regional
standard of urban design in Organisation of Councils.
NSW. It sets out strategies for
Government agencies in NSW We undertook urban design work,
or issued urban design briefs, for
to optimise their responsibility,
numerous programs and projects
show leadership and collaborate
in urban and rural areas including
to create high quality towns, the Transitways program for
cities and scenic areas. Sydney, the Pacific Highway
Development Program, a range

(58) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 10:00 AM Page 59

of projects on the Great Western ALLIANCES AND


Highway, the Northern Distributor PARTNERSHIPS
Extension and Mount Ousley We utilised and promoted
Drive in Wollongong, the alliances and partnerships
Castlereagh Bypass, and Old with industry, national bodies,
Windsor Road in Sydney. academia and other State and
PLANNING TRANSPORT international road agencies.
AND LAND USE TOGETHER Local Government
We ran a major workshop with
stakeholders to review our The Local Government Liaison
Guide to Traffic Generating Committee provided effective
Developments which resulted communication and enhanced
in a series of recommendations coordination between the RTA
including a need to align the and the Local Government and CONCEPT DRAWINGS OF PROPOSED
policy content with current and Shires Associations on road PROJECTS ASSIST IN THE PLANNING AND
emerging NSW Government management policy. COMMUNITY CONSULTATION PROCESS.
strategies and policies governing
The Committee’s quarterly
transport and land use.
meetings discussed joint actions
We played a key role in entering and common understanding
Transport Development across a range of issues including:
Agreements to achieve
– improving value for money in
integrated transport solutions Of these, 28 councils are based in Austroads
the delivery of roadworks
and funding contributions for Sydney and 37 in regional centres.
through the Road Maintenance Our involvement with Austroads
required road infrastructure Together, these councils represent
Reform Package over six million residents in NSW. included the management of
for major development sites
– Federal proposals to increase the National Business Systems
including the ADI site at St Additionally, a Vocational
truck mass limits, and Program and RTA staff
Mary’s and the Boral site at Education and Training Advisory
– reviews of funding arrangements representation on reference
Greystanes. Board (VETAB) approved
following the introduction of groups and R&D project teams.
The RTA is a major contributor Federal tax reform initiatives. Certificate IV in Road Safety course We chaired national groups
($700,000 in 1999/00) to is being piloted in six councils overseeing research and national
The Committee also commissioned across NSW. The course provides a
the Household Travel Survey policy development on road
a Local Government Maintenance framework for competency-based
conducted by the Transport Data structures and environmental
Contracting Reference training for RSOs and will be fully
Centre. This is a comprehensive issues associated with the road
Committee to support implemented in July 2001.
survey of household travel system. Our work with Austroads
implementation of the Road
patterns in the Greater allowed national R&D funds to
Maintenance Reform Package. NSW Police Service
Metropolitan Area and assists be pooled to allow exchange of
in the detailed planning of The Local Government Road Our Enhanced Enforcement information, identify best practice,
the area’s road network. Safety Program Memorandum of program, run with the NSW eliminate duplication and
Understanding (MOU) details Police Service, is aimed at provide efficiency gains through
MAKING ROAD FREIGHT the roles of the RTA and Local discouraging unsafe road user innovation, consistent standards
MORE COMPETITIVE Government in this program, as behaviour by putting in place a and practice.
A variety of studies by the RTA well as their joint responsibilities. higher level of police visibility at
and Department of Transport Signatories to the MOU are the We continued our strong
critical times of the year. During
into the freight needs of NSW Hon. Carl Scully, Minister for international involvement
the year, our funding provided
contributed to the development Roads, and representatives of through cooperative research
almost a 30 percent increase in
of the NSW Government’s Action the three organisations which with the Organisation for
enforcement hours during
for Transport 2010. represent local government in Economic Co-operation and
enhanced funded police
the Program: the NSW Local Development (OECD) and the
We were represented on various operations targeting speeding,
Government Association; the World Road Association
steering committees and helped drink-driving, fatigue and seat
NSW Shires Association and (PIARC). We were represented
fund important studies, including belt use.
the Institute of Municipal on international committees
the City South Freight Study,
Engineering Australia (now A Memorandum of considering issues associated with
and the Port Botany Container
the Institute of Public Works Understanding (MOU) between road tunnels and the environment.
Origin-Destination Survey.
Engineering Australia). the RTA and the NSW Police
We provided over $300,000 in Service has underpinned the Safe communities
The Memorandum of cooperative and coordinated way
funding for two projects to Understanding demonstrates that We are jointly funding with
collect detailed freight data. The the two organisations have NSW Health three-year NSW
the RTA and Local Government worked together to develop and
first, the Commercial Transport agree to work in partnership to SafeComm pilot programs
Study, is being managed by the implement road safety policies in Gundagai, Kiama and
develop and implement strategies and strategies since 1990. The
Transport Data Centre and will aimed at improving road safety Macleay/Hastings. The programs
produce detailed trip tables for MOU details the roles of the RTA are based on the World Health
and reducing road trauma on and the NSW Police Service in
Sydney. The second, an ABS local roads throughout the State. Organisation (WHO) Safe
Freight Movement Survey, is a this program, as well as their Communities Program model,
It also specifically affirms the joint responsibilities to achieve
multi-modal national survey of government’s commitment to the objective being to encourage
freight flows. the goals of Road Safety 2010. local residents to develop a safe
funding the Road Safety Officer
Program to the Year 2010, and To ensure close liaison with the communities approach towards
relates the objectives of the NSW Police Service, the RTA road trauma and general injury
Program to Road Safety 2010. Chief Executive and relevant prevention.
senior RTA staff meet formally with
Currently 65 councils across the the Police Deputy Commissioner
State are participating, employing (Operations) and relevant senior
between them a total of 55 Road police on a quarterly basis. Policy,
Safety Officer (RSO) positions. legislation and upcoming issues
are discussed to facilitate
comprehensive interagency
program delivery.

(59) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 10:00 AM Page 60

OUR PEOPLE

(60) Roads and Traffic Authority Annual Report 2000


(2) Roads and Traffic Authority Annual Report 2000
>>
RTA A_Report NEW GUTTER 30/11/00 10:00 AM Page 61

> (2) Roads and Traffic Authority Annual Report 2000


> RTA STAFF INVOLVED IN
COMMUNITY CONSULTATION
ON THE PACIFIC HIGHWAY

(61) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 10:00 AM Page 62

OUR PEOPLE COUNSELLING SUPPORT


A free Employee Assistance
Program (EAP) continued to
operate for staff and their
families. EAP counsellors reflect
our diverse community, and
among them speak Italian,
French, Swiss, German,
Afrikaans, Zulu, Maltese,
Mandarin, Greek, Thai, Dutch,
Indonesian, Malaysian, Spanish
and Portuguese. A toll free TTY
(teletypewriter) number is
available for the hearing impaired.

WOMEN’S STRATEGY
The RTA’s Women’s Strategy aims
to increase the representation of
women in the RTA workforce. As
at June 2000, 27 percent of staff
were women, with 15 percent
holding management positions.
We place great importance on We have partnerships with In May 2000, the Office of
developing the skills of our staff industry groups and other the Director of EEO in Public
at all levels and ensuring that, Government departments to Employment (ODEOPE) examined
as they retire, we have skilled ensure our training provides
all the skills necessary for our the strategies of some 200
people to replace them. We were government departments and
apprentices to continue to meet
recognised at the Australian statutory authorities across the
current and future needs.
Training Awards in the Industry State. The RTA was subsequently
category for Public Administration LEARNING AND described as being one of the
for best practice in the provision DEVELOPMENT leading employers in terms
of learning and development. We are a Registered Training of EEO.
In addition, on an ongoing basis Organisation (RTO) under S.22c
Our initiatives included the Top
we offer staff a range of training of the Vocational Education and
Steps Program aimed at women
options including formal courses, Training Accreditation (VETA)
in middle management to further
on-the-job training, coaching, Act 1990 with the Vocational
develop career opportunities; the
mentoring, workplace based Education and Training
opportunity to participate in a
projects, involvement in project Accreditation Board (VETAB),
part-time MBA program offered
teams and secondments. qualified to deliver recognised
through the University of
vocational education and
Technology; and the Frontline
RECRUITING THE BEST training courses and assessment
Management Initiative which
As part of our recruitment services. During the year we
offers the opportunities to
program, we recruited our fourth offered a range of courses as
develop team leadership and
annual intake of graduates under well as in-house training to our
people management skills.
our Graduate Recruitment and staff, many in flexible options
Development Program following to fit in with work demands. An Alternative Duties During
a rigorous selection process Courses and training included Pregnancy policy enabled
through universities in Sydney, Management Development, supervisors/managers and staff
around NSW and interstate. specific learning courses for Road to examine options available to
The 13 graduates hold a variety Services (eg OHS for bituminous vary duties or temporarily transfer
of degrees and were given job works), Project Management, staff to another position for the
placements in various parts of Environmental Issues and duration of their pregnancy.
our operations including Civil training for staff working for
Engineering, Traffic and Transport the Sydney 2000 Olympic and OCCUPATIONAL HEALTH
Engineering, Environmental Paralympic Games. AND SAFETY
Engineering, Transport Planning, We continually reduce risks of
Public Policy, Information WORK WELL DONE workplace incidents, injuries
Technology and Business/ For the 1999 RTA Staff Excellence and illness, and provide timely
Commerce. In addition, they Awards, some 93 awards interventions to our staff through
each undertook at least one and commendations were systematic management of OHS
regional placement. A mentor presented to staff over 11 by all levels of management with
was allocated to each graduate different categories: community the assistance of a network of
to help build strong internal consultation, customer service, OHS practitioners throughout
networks and offer assistance environmental awareness, the State.
and advice as needed. occupational health and safety, Our responsibility to ensure a
road safety, team performance, safe and healthy workplace
We employed 34 apprentices innovation and urban design. extends to contractors and their
who were trained as plant Also included were awards for staff. Tenderers for major or high
mechanics, electricians, carpenters leadership and equity, the latter risk projects must have a corporate
(including bridge and wharf and recognising efforts to ensure all OHS management system
carpenter joiners), painters, staff have equal access to accredited by the RTA and the
boilermakers and welders. They information, opportunity and successful tenderer must develop
were employed all around the development. Awards were also approved project and site specific
State as part of our commitment safety management plans before
made for the Customer Service commencing work. Contractors’
to youth employment and Officer of the Year, Motor
training, and rural and regional work sites are periodically
Registry of the Year and audited against OHS specifications.
employment. Apprentice of the Year.

(62) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 10:00 AM Page 63

ABORIGINAL AND TORRES We sponsored a female Aboriginal PEOPLE LESS MOBILE


STRAIT ISLANDERS Liaison Officer to attend the Our Disability Action Plan was
We continued programs and World Indigenous Conference in developed and the following
actions in accordance with the Honolulu in August 1999 and actions taken:
provided a senior management
recommendations of the 1991 – we initiated design and
presenter at the recent NSW
Royal Commission into Aboriginal Reconciliation Convention as fabrication of four poles to
Deaths in Custody including: well as sponsoring 10 delegates accommodate the solar
Employment and training to the convention. powered/cellular network (GSM)
(Recommendation No. 305) roadside emergency phones.
ETHNIC AFFAIRS
Approval was given to commence The main design variation was
We provide services to people in
the recruitment of five people a reduction in the height of the
the most culturally diverse State
with Aboriginal and Torres Strait cavity where the telephone sits
in Australia. Our vast and diverse
Islander backgrounds to be from 950mm to 780mm to
range of customers include
ABORIGINAL LIAISON OFFICERS PLAY located in our regional offices improve access for people in
AN IMPORTANT ROLE IN THE RTA. individuals, private organisations,
at Glen Innes (2), Grafton, wheelchairs
community and road transport
Parkes and Wagga Wagga. The – our staff bulletin board link on
groups, local councils and State
positions, which carry Federal our internal intranet site contains
Government agencies.
and State Government funding disability related web sites and
and training subsidies, include In all our road safety and traffic organisations with an interest in
enrolment in Certificate III management public education disability issues
(Business Administration). campaigns conducted in – we engaged registered architects
geographic areas with ethnic to undertake the design of
Our comprehensive OHS plan, We appointed Aboriginal Liaison populations, we met the building fitout and extension
covering our own people and Officers at Wagga Wagga and requirements for ethnic advertising works to ensure all relevant
contractors, includes policies, Blacktown making a total of four as stated by the Government for standards were complied with
standards and performance employed by the RTA, the others print and electronic media. – we included the words
indicators to guide and measure being at Parkes and Kempsey.
We spent $468,937 advertising ‘including those requiring
our progress in achieving a safer We created and filled a new
in the ethnic media in 1999/2000. adjustment at work’ in our
work environment. position of Aboriginal Program
employment advertisements
Strategy Manager to develop Materials for numerous public
Achievements for the year – over the past few years, Miranda
and lead targeted strategies education initiatives, road
included: Motor Registry has assisted the
across the State. projects, and driver licensing Minerva Special School at
– a saving of $6.33 million (in information are printed in
Our two-year Aboriginal Customer Sutherland prepare school
rebate from the 1996/97 premium) several community languages.
Service Traineeship Scheme students with special learning
and $1.55 million in the workers’
(ACSTS) providing training in Publications on safe cycling, needs to apply for a driver’s
compensation deposit premium
regional Motor Registries, due passenger safety, pedestrian licence. The program is part of
payment, and associated costs,
to end in September 2000, is safety and safe play are available our ongoing involvement with
through OHS and injury
being replaced with a nationally in Arabic, Vietnamese, Italian, community projects and a
management strategies. This
accredited NSW registered Chinese, Spanish and Greek means of promoting road safety
included the availability of
traineeship program offering Croatian, Filipino, Khmer, – we provided school crossing
suitable duties to allow carefully
eight positions in regional and Portuguese, Russian, Samoan, supervisors (SCS) at an annual
monitored return to work
metropolitan locations. The Serbian, Spanish, Tongan, Turkish cost of $2 million to assist school
– a 10 percent reduction in workers’
positions will attract State and and Vietnamese. Interpreters children cross the road safely.
compensation claims from
Federal Government funding, were available at school safety This is extremely helpful to
previous year down from 11.1
salary and training subsidies. committees for ethnic families to children with a disability as
claims per 100 employees in
We employed Australia’s first better understand road safety nearly 89 percent of NSW
1998/99 to 10.0 claims per
Aboriginal female engineer issues for children. children with a disability (around
100 employees in 1999/2000
who recently graduated after 76,600 children) attend school.
– the receipt of the Premier’s
completing a six year RTA The program also provided
Public Sector Award (in the Our Ethnic Affairs priority
engineering cadetship under a employment opportunities for
corporate services reform statement:
joint State and Federal incentive people with a disability and/or
category) and Public Sector Risk
scheme for Aboriginal and Torres We provide services to older people as school crossing
Management Award (from
Strait Islanders. people in the most culturally supervisors
GIO/Treasury Managed Fund)
diverse State in Australia. – our mobility parking scheme
for our OHS program, and Our Aboriginal Employment Our vast and diverse range continued to operate with our
– the development and launch Equity Plan 1998–2003, for which of customers include brochure including a tear-off
of the RTA Contractor Health we received the 1999 Premier’s individuals, private section that allowed people with
and Safety Information Pack for Public Sector Gold Award, has organisations, community a disability or older people to
contractors wanting to do work within its objectives, the design and road transport groups, educate others who misused the
for the RTA. The pack is also and delivery of cultural awareness local councils and State parking spaces
available on our internet site. workshops across the RTA, based Government agencies. – our special disability driving
Despite our efforts and on business needs. The aim is to We are committed to test allowed disabled drivers
demonstrable improvements in ensure that all staff gain a primary delivering quality services to additional time for their test, and
OHS performance there were understanding of Aboriginal road users and customers, – our circular on modified vehicles
two workplace fatalities recorded culture, and can provide quality including the ethnic for people with a disability and
during the year. One of these service to the Aboriginal communities, people with our register of persons authorised
resulted from a vehicle accident community, based on customer disabilities, pedestrians and to make modifications was
within a work site and the and local service delivery needs. cyclists. We will continue to updated and published.
other from skin cancer due implement our Ethnic
to exposure to the sun over Affairs programs throughout
many years. 2000/2001. Most will be
accomplished in the current
financial year whilst others,
to be successfully integrated
and adopted, may take
longer.

(63) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 10:00 AM Page 64

>> CARING FOR


THE ENVIRONMENT

(64) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 10:00 AM Page 65

> TWO COMPENSATORY FROG PONDS


HAVE BEEN BUILT AT ARNCLIFFE FOR THE
GREEN AND GOLDEN BELL FROG,
ADJACENT TO THE M5 EAST MOTORWAY

(65) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 10:00 AM Page 66

CARING FOR THE


ENVIRONMENT

Figure 13 – Noise Abatement Program Expenditure Summary The RTA recognises that the road In all, $5.54 million was spent
network and the community’s on State Roads benefiting 177
$ Millions

15 use of roads affects both the residences, two schools, one


natural and built environment public reserve and one caravan
as well as the patterns of life of park and $1.89 million on
individuals and communities. Federal Roads, benefiting 113
Environmental planning and residences and one school.
management is a core part of Locations included Sydney, the
12
our business. In recognition of Blue Mountains and the Southern,
this we work cooperatively with Hunter and Northern Regions.
communities and all levels of ENVIRONMENTAL IMPACT
government on environmental ASSESSMENT
issues while also developing We undertake environmental
9
and implementing strategies, assessments of proposed projects
policies and procedures to to determine the significance of
ensure improved RTA-wide likely impacts on the environment
environmental performance. and to develop measures to
6 ROADS AND NOISE avoid or minimise these impacts.
We apply the NSW Government Environmental Impact Statements
Environmental Criteria for Road (EIS) are prepared where impacts
Traffic Noise to all new road and are likely to be significant under
road redevelopment projects. Part 5 of the Environmental
3 The site specific requirements Planning and Assessment Act,
of each project are taken into 1979 or where the proposed
account in the design process development is designated
to meet the criteria, subject to under Part 4 of the Act. EISs
an assessment of practicality, detailing the significance of likely
0
cost-effectiveness, visual impacts on the environment
1995/96 1996/97 1997/98 1998/99 1999/00 impacts, equity issues and and outlining measures to
community preferences. minimise them were exhibited
Total Expenditure State Expenditure Federal Expenditure Stages of project development for the following major road
where potential road traffic noise developments:
impacts are examined begin Pacific Highway Upgrading:
with the initial network analysis, – Karuah bypass (55km north of
route/option selection, concept Newcastle)
design, detailed design right – Bangalow–St Helena (35km
through to construction and north of Ballina)
completion. – Coopernook–Moorland (25km
Construction noise emissions north of Taree)
are assessed against the EPA’s Great Western Highway Upgrading:
construction noise guidelines – Little Hartley (16km east of
as part of the environmental Lithgow)
impact assessment and – Princes Highway – Trunkatabella
subsequent environmental Creek Bridge Replacement
management processes. (17km south of Moruya).
Funding was allocated through We prepared 403 Reviews of
the Noise Abatement Program Environmental Factors (REFs) of
to reducing noise on selected proposed works across the State.
existing State and Federal Roads. REFs assist us in considering
A variety of methods was used environmental matters when
including barriers, earth mounds, deciding whether a proposal
architectural acoustic treatments is likely to significantly affect
and quieter pavement surfaces. the environment.
See Figure 13.

(66) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 10:00 AM Page 67

THREATENED FLORA NATURAL AND CULTURAL


We have commitments in four HERITAGE
plans of recovery for threatened We received the Energy Australia
flora species as established under National Trust Heritage Award
the Threatened Species for the Study of the Relative
Conservation Act, 1995. They are: Heritage Significance of Timber
– Acacia pubescens (Downy Wattle) Truss Road Bridges in NSW at
Sydney region the annual National Trust
– Microtis angusii (Angus’ Onion Heritage Awards. Heritage
Orchid) Sydney region information on bridges in the
– Grevillea caleyi (Caley’s Grevillea), study was incorporated into our
Sydney region Heritage and Conservation
– Eleocharis tetraquetra (Square- Register. The register, a
stemmed Spike-rush) mid-North requirement under Section 170
Coast region. of the NSW Heritage Act 1977,
A detailed report on our action assists in asset management by
to meet our commitments is listing and providing information
provided in Appendix 5. on assets in our ownership, care
or control which have heritage
THREATENED FAUNA significance. During the year the
register was made available on
Compensatory Frog Ponds
our web site. The status of items
MANAGING OUR ROADSIDES A two-year Roadside Assessment A population of the endangered currently on the register is
We supported the NSW Roadside and Management Program Green and Golden Bell Frog shown in Appendix 4.
Environment Committee which was set up to develop plans for (Litoria aurea) exists at Arncliffe,
roadsides across NSW. It will Other achievements included:
encouraged and assisted roadside adjacent to the M5 East
include an assessment of roadside – completion of our Heritage
managers such as local councils, Motorway development. The
natural and cultural resources and Strategic Plan drawing together
Rural Lands Protection Boards, population has declined in
preparation of plans to assist in the many facets of heritage
utility providers and Landcare protecting these resources during recent years due to deterioration management and providing
groups to improve their road maintenance activities. of the habitat. The route of the direction for management to
management of important M5 East does not impact on 2004
natural, cultural and economic CENTRAL WEST ROADSIDE the primary habitat of the frog – the Heritage Committee, which
resources on roadsides and stock CORRIDOR PROJECT population, but does affect their met quarterly, provided a
routes. Specific programs and 1999/2000 foraging habitat. To compensate proactive approach to heritage
activities included: This is a joint RTA-Greening for the loss of foraging habitat, issues and gave advice on
– conducting regional, Australia initiative aimed at the RTA has constructed two development of policy and
multidisciplinary workshops preserving and enhancing compensatory frog ponds. To management of our heritage
on best practice roadside roadside corridors and enhancing contribute to the conservation portfolio, and
environmental management. their value. The project links State and management of the Green – guidelines were drawn up giving
Workshops were held in Bega, highways between Lithgow in the and Golden Bell Frog, the RTA a clear direction for the RTA Oral
Nyngan and Lismore. The east, Marsden in the southwest supplied four adult frogs from History program set up in 1997
committee also joined with and Gilgandra in the north. the Arncliffe site (two males and to record interviews with people
Environment Australia and the two females) to Taronga Zoo for
Two guidelines were completed who have historical knowledge
Environment Protection Authority use in their captive breeding
during the year: State Highway 6 about roads, bridges and related
(EPA) in conducting workshops in program. Captive bred Green
Mid-Western Highway Roadside archival topics.
Gunnedah and Rylstone and Golden Bell Frog tadpoles
Management Guidelines and
– participation in the NSW were released in January 2000
State Highway 27 Golden
Government's litter prevention at the Arncliffe compensatory
Highway Roadside Management
program, involving State and ponds. These actions have
Guidelines.
Local Government agencies assisted in the long term survival
and community organisations Significantly, approximately of the Green and Golden Bell
– continuing development of an 25,000 trees were planted and Frog population in the local area.
accredited curriculum on 6km of direct seeding carried
linear reserve conservation, in out at 20 different sites. A Koalas and roads
collaboration with the Industry monitoring system to measure
A major six-year research
Training Advisory Boards for the success of roadside tree
program investigated the impact
Forestry, Public Sector, planting and direct seeding was
of road development on koala
Construction and Primary established. From commencement
populations. Two Pacific Highway
Industries. Development of the of the project an average survival
development projects that pass
curriculum was funded by the rate of 82 percent of trees planted
adjacent to koala populations
NSW Department of Education was achieved and a direct
are being used as trial sites. The
– provision of publications and seeding average of 16 plants
Australian Museum is currently
advice on the development of per 100m of roadside.
monitoring the movement
roadside environmental All existing roadside corridor patterns and home ranges of
management plans. A bulletin assessment data for the Central the koalas, and will continue to
outlining progress and activities West region was put onto a monitor their movements during
was published and distributed spatial information system to the construction and operation of
in April 2000 and a Landcare increase access to data new roads. This project will seek
package developed and throughout the region. to determine the success of fauna
distributed through more than
mitigation measures in providing
30 Landcare publications, and
safe passage across roads, and
– research into the costs and
will improve our ability to
benefits of a variety of roadside
minimise impacts on koalas
management techniques,
and other fauna in the future.
currently being carried out by
the University of Western Sydney.

(67) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 10:00 AM Page 68

MANAGING AIR QUALITY Tunnel ventilation workshop MANAGING WATER


Action for air In June 2000, the RTA convened
QUALITY
Our core business of road
an International Workshop on
The RTA contributes to the NSW development and management
Tunnel Ventilation which brought
Government’s Action for Air plan incorporates many activities that
experts in a range of technical
by implementing several major may impact on the water quality
disciplines from around the
initiatives to encourage the of inland waterways and estuarine
world to Sydney. The Workshop's
use of public transport. These environments. Consequently we
aim was to foster the exchange
include the provision of bus-only have developed appropriate
of knowledge and ideas about
transitways, dedicated bus lanes water quality management
tunnel ventilation techniques,
and bus priority signalling on key policy and procedures. Key
technologies and strategies
road transport corridors and cross- water quality management
that are being used around the
regional bus routes, electronic bus initiatives were:
globe. It provided a unique
passenger information systems,
forum in which experts and – development of a training
and greater use of public
community representatives could program on our water
transport for special events, as
THE RTA WORKED WITH MEMBERS explore the different aspects of management system. A seminar
OF THE LOCAL COMMUNITY IN emphasised in the management
road tunnel ventilation design series for our staff working in
THE CENTRAL WEST ROADSIDE of Olympic test events.
and operations. environment management,
CORRIDOR PROJECT.
As well as being good for your project management, asset
health, cycling and walking are Integrated land use and management and maintenance
environmentally friendly transport planning will be delivered in 2000/2001.
alternatives to travel by car. – communicating the intent and
The RTA is ensuring that new
Our implementation of Action for direction of our Code of Practice
residential developments and
Bikes – BikePlan 2010 is working for Water Management – Road
employment areas are integrated
towards a comprehensive, linked Development and Maintenance
with Sydney's public transport
bicycle network, to provide – assessment of the technical
system. As an example, the ADI
access for people to cycle to components of the NSW
site at St Marys will be served
their desired destinations and Department of Housing’s manual
by two transitways with direct
make cycling a more attractive Managing Urban Stormwater
connection to Penrith and St
option. Similarly, developing – development of a practical guide
Marys Stations. In addition,
Pedestrian Access and Mobility and user friendly model for the
planning has involved cycleways
Plans will lead to improved sizing of sedimentation basins
and pedestrian facilities designed
accessibility and quality of for RTA projects, and
to reduce the level of car activity
pedestrian environments. – review and update of the water
previously associated with
Teleworking initiatives such as management sections of our
‘‘greenfields’’ site development.
the provision of telecentres and Road Design Guide.
programs associated with the As well, the RTA has commenced
Olympics are further influencing revising its Guide to Traffic STORMWATER
transport choices. Generating Developments to ENVIRONMENT
support Action for Air and other IMPROVEMENT PROGRAM
This encouragement of public
Government initiatives that We continued to work with local
transport, cycling, walking and
would moderate traffic growth. councils in the preparation of
teleworking will benefit air
We are working closely with the stormwater management plans
quality and contribute to the
Department of Transport and the (SMPs) with priority given to
targets in Action for Transport on
Department of Urban Affairs and urban catchments. A revised
limiting the growth of traffic.
Planning in developing guidelines Stormwater Environment
Another important initiative is for integrating land use and Improvement Program was
the development of the M5 transport planning. developed comprising actions
East Subregional Air Quality identified in the SMPs to help
Management Plan that will councils implement the SMPs.
investigate local sources of air We also began investigating
pollutants and develop strategies treatment options for State
to improve the local air quality. Roads as identified in the SMPs.
The Plan is being developed in
consultation with community
and local government
representatives.

(68) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 10:00 AM Page 69

RECYCLING – A USER ENVIRONMENTAL Overpasses for possums Heritage and conservation


AND SUPPLIER REPORTING and other marsupials
Methods to encourage the safe Our Heritage and Conservation
The RTA is a participant in the We produced our second RTA
passage of arboreal (tree living) Register is scheduled to be
recycling market, both in the Environment Report which was
marsupials such as ringtail completed within the next two
use of recycled materials for new also published on our website.
possums and gliders across years. Studies of three of our six
work and in the promotion of
RESEARCH AND roads were investigated by the regions will be undertaken in the
recycling of its waste materials
DEVELOPMENT Australian Museum. The research coming year.
such as asphalt pavement, spoil,
bridge timber, greenwaste, A number of projects were included monitoring the Theme-based studies of groups
vehicle licence plates and undertaken, including: movement patterns of possums of heritage items will continue
other recyclable metals. We also Sleep disturbance and gliders in relation to roads. with a study of pre-1930s cast
purchase waste products from Research was carried out on Trial structures were erected and wrought iron bridges.
heavy industry such as slag, the relationships between noise adjacent to roads in the Sydney
The next RTA Oral History project
and fly ash for use on measures, sleep disturbance, and South Coast regions and
will be the Construction of the
construction projects. cardiovascular effects and monitoring equipment installed to
Gladesville Bridge. Interviews for
wakefulness the next day. test whether they are being used
the "Developments in Vehicle
RTA ENERGY by arboreal fauna. Preliminary
The project also delivered Registration, Driver Testing and
CONSUMPTION methodologies that could be results are encouraging and the
Licensing Procedures" oral history
Energy use for 1999/2000 is research will continue into the
used in future studies to gain were completed during the year.
reported in the 2000 RTA next financial year.
further understanding of the A compilation tape will be placed
Environment Report due for
relationship between road traffic Roadside fencing to on the RTA website next year.
release in early 2001.
noise and sleep disturbance. protect fauna
ENVIRONMENTAL Fauna fencing along selected Sediment Basins
Base-line noise study
MANAGEMENT SYSTEM This project involves identifying roadsides has been in existence
Funding was approved for the
An important milestone in ambient noise levels and noise for some time. The purpose of
assessment of deposited
our continual improvement of sensitive localities in the the fencing is to prevent native
sediment in sedimentation
environmental performance was Newcastle and Wollongong fauna from crossing roads and
basins. This project will determine
the release in June of the RTA regions using monitored and to direct fauna to safe crossing
the pollutant concentrations
Environmental Management System modelled data. The project will points such as underpasses.
in deposited material in
(EMS) Manual. The manual be completed in 2000 and will Research is continuing on
sedimentation basins and assess
formalises our environmental assist in developing noise developing installation and
the annual input to basins. Key
management direction and abatement program priorities. maintenance principles to ensure
objectives are to provide:
describes the planning, the fences remain effective in
Vehicle wake modelling the long term. – information for the design of
implementation, reporting and
This project aims to quantify sedimentation basins
review mechanisms that are in WHAT’S AHEAD FOR THE
the impact of vehicle wake – a basis for monitoring
place for improving overall
turbulence on the dispersion and RTA AND THE requirements for basins, and
environmental performance.
concentration of traffic-generated ENVIRONMENT – information for assessment of
It includes:
air pollution near roads. The disposal options for sediments.
Habitat Edge Effects
– requiring contractors seeking work was awarded to the
work on major RTA projects to University of New South Wales The development of roads often Environmental Management
have their own accredited EMS as a three year Ph.D project. creates changes to natural Systems (EMS)
– establishment of an environmental habitat adjacent to the cleared
The study includes investigating Our Environmental Strategic
legislation register, easily road corridor. These changes are
the wake turbulence effect of air Plan will be reviewed in the
accessible on our internal intranet, called habitat edge effects. We
pollutants from multiple vehicles year ahead and organisational
to help staff identify their are investigating the extent and
including trucks, buses and cars. performance measures further
obligations under environmental impact of these habitat edge
Open and sheltered valleys developed to evaluate our
legislation, and effects so that appropriate
A project to monitor roadside air environmental performance.
– implementation of a new responses can be determined.
quality in open and sheltered Performance against these
contract specification for This investigation will also assist
valleys was begun. It aims to measures will be recorded in
environmental management in the development of policy
provide information on dispersion future reports. Contractors
maintenance works. and guidelines for the provision
patterns in valleys and assist with seeking work on mid-sized
The EMS completed in July 1999 of mitigation measures.
the assessment of dispersion projects will be required to have
by our Operations Road Services an EMS accredited with the RTA.
model performances. Noise management and
Branch was accredited in
The monitoring work at sheltered abatement
August 1999 and our Client
Services Directorate EMS Manual, valley sites was completed A noise management manual
the last of three major project and a draft report on the results will be completed to assist staff
management systems Client submitted to the RTA. The and contractors to manage
Services has produced over monitoring work at open valleys road traffic noise, vehicle noise,
the last 18 months, was also will commence once the selection construction noise and vibration.
completed and made available of suitable sites is finalised. The provision of noise abatement
to staff. measures for existing roads will
continue in 2000/01 using $3.25
REGULATORY COMPLIANCE million of allocated State funding
A penalty infringement notice, and $0.75 million of allocated
carrying a fine of $1,500, was Federal funding.
issued to the RTA in February
for inappropriate cleaning of a
bitumen sprayer at a roadside
stockpile site near Bowenfels.
The infringement related to
undertaking the activity in a
location that created the
potential to pollute waters.

(69) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 10:00 AM Page 70

CORPORATE
GOVERNANCE

We implemented corporate The committee meets every CORPORATE CREDIT AND


governance practices to achieve three months to advise the Chief PURCHASING CARDS
high standards of business ethics Executive, consider progress The introduction and use of
and accountability throughout the under the strategic audit plan, corporate credit and purchasing
organisation and to ensure we generally oversee the direction
cards throughout the RTA has
of the audit function and to
delivered cost effective products been in accordance with the
consider our financial control
and services to the community. and reporting systems. It makes Premier’s memoranda and the
an effective contribution to Treasurer’s Directions.
STATUTORY FRAMEWORK
internal controls and improved
The RTA is a NSW statutory accountability by monitoring YEAR 2000 COMPLIANCE
authority established under the the implementation of audit The RTA's systems operated
Transport Administration Act recommendations arising from normally during and after the
1988. We administer the the audit reports. changeover from 1999 to 2000.
Transport Administration Act For more information see
1988, the Roads Act 1993, Road CODE OF CONDUCT Appendix 15 for the Y2K
Transport (General Act) 1999, AND ETHICS Compliance Report.
Road Transport (Safety and Traffic This details the standards and
Management) Act 1999, Motor values we apply in relationships EXECUTIVE APPOINTMENTS
Vehicles Taxation Act 1988, Road with customers, contractors, AND REMUNERATION
Transport (Heavy Vehicles employees and the community. The Minister for Roads is
Registration) Act 1995, Road The code is reviewed regularly responsible for approving the
Transport (Driver Licensing) Act and enhanced to ensure it Chief Executive’s appointment
1998, Road Transport (Vehicle provides practical assistance to and contract. The Chief Executive
Registration) Act 1999 and the staff on standards of behaviour is responsible for approving
Driving Instructors Act 1992. and in solving ethical issues. directors’ appointments and
contracts. These contracts may
CORPORATE STRUCTURE STRATEGIC AND BUSINESS have a duration of up to five years
Our Chief Executive is responsible PLANNING and include annual performance
and accountable to the Minister The Chief Executive and senior agreements.
for Roads and Parliament for our management set the corporate
overall performance and for objectives and strategies in line The Chief Executive’s
ensuring we perform in a manner with NSW Government priorities remuneration is determined by
consistent with legislative and the community’s road based the Minister for Roads and the
compliance and best practice transport needs. Our Corporate Chief Executive determines the
principles. Senior management, Strategic Plan, The Journey Ahead remuneration of directors in
advisory bodies and committees 1998–2003, sets out our vision accordance with determinations
(see Appendix 6) assist the Chief and priorities. It is supported issued by the Statutory and
Executive in his duties. with five-year strategic and Other Offices Remuneration
business plans that are reviewed Tribunal on 1 October of each
AUDIT COMMITTEE annually. Progress is monitored year (see also Appendix 7).
An Audit Committee is chaired and reported against these
by the Chief Executive and plans and against community
comprises our senior executives, outcomes. Strategic management
a non-public sector representative and planning is a cyclic process
from the audit profession and an involving analysis of internal and
observer from the Audit Office external environments, strategic
of NSW. development and planning,
service delivery and performance
monitoring and evaluation.

(70) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 10:00 AM Page 71

FINANCIAL
STATEMENTS

(71) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:41 PM Page 72

> 73
74
75
76
77
78
Independent Audit Report
Statement by Chief Executive and Director Finance
Operating Statement
Statement of Financial Position
Statement of Cash Flows
Program Statement – Expenses and Revenues
80 Summary of Compliance with Financial Directives

Notes To and Forming Part of the Financial Statements


82 Summary of Significant Accounting Policies
88 Expenses
91 Revenues
92 Gain/(Loss) on Sale of Non-Current Assets
92 Abnormal Items
92 Appropriations
93 Programs/Activities of the Agency
94 Current Assets – Cash
94 Current Assets – Investments
95 Current/Non-Current Assets – Receivables
95 Non-Current Assets – Land and Building,
Plant and Equipment and Infrastructure Systems
100 Current/Non-Current Assets – Other
103 Current Liabilities – Accounts Payable
103 Current/Non Current Liabilities – Borrowings
104 Financial Instruments
106 Current/Non Current Liabilities – Employee Entitlements
107 Current/Non- Current Liabilities – Other Liabilities
108 Changes in Equity
108 Commitments for Expenditure
109 Contingent Assets
109 Contingent Liabilities
109 Native Title
109 Year 2000
110 Budget Review
111 Cash and Cash Equivalents
111 Reconciliation of Net Cost of Services to Net Cash
Flows from Operating Activities
111 End of Audited Financial Statements
112 Supplementary Financial Information

(72) Roads and Traffic Authority Annual Report 2000 (72) Roads and Traffic Authority Annual Report 2000
RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 73

(73) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 74

ROADS AND TRAFFIC AUTHORITY


Year Ended 30 June 2000

Pursuant to Section 41C (1B) and (1C) of the Public Finance and Audit Act 1983, we declare that in
our opinion:

1. The accompanying financial statements exhibit a true and fair view of the Authority’s financial
position as at 30 June 2000 and transactions for the year then ended.

2. The statements have been prepared in accordance with the provisions of the Public Finance and
Audit Act 1983, the Public Finance and Audit (General) Regulation 1995, the Treasurer’s Directions
and the directives of the Financial Reporting Code.

Further, we are not aware of any circumstances which would render any particulars included in the
financial statement to be misleading or inaccurate.

Noel Hancock
A/Director, Finance
31August 2000

Paul Forward
Chief Executive
31 August 2000

(74) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 75

OPERATING STATEMENT
Roads & Traffic Authority for the year ended 30 June 2000

1999/2000 1999/2000 1998/1999


Actual Budget Actual
Notes $’000 $’000 $’000

Expenses
Operating Expenses
Employee Related 2(a) 140,011 178,266 180,652
Other Operating Expenses 2(b) 316,176 280,675 257,961
Maintenance 2(c) 609,971 605,026 676,524
Depreciation and Amortisation 2(d), 24 443,098 18,973 124,213
Grants and Subsidies 2(e) 33,662 25,020 18,452
Finance Costs 2(f) 78,654 97,600 110,664
Other Expenses 2(g) – – 228,652
Total Expenses 1,621,572 1,205,560 1,597,118

Less:

Retained Revenue
Sale of Goods and Services 3(a) 143,890 122,059 128,504
Investment Income 3(b) 18,247 20,006 23,859
Retained Taxes, Fees and Fines 3(c) 3,203 3,424 2,235
Grants and Contributions 3(d) 39,914 12,001 23,352
Other Revenue 3(e), 5, 24 1,737,638 27,061 1,802,928
Total Retained Revenue 1,942,892 184,551 1,980,878

Gain/(Loss) on Sale of Non-Current Assets 4 783 – (1,298)

NET COST OF SERVICES 24, 26 (322,103) 1,021,009 (382,462)

Government Contributions
Recurrent Appropriation 6 1,042,464 1,020,478 971,058
Capital Appropriation 6 853,151 847,394 875,022
Total Government Contributions 1,895,615 1,867,872 1,846,080

SURPLUS/(DEFICIT) FOR THE YEAR 2,217,718 846,863 2,228,542

The accompanying notes form part of these statements.

(75) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 76

STATEMENT OF FINANCIAL POSITION


Roads & Traffic Authority as at 30 June 2000

1999/2000 1999/2000 1998/1999


Actual Budget Actual
Notes $’000 $’000 $’000

ASSETS

Current Assets
Cash 8 41,334 40,573 22,818
Investments 9 4,477 41 4,260
Receivables 10 26,975 18,827 27,887
Inventories 7,865 5,900 7,101
Other 12 2,146 1,436 2,415
Total Current Assets 82,797 66,777 64,481

Non Current Assets


Land and Buildings 11 2,490,894 2,166,819 1,844,684
Plant and Equipment 11 78,913 97,493 85,358
Infrastructure Systems 11 44,992,883 42,421,830 44,302,467
Receivables 10 48,413 50,887 43,662
Other 12 670,543 574,340 625,182
Total Non Current Assets 48,281,646 45,311,369 46,901,353
Total Assets 48,364,443 45,378,146 46,965,834

LIABILITIES

Current Liabilities
Accounts Payable 13 251,393 280,037 255,923
Borrowings 14 149,563 54,854 271,456
Employee Entitlements 16 96,885 75,683 96,696
Other 17 41,367 37,348 36,637
Total Current Liabilities 539,208 447,922 660,712

Non Current Liabilities


Borrowings 14 890,509 978,141 680,147
Employee Entitlements 16 204,659 317,940 325,170
Other 17 442,447 442,319 455,686
Total Non Current Liabilities 1,537,615 1,738,400 1,461,003
Total Liabilities 2,076,823 2,186,322 2,121,715
Net Assets 46,287,620 43,191,824 44,844,119

EQUITY

Reserves 18 9,036,811 4,401,131 5,495,529


Accumulated Funds 18 37,250,809 38,790,693 39,348,590
Total Equity 46,287,620 43,191,824 44,844,119

The accompanying notes form part of these statements.

(76) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 77

STATEMENT OF CASH FLOWS


Roads & Traffic Authority for the year ended 30 June 2000

1999/2000 1999/2000 1998/1999


Actual Budget Actual
Notes $’000 $’000 $’000

CASH FLOWS FROM OPERATING ACTIVITIES

Payments
Employee Related (187,957) (182,367) (158,766)
Grants and Subsidies (33,662) (25,020) (18,452)
Finance Costs (96,372) (97,600) (112,137)
Other (979,585) (874,682) (962,378)
Total Payments (1,297,576) (1,179,669) (1,251,733)

Receipts
Sale of Goods and Services 139,067 123,084 128,954
Retained Taxes, Fees and Fines 3,203 3,424 2,235
Investment Income Received 18,247 16,898 20,751
Other 37,069 12,001 23,352
Total Receipts 197,586 155,407 175,292

Cash Flow from Government


Recurrent Appropriation 1,042,464 1,020,478 971,058
Capital Appropriation 853,151 847,394 875,022
Net Cash Flows from Government 1,895,615 1,867,872 1,846,080
NET CASH FLOWS FROM
OPERATING ACTIVITIES 26 795,625 843,610 769,639

CASH FLOWS FROM INVESTING ACTIVITIES


Proceeds from Sale of Land and Buildings,
Plant and Equipment and Infrastructure Systems 41,115 33,132 76,870
Purchases of Land and Buildings, Plant and
Equipment and Infrastructure Systems (911,656) (977,342) (817,238)
NET CASH FLOWS FROM
INVESTING ACTIVITIES (870,541) (944,210) (740,368)

CASH FLOWS FROM FINANCING ACTIVITIES


Proceeds from borrowings and advances 110,000 110,000 –
Repayment of Borrowings and Advances (16,351) (22,400) (157,317)
NET CASH FLOWS FROM
FINANCING ACTIVITIES 93,649 87,600 (157,317)

NET INCREASE/(DECREASE) IN CASH 18,733 (13,000) (128,046)

Opening Cash and Cash Equivalents 27,037 53,573 155,083

CLOSING CASH AND CASH EQUIVALENTS 25 45,770 40,573 27,037

The accompanying notes form part of these statements.

(77) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 78

PROGRAM STATEMENT – EXPENSES AND REVENUES


Roads & Traffic Authority for the year ended 30 June 2000

Road Safety & Road


*Road Network Infrastructure User Management Traffic & Transport
1999/2000 1998/1999 1999/2000 1998/1999 1999/2000 1998/1999
$’000 $’000 $’000 $’000 $’000 $’000

EXPENSES
Operating Expenses
Employee Related 6,221 10,555 117,925 151,482 15,865 18,615
Other Operating Expenses 38,017 38,674 163,376 133,581 78,574 55,252
Maintenance 539,121 606,281 – – 70,850 70,243
Depreciation and Amortisation 435,458 113,520 6,655 9,032 985 1,661
Grants & Subsidies 27,409 13,624 6,080 4,553 173 275
Finance Costs 78,602 110,597 52 67 – –
Other Expenses – 228,652 – – – –
Total Expenses 1,124,828 1,121,903 294,088 298,715 166,447 146,046

Retained Revenue
Sale of Goods and Services 79,699 73,862 59,093 51,485 5,098 3,157
Investment Income 17,980 22,320 118 741 149 798
Retained Taxes, Fees and Fines 691 669 2,512 1,566 – –
Grants and Contributions 30,597 9,043 4,043 6,622 5,274 7,687
Other Revenue 1,737,638 1,802,928 – – – –
Total Retained Revenue 1,866,605 1,908,822 65,766 60,414 10,521 11,642

Gain (Loss) on Sale of Non-Current Assets 783 (1,298) – – – –

NET COST OF SERVICES (742,560) (785,621) 228,322 238,301 155,926 134,404

Government Contributions ** – – – – – –

NET EXPENDITURE/(REVENUE) (742,560) (785,621) 228,322 238,301 155,926 134,404

ADMINISTERED REVENUES
See Note 1(c)

Consolidated Fund
– Taxes, Fees and Fines – – – – – –
– Other – – – – – –
Total – – – – – –

** The description and objectives of each program are summarised in Note 7.


** Appropriations are made on an agency basis and not to individual programs.
Consequently, government contributions are included in the ‘Not Attributable’ column.

(78) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 79

M4 / M5 Cashback Scheme Not Attributable Total


1999/2000 1998/1999 1999/2000 1998/1999 1999/2000 1998/1999
$’000 $’000 $’000 $’000 $’000 $’000

– – – – 140,011 180,652
36,209 30,454 – – 316,176 257,961
– – – – 609,971 676,524
– – – – 443,098 124,213
– – – – 33,662 18,452
– – – – 78,654 110,664
– – – – – 228,652
36,209 30,454 – – 1,621,572 1,597,118

– – – – 143,890 128,504
– – – – 18,247 23,859
– – – – 3,203 2,235
– – – – 39,914 23,352
– – – – 1,737,638 1,802,928
– – – – 1,942,892 1,980,878

– – – – 783 (1,298)

36,209 30,454 – – (322,103) (382,462)

– – 1,895,615 1,846,080 1,895,615 1,846,080

36,209 30,454 (1,895,615) (1,846,080) (2,217,718) (2,228,542)

– – 340,429 291,888 340,429 291,888


– – 509,233 571,258 509,233 571,258
– – 849,662 863,146 849,662 863,146

(79) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 80

SUMMARY OF COMPLIANCE WITH FINANCIAL DIRECTIVES


Roads & Traffic Authority for the year ended 30 June 2000

1999/2000
Expenditure/ Expenditure/
Net Claim on Net Claim on
Recurrent Consolidated Capital Consolidated
Appropriation Fund Appropriation Fund
$’000 $’000 $’000 $’000

Original Budget Appropriation/Expenditure


– Appropriation Act 1,020,478 1,020,478 847,394 847,394
1,020,478 1,020,478 847,394 847,394

Other Appropriation / Expenditure


– Additional Appropriation – – 470 470
– Treasurer’s Advance 9,127 9,127 – –
– Adjustment to capital allocation – – (8,386) (8,386)
– Section 22 expenditure for certain works 700 700 7,700 7,700
– Section 22A (2) Motor Vehicles Taxation Act
(hypothecation of motor vehicle tax) 19,111 19,111 – –
– Section 225 Roads Act (hypothecation of heavy vehicle overloading fines) 155 155 – –
– Section 26 PF&AA – Commonwealth specific purpose payments 15,458 15,458 5,973 5,973
– Reduction in Commonwealth specific purpose payments (5,152) (5,152) – –
– Transfer to Capital Appropriation (48) (48) – –
– Transfers from another agency (Section 26 of the Appropriation Act) 3,806 3,806 – –
– Reduction in Commonwealth fuel excise funds (21,171) (21,171) – –
21,986 21,986 5,757 5,757
Total Appropriations/Expenditure/Net Claim on Consolidated Fund 1,042,464 1,042,464 853,151 853,151
Amount drawn down against Appropriation – 1,042,464 – 853,151
Liability to Consolidated Fund – – – –

In compiling the Summary of Compliance with Financial Directives for the year ended 30 June 2000, it is assumed that
Consolidated Fund appropriations are expended prior to any other RTA revenue source.
Consolidated funding for the RTA’s Roads Program is classified as recurrent and capital appropriation based upon the way in
which the appropriations are expended. The Program, as part of its appropriation, receives all the revenue from motor
vehicle taxes in accordance with the Motor Vehicles Taxation Act, with the level of the funds from the motor vehicle taxes
not known until 30 June each year.
In 1999/2000 the Roads Program Recurrent Appropriation increased primarily as a result of additional motor vehicle tax
revenue, Commonwealth funding, vehicle registration fees revenue and an adjustment relating to the 1998/99
appropriations, offset by a decrease in fuel excise revenue.
In 1999/2000 the Roads Program Capital Appropriation increased primarily as a result of additional Commonwealth funding
for National Roads and the Blackspots Program and increased motor traffic fines revenue, offset by an adjustment in relation
to the 1998/99 appropriations.

(80) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 81

1998/1999

Recurrent Capital
Appropriation Expenditure Appropriation Expenditure
$’000 $’000 $’000 $’000

943,358 943,358 875,022 875,022


943,358 943,358 875,022 875,022

– – – –
25,460 15,448 – –
– – – –
– – – –

12,252 12,252 – –
– – – –
– – – –
– – – –
– – – –
– – – –
– – – –
37,712 27,700 – –
981,070 971,058 875,022 875,022
– 971,058 – 875,022
– – – –

(81) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 82

NOTES TO AND FORMING PART OF THE FINANCIAL STATEMENTS


Roads & Traffic Authority as at 30 June 2000

1. SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES

(a) Reporting Entity depreciation model for infrastructure assets for the 1999/2000 and
The Roads and Traffic Authority (RTA), as an entity for reporting future accounting periods. The provision for depreciation established
purposes, is responsible for the development and maintenance of in respect of infrastructure assets now recognises the loss of service
the state road network, road safety and road user management, potential over time on a straight-line depreciation basis in accordance
traffic and transport management and administration of the M4/M5 with UIG Abstract 30 and AAS4 ”Depreciation of Non Current Assets”.
Cashback Scheme. The financial statements are prepared in accordance with the historical
(b) Basis of Accounting cost convention except where otherwise stated. All amounts are
The RTA’s financial statements are a general purpose financial report rounded to the nearest one thousand dollars and are expressed in
which has been prepared on an accruals basis and in accordance with Australian currency. The accounting policies adopted are, with the
applicable Australian Accounting Standards, other authoritive exception of the adoption of the straight-line depreciation
pronouncements of the Australian Accounting Standards Board (AASB), methodology for infrastructure assets for 1999/2000 and future
Urgent Issues Group (UIG) Consensus Views and the requirements of accounting periods, consistent with those of the previous year.
the Public Finance and Audit Act 1983 and Regulations. The financial However, the classifications of some revenue and expenditure items
statements also comply with the Financial Reporting Directions have been amended, with the amounts disclosed in the Operating
published in the Financial Reporting Code (FRC) for Budget Dependent Statement for both 1998/99 and 1999/2000 presented in the
General Government Sector Agencies or issued by the Treasurer under amended classifications for comparison purposes.
Section 9(2)(n) of the Public Finance and Audit Act. Where there are (c) Administered Activities
inconsistencies between the above requirements, the legislative The RTA administers, but does not control, the collection of various
provisions have prevailed. fees, fines and levies on behalf of the Crown Transactions Entity.
In the absence of a specific Accounting Standard, other authoritative Monies collected on behalf of the Crown Transactions Entity are not
pronouncement of the AASB or UIG Consensus View, the hierarchy recognised as the RTA’s revenues but are separately disclosed in the
of other pronouncements as outlined in AAS6 “Accounting Policies” Program Statement – Expenses and Revenues.
is considered. Expenses incurred in collecting monies on behalf of the Crown
The Urgent Issues Group (UIG) issued Abstract 30 “Depreciation of Transactions Entity are recognised as the RTA’s expenses and are
Long-Lived Assets, including Infrastructure Assets: Condition-Based reported within the Road Safety and Road User Management Program.
Depreciation and Other Related Methods” on 16 December 1999. The accrual basis of accounting and all applicable accounting standards
The Consensus advised that the Abstract applies to reporting periods have been adopted for the reporting of administered revenues.
ending on or after 16 December 1999, the date on which the
Consensus was agreed. As a result, a review of the RTA’s Condition
Based Depreciation (CBD) methodology was undertaken by the RTA,
with assistance from the Audit Office and NSW Treasury which
indicated that the CBD methodology did not fully conform to the
UIG Consensus View. Accordingly, the RTA has adopted a straight-line

(82) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 83

NOTES (continued)
Roads & Traffic Authority as at 30 June 2000

1. SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES (continued)

(d) Revenue Recognition Payroll tax payable on employee entitlements has been calculated and
Revenue is recognised when the RTA has control of the good or right the liability recognised. Workers compensation that may be applicable
to receive, it is probable that the economic benefits will flow to the RTA to leave entitlements has not been recognised as this expense is based
and the amount of the revenue can be reliably measured. Additional on actual premiums paid, determined from past claims history, and not
comments regarding the accounting policies for the recognition of as a general percentage raised on salaries and wages.
revenue are provided below: (ii) Long Service Leave and Superannuation
(i) Parliamentary Appropriations and Contributions from other Bodies Long service leave is measured on a nominal basis. This method is
Parliamentary appropriations are recognised as revenues when the RTA used because the difference arising from using the nominal method
obtains receipt of the cash. The split between recurrent and capital is compared to the present value method would not result in a material
based on the way the appropriations are to be spent. difference in the financial statements.

Contributions are usually recognised when control of the cash or other Long service leave is calculated on the basis of entitlements of all
asset, including a right to receive, is gained. In relation to the right to employees who have completed five or more years of service together
receive infrastructure assets, the recognition is on a progressive basis with an estimate for employees with less than five years service, based
relative to the contract period. on the percentage who are expected to remain employed by the RTA
long enough to be entitled to long service leave.
(ii) Sale of Goods and Services
Revenue from the sale of goods and services comprises revenue from The superannuation expense for the Basic Benefit and First State Super
the provision of products or services, ie: user charges. User charges are schemes is calculated as a percentage of the employees’ salary. For the
recognised as revenue when the RTA obtains control of the assets that State Superannuation Scheme and the State Authorities Superannuation
result from them. Scheme, the expense is calculated as a multiple of the employees’
superannuation contributions. The final expense is adjusted at 30 June
(iii) Investment Income each year to take account of the actuarial assessment.
Interest revenue is recognised as it accrues. Rent revenue is recognised
in accordance with AAS17 “Accounting for Leases”. (f) Insurance
The RTA’s insurance is arranged through the NSW Treasury Managed
(e) Employee Entitlements Fund Scheme as a self insurance scheme for Government agencies.
(i) Wages and Salaries, Annual Leave, The premiums are determined by the Fund Manager based on past
Sick Leave and Oncosts experience and risk exposures. An outstanding liability also exists in
Liabilities for wages, salaries and annual leave are measured as the respect of the former Department of Motor Transport self-insured
amount unpaid at the reporting date at current pay rates in respect scheme. CTP Insurance is arranged with a private sector provider by
of employees’ services up to that date. the NSW Treasury.
Sick leave accrued by employees of the RTA is all non-vesting and
does not give rise to a liability as it is not considered probable that sick
leave taken in the future will be greater than the entitlements accrued
in the future.

(83) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 84

NOTES (continued)
Roads & Traffic Authority as at 30 June 2000

1. SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES (continued)


(g) Asset Management Policy
The RTA is exempt from the “Recoverable Amount Test” under the provision of paragraph 5.2.3 of
AAS10 – “Accounting for the Revaluation of Non-Current Assets” as it is a not-for-profit entity.
Valuation and depreciation policies are summarised below.
(i) Land and Buildings
Asset Valuation Policy Depreciation Policy

Land & Buildings in Service Land and buildings in service are Buildings – straight line (2.5%)
generally valued at value in use
– Works Administration Properties
(land) and written down
– Officers Residences replacement cost (buildings).
Where such properties are rented
externally they are valued at
current market value.

Land & Buildings Acquired for No depreciation charged as


Future Roadworks buildings are not purchased to
generate revenue but ultimately
– Rentable or Surplus Properties – Current Market Value
to be demolished for roadworks
– Vacant land – Average Rateable Value Per
Hectare of Urban and Rural
Areas within each Local
Government Area (LGA)

Leasehold Improvements Written down historic Amortised over the period of the
(Minimum capital value $5,000) cost/revalued amount lease, or the useful life of the
improvement to the RTA,
whichever is shorter

Included in the value of land and buildings in service is an amount of $6.121 million (1998/99; $5.435 million)
for buildings on Crown land. As the RTA effectively “controls” this Crown land, it has been included in the
RTA’s Statement of Financial Position. Should such Crown land be transferred or disposed of, associated
buildings are written off in the year the transfer or disposal takes place. Crown land, to the value of $77,000,
was transferred to the Department of Land and Water Conservation during 1999/2000.
The RTA’s land and buildings are valued by registered valuers on a progressive basis. To accord with the
requirements of AAS10, the RTA values its land and buildings over a 3 year progressive time frame. During
1999/2000 approximately one third of the RTA’s land and buildings were revalued.

(84) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 85

NOTES (continued)
Roads & Traffic Authority as at 30 June 2000

1. SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES (continued)

(ii) Plant and Equipment


Asset Valuation Policy Depreciation Policy

Plant, Equipment & Vehicles Written down historic cost Straight line (5%–20%) over the
(Minimum capital value $5,000) estimated useful life to the RTA

Computer Hardware Written down historic cost Straight line (20%–33.33%) over
and Software the estimated useful life to
(Minimum capital value of $500 the RTA
and $5,000 respectively)

Electronic Office Equipment Written down historic cost Straight line (20%) over
(Minimum capital value $5,000) the estimated useful life to
the RTA

The written down historic cost is considered to reflect the market value of these assets.
Depreciation and valuation policies in respect of operational assets are subject to annual review. Estimates of
useful life for depreciation purposes have been determined with due regard to a number of factors including
the expected retention period by the entity and the underlying physical, technical and commercial nature of
the assets as defined in AAS4. In accordance with this standard the shortest alternative useful life is applied.
Approximately 35% (1998/99; 48%) of the RTA’s assets in the categories of plant, equipment, vehicles,
computer hardware and software and electronic office equipment are fully depreciated.
(iii) Infrastructure Systems
Asset Valuation Policy Depreciation Policy

Roads Written down replacement cost


Earthworks Depreciated over estimated
useful life of 100 years
Pavement Depreciated over estimated
useful life dependant on
pavement surface
15 years (unsealed)
20–40 years (flush seal/asphalt)
40–50 years (concrete)

Bridges Written down replacement cost Depreciated over estimated


useful life dependant on
bridge type
Timber structures 60 years
Concrete structures 100 years
Steel structures 100 years
X Trusses (timber and steel) 60 years
High Value Bridges 200 years

Traffic Signals Written down replacement cost Depreciated over estimated


useful life of 20 years

Traffic Signal Control Network Written down replacement cost Depreciated over estimated
useful life of 7 years

Land under roads and Average rateable value per No depreciation applied as land
within road reserves hectare of urban and rural areas does not have a limited useful life
within each Local Government
Area (LGA)

(85) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 86

NOTES (continued)
Roads & Traffic Authority as at 30 June 2000

1. SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES (continued)

The RTA, being responsible for the development and management of Major works-in-progress are valued at construction cost and exclude
the State’s road network, has recognised the control aspect of some the cost of land, which is currently disclosed as land under roads. It is
infrastructure assets and the ownership of other infrastructure assets considered that, in their current use, these assets have no market and
when formulating policy in respect of the valuation and reporting as such, a market valuation is not possible.
of infrastructure.
Accounting Standard AAS4 – “Depreciation of Non Current Assets”
Roads, bridges and traffic signals and related equipment constructed outlines factors to be considered in assessing the useful life of an asset
during any year are brought to account in that year at construction cost. for depreciation purposes. These factors include wear and tear from
In subsequent years those assets are included with other infrastructure physical use and technological and commercial obsolescence.
assets and subject to the valuation policies outlined below.
Prior to the 1999/2000 accounting period, the RTA utilised a condition
The valuation policies provide for roads, bridges and the traffic signal based depreciation methodology to determine the annual depreciation
control network, comprising the traffic control network and the traffic charge and accumulated depreciation of infrastructure assets. Following
signal network, to be valued using the modern equivalent replacement the Consensus reached by the Urgent Issues Group on 16 December
cost method. Each road is assigned a value which equates to the cost 1999 and the issue of Abstract 30 “Depreciation of Long-Lived Physical
of replacing that road to a modern equivalent asset and discounting Assets, including Infrastructure Assets: Condition-Based Depreciation
the estimated value of modern features, such as noise walls, not and Other Related Methods”, the condition based depreciation
present in the existing asset. In the case of bridges, such replacement approach has been discontinued for financial reporting purposes.
cost is the cost to construct a new bridge to the modern standard.
The methodology adopted for 1999/2000 and future accounting
High value bridges are valued on an individual basis. The replacement
periods is straight-line depreciation in accordance with AAS4
cost of the traffic control signal network is based on the current cost to
“Depreciation of Non Current Assets”. The road assets are considered
replace the SCATS system computers and peripherals. The replacement
to consist of two components, pavement and earthworks, each
cost of the traffic signal network is the cost to reconstruct each site
with a corresponding useful service life.
using the number and current cost of lanterns and electronic
controllers at each site as the major components to determine the Depreciation is calculated for each of the current 17,000 (approximately)
replacement cost. road management segments and aggregated for each road and
pavement type. Bridge assets are assessed by bridge type and
The determination of unit replacement rates for road, bridge and traffic
depreciation is calculated on a straight line basis.
control signal infrastructure valuations is carried out at least every five
years by suitably qualified engineering contractors and employees of The respective provisions for depreciation of infrastructure assets
the RTA. Assets are recorded initially at construction cost and the recognise the total accumulated depreciation of those assets on a
annual percentage increase in the Road Cost Index is applied each straight-line basis over the assessed useful life of those assets as at
year until the following unit replacement review is undertaken. 30/6/2000.
Subsequent to the review, infrastructure is valued using the unit (iv) Private Sector Provided Infrastructure
replacement rates, adjusted by the Road Cost Index as applicable. Unit The RTA has recognised an infrastructure asset in respect of the Sydney
replacement rates for roads and traffic signals were reviewed during Harbour Tunnel. It has been valued at the estimated current written
1999/2000. High value bridges and bridge size culverts were also down replacement cost of the Tunnel at the date of transfer to the RTA
revalued during 1999/2000. in 2022 (refer Note 12(b)).
In respect of land under roads and within road reserves, valuations are In respect of the M2, M4, and M5 Motorways and the Eastern
assessed according to the average rateable value per hectare of urban Distributor the RTA values the asset by reference to the RTA’s emerging
and rural areas within each Local Government Area. Such valuations, share of the written down replacement cost of each asset apportioned
which are undertaken annually by the RTA’s registered valuers, are over the respective period of the concession agreement.
based upon the data provided by the Local Government Grants
Commission and the Valuer General. (v) Cultural Collection Assets
The RTA has for the first time in 1999/2000 recognised its Cultural
Collection items as assets where those items can be reliably valued.
These assets have been brought to account in accordance with AAS1.
Other Cultural Collection items are disclosed by way of a note.

(86) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 87

NOTES (continued)
Roads & Traffic Authority as at 30 June 2000

1. SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES (continued)

(h) Investments
Due to the short-term nature of the RTA’s investments, book, face and
market values are equivalent. Investments held are not quoted on
a stock exchange.
(i) Provision of Material Assets
No material assets were provided free of charge to the RTA during the
1999/2000 financial year. However, at a small number of locations,
Crown land was provided at peppercorn rentals.
(j) Inventories
Inventories are stated at the lower of cost and net realisable value. Cost
is calculated using weighted average cost. Inventories consist mainly of
raw materials and supplies used for the construction and maintenance
of roads, bridges and traffic signals.
(k) Capitalisation of Expenditure
Expenditure (including employee related costs and depreciation) in
respect of road development, bridge and tunnel replacement and some
road safety and traffic management works are capitalised as part of
Infrastructure Systems.
(l) Financial Instruments
Financial Instruments give rise to positions that are a financial asset or
liability of the RTA and a financial liability or asset of another party. The
RTA includes cash at bank, receivables, creditors and borrowings as
financial instruments. In accordance with AAS33 “Presentation and
Disclosure of Financial Instruments”, information is disclosed in Note 15
in respect of the credit risk and interest rate risk of those instruments.
All such amounts are carried in the accounts at values as disclosed
within each of the respective notes to the accounts relating to those
financial instruments.
(m) Year 2000 Compliance Costs
All expenditure incurred concerning the upgrading or replacement of
computer systems in order to make them 2000 compliant was
expensed as it occurred in line with the generally accepted accounting
policy. All external consulting costs and other external costs are
included, except those of a capital nature.
(n) Goods and Services Tax
Amounts paid for works which are to be undertaken after 1 July 2000
include a component for the Goods and Services Tax (GST). Almost all
of the amount payable for GST is claimable by the RTA from the
Australian Taxation Office (ATO). GST has also been collected by the
RTA in respect of sales of its goods and services which are to be
delivered after 1 July. The GST collected is payable to the
Commonwealth. As such, the RTA determines, and discloses the net
amount of GST claimable from, or payable to the ATO at period end.

(87) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 88

NOTES (continued)
Roads & Traffic Authority as at 30 June 2000

2. EXPENSES

The RTA, being a capital works organisation, capitalises a significant portion of expenditure, including
employee related costs and depreciation, to Infrastructure Systems.

(a) Employee Related Expenses


Total employee related expenses are detailed as follows:
1999/2000 1998/1999
$M $M

Salaries and Wages (including Annual Leave) 342.658 343.184


Long Service Leave 12.055 17.836
Superannuation (refer Note 16) (76.280) 64.228
Workers Compensation Insurance 12.150 13.400
Payroll Tax and Fringe Benefits Tax 23.907 24.668
Other 4.444 5.303
318.934 468.619

Of the total employee related expenses, $66.294 million (1998/99; $120.179 million) was capitalised to
infrastructure and $112.629 million (1998/99; $167.788 million) is attributable to maintenance with the
balance of $140.011 million (1998/99; $180.652 million) attributable to other operating programs.
In respect of superannuation, $57.723 million related to the accrued liability recognised as payroll oncost;
with a reduction of $134.003 million attributable to actuarial adjustments and interest.
A total negative expense of $15.856 million in relation to superannuation has been included in the
expenditure capitalised to infrastructure assets.

(b) Other Operating Expenses


1999/2000 1998/1999
$M $M

Registry Customer Services * 89.912 75.918


Driver and Vehicle Management * 27.438 20.017
Road Safety * 45.879 37.430
Traffic and Transport * 78.484 55.132
Ensured Revenue Stream Payments 33.095 32.847
SHB Toll Collections * 3.541 2.554
M4/M5 Cashback Scheme 36.209 30.454
Other 1.618 3.609
316.176 257.961

* These expense categories exclude employee related expenses and depreciation incurred in providing these services.

(88) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 89

NOTES (continued)
Roads & Traffic Authority as at 30 June 2000

2. EXPENSES (continued)

The following key expense items are included in other operating (c) Maintenance
expenses, infrastructure maintenance expenses and infrastructure Maintenance expenditure relates to the maintenance of roads,
system assets as appropriate. bridges and the traffic signal control network and includes employee
(i) Audit Fees related costs.
During 1999/2000 an expense of $0.454 million (1998/99; $0.454 The RTA expended $35.553 million in 1999/2000 (1998/99; $72.510
million) was incurred for the audit of the financial statements by The million) on natural disaster restoration works from State funds. Some
Audit Office of NSW. In addition, special audits in respect of the RTA’s $9.952 million (1998/99; $9.464 million) was also spent on natural
project planning for the GST, its accounting for the Eastern Distributor disaster restoration works on National Highways during the year.
and a review of the M2 Motorway documentation were undertaken The total cost of natural disaster restoration work in 1999/2000 was
as part of the services provided during 1999/2000 by the NSW Audit $45.505 million (1998/99; $81.974 million), which was included as
Office at a total cost of $0.080 million (1998/99; $0.026 million). part of maintenance expenditure.
(ii) Bad and Doubtful Debts (d) Depreciation and Amortisation
The bad and doubtful debts expense for 1999/2000 amounted to (i) Operational Assets
$0.307 million (1998/99; $0.098 million). Total depreciation raised against operational assets during 1999/2000
(iii) Rental Expense (Operating Leases) amounted to $18.804 million (1998/99; $25.365 million). Of this
The Rental Expenses (Operating Leases) relate to Property, IT amount, $7.521 million (1998/99; $10.144 million) was capitalised,
Equipment and Light Motor Vehicles. with the balance of $11.283 million (1998/99; $15.221 million) related
to operating activities. In addition, operational assets were written
Total rental expenses in respect of property operating leases for down by $0.420 million in 1999/2000 (1998/99; $3.852 million).
1999/2000 amounted to $16.091 million (1998/99; $15.443 million).
For IT Equipment total expenses for operating leases was $21.149 (ii) Infrastructure Systems
million in 1999/2000 (1998/99, $11.017) with expenses for Light During 1999/2000 a road network loss of service potential of
Motor Vehicles operating leases being $17.560 million in 1999/2000 $431.395 million was recorded against depreciation. For 1999/2000,
(1998/99, $14.835 million). and future accounting periods, the RTA has adopted a straight line
depreciation methodology in respect of Infrastructure Systems,
(iv) Insurance following the release by the Urgent Issues Group of Abstract 30
Insurance costs for 1999/2000 amounted to $16.309 million “Depreciation of Long-Lived Assets, including Infrastructure Assets:
(1998/99; $16.676 million). Condition-Based Depreciation and the other Related Methods”. Refer
(v) Consultants to Note 1 (b).
The total amount paid to consultants during 1999/2000 amounted to
$0.439 million (1998/99; $0.646 million).
The RTA also engages numerous contractors for professional services
not classed as consultancies, including valuers, legal services, road
and bridge design, investigation , construction supervision and
preparation of Environmental Impact Statements as well as contract
agency services and personnel.

(89) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 90

NOTES (continued)
Roads & Traffic Authority as at 30 June 2000

2. EXPENSES (continued)

1999/2000 1998/1999
$M $M

(e) Grants and Subsidies


Capital Grants
– to Councils for Local Roads 20.665 12.762
– to other Agencies 4.500 –
Grants Under Road Safety Program 5.797 4.269
Other 2.700 1.421
33.662 18.452

(f) Finance Costs


Interest 74.766 101.725
Debt Guarantee 3.000 3.000
Amortisation of premium/discount on Borrowings 0.888 5.939
78.654 110.664

(g) Other Expenses


Revaluation Decrement of Traffic Signals – 227.459
Loan to Sydney Harbour Tunnel Company – 1.193
– 228.652

(90) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 91

NOTES (continued)
Roads & Traffic Authority as at 30 June 2000

3. REVENUES

1999/2000 1998/1999
$M $M

(a) Sale of Goods and Services


Sale of Goods
Number Plates 32.000 29.243
Other 1.477 0.796
Rendering of Services
Third Party Insurance Data Access Charges 8.824 8.472
Toll Revenue (Sydney Harbour Bridge) 56.911 56.362
Other 44.678 33.631
143.890 128.504

(b) Investment Income


Interest 1.340 7.693
Rent 16.907 16.166
18.247 23.859

(c) Retained Taxes, Fees and Fines


Heavy Vehicle Permit Fees 0.691 0.669
Fine Default Fees 2.512 1.566
3.203 2.235

(d) Grants and Contributions


NSW Government Agencies 7.850 12.353
Local Government 1.133 2.012
Other Government Agencies 1.952 3.224
Private Firms & Individuals 6.963 5.763
Natural Disaster funds 22.016 –
39.914 23.352

(e) Other Revenue


Revaluation of Infrastructure Systems – Land Under Roads
and within Road Reserves (Refer Note 5) 1,693.981 1,770.565
Value of Emerging Interest of Private Sector Provided Infrastructure
– M2 (Refer Note 12 (b)) 10.439 7.832
– M4 (Refer Note 12 (b)) 15.341 8.183
– M5 (Refer Note 12 (b)) 9.546 8.962
– Eastern Distributor (Refer Note 12 (b)) 3.997 –
– Loan to Sydney Harbour Tunnel Company (Refer Note 9 (b)) 4.334 –
Privately funded pedestrian overbridges – 7.386
1,737.638 1,802.928

All revenue brought to account in 1999/2000 arises from operating activities.

(91) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 92

NOTES (continued)
Roads & Traffic Authority as at 30 June 2000

4. GAIN/(LOSS) ON SALE OF NON-CURRENT ASSETS

1999/2000 1998/1999
$M $M

Gain on Sale of Property, Plant & Equipment


– Net Proceeds from Sale * 36.355 72.113
– Written Down Value of Assets Sold 35.572 73.411
Net Gain/(Loss) 0.783 (1.298)

Gain on Sale of Investments


– Proceeds from Sale – 98.669
– Written Down Value of Assets Sold – 98.669
Net Gain/(Loss) – –
Net Gain/(Loss) on Sale of Non-Current Assets 0.783 (1.298)

* Net proceeds from sale are determined after taking into account the direct costs associated with property sales
which totalled $4.104 million in 1999/2000 (1998/99; $4.473 million).

5. ABNORMAL ITEMS

1999/2000 1998/1999
$M $M

Revaluation of Infrastructure Systems


– Land Under Roads and Within Road Reserves (1,693.981) (1,770.565)
(1,693.981) (1,770.565)

Abnormal items relating to the revaluation of Infrastructure Systems have been reclassified as Other Revenue
in the Operating Statement. In respect of Land Under Roads and Within Road Reserves, valuations are
assessed according to the average rateable value per hectare of urban and rural areas within each Local
Government Area. Such valuations are based upon the data provided by the Local Government Grants
Commission and the Valuer General. The revaluation increment has been taken through the Operating
Statement to offset decrements of previous years.
Reduction in Superannuation Expense due to Tax,
Actuarial and Interest Adjustments. (Refer Note 16) (134.003) –
(134.003) –

The reduction in Superannuation is offset against the superannuation expense for 1999/2000 which has been
allocated in accordance with the capitalisation of expenditure policy to capital and operating expenditures –
See Note 2(a).

6. APPROPRIATIONS

1999/2000 1998/1999
$M $M

Recurrent Appropriation
– State 925.226 843.104
– Commonwealth 117.238 127.954
1,042.464 971.058

Capital Appropriation
– State 643.810 677.259
– Commonwealth 209.341 197.763
853.151 875.022

(92) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 93

NOTES (continued)
Roads & Traffic Authority as at 30 June 2000

7. PROGRAMS/ACTIVITIES OF THE AGENCY

(a) Road Network Infrastructure


Network Development
Description: Planning, designing, scheduling and organising the development of
road and bridge works.
Objectives: To develop the State’s road network focusing on strategic routes to
promote economic growth, improve road safety, encourage greater
use of public transport and meet environmental targets.
Actively contribute to the ‘Whole of Government’ approach to land
use and transport planning.
Maintenance
Description: Planning, designing, scheduling and organising of work for the
maintenance of roads and bridges, including restoration after
natural disasters.
Objective: To maintain State roads and bridges to agreed economic, technical
and environmental standards.
(b) Road Safety and
Road User Management
Description: Implementing initiatives to ensure safety of people by ensuring safer
roads and safer vehicles. Improve road user, pedestrian and cyclist
behaviour through community education, driver testing and promotional
programs to target compliance with road rules, and address drink
driving, speeding, driver fatigue, and the use of seat belts and
child restraints. Identify safety risks through road safety audits and
investigations. Ensure vehicles meet road worthiness, road impact and
emission standards. Manage the delivery of services through a range
of outlets and channels.
Objective: To reduce the trauma and cost to the community of road deaths and
injuries by ensuring that:
– drivers and motor cyclists are eligible and competent;
– vehicles meet road worthiness, road impact, vehicle emission
standards and that they operate safely; and
– driver and vehicle transactions are accessible and a high standard
of customer service is maintained.
(c) Traffic and Transport
Description: Improving the operational performance of the road network, through
traffic control and driver information systems, management of incidents
and integrated route management strategies. Planning and organising
public transport infrastructure improvements, improving pedestrian and
cyclist facilities and maintaining traffic facility assets.
Objective: To maximise the efficiency of moving people and goods by better
managing the existing road network and encouraging people to use
alternative forms of transport to the motor car.
(d) M4/M5 Cashback Scheme
Description: Reimbursing motorists directly for tolls paid using Cashback Cards on
the M4 and M5 Motorways when driving NSW privately registered cars
and motorcycles.
Objective: To reimburse tolls to motorists driving NSW privately registered vehicles
on the M4 and M5 Motorways.

(93) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 94

NOTES (continued)
Roads & Traffic Authority as at 30 June 2000

8. CURRENT ASSETS – CASH

The cash balance comprises:


1999/2000 1998/1999
$M $M

RTA Operating Account 16.427 4.161


Remitting Account, Cash in Transit & Cash on Hand 24.907 18.657
41.334 22.818

9. CURRENT ASSETS – INVESTMENTS

The RTA’s investments are detailed as follows:


1999/2000 1998/1999
$M $M

TCORP – Hour Glass Facility 0.658 0.936


On Call Deposits 3.453 3.091
Other 0.366 0.233
4.477 4.260

10. CURRENT ASSETS/NON-CURRENT ASSETS – RECEIVABLES

The RTA’s receivables are detailed as follows:


1999/2000 1998/1999
$M $M

(a) Current
Sale of Goods and Services 12.399 8.547
Goods and Services Tax – Claimable from the Commonwealth 0.012 –
Police Security Identification Licence 0.052 –
Other (including cost recoveries relating to motor vehicle
accident damage to RTA property and road clearing) 1.618 1.576
14.081 10.123
Deduct: Provision for Doubtful Debts 1.309 1.513
12.772 8.610
Unissued Debtors 4.526 4.756
Dishonoured Credit Cards 0.003 0.004
17.301 13.370
Accrued Income
– Interest 0.176 0.100
– Property Sales 9.493 14.253
– Other 0.005 0.164
Total Current 26.975 27.887

Most of the RTA’s doubtful debts relate to amounts owing as a result of road accidents where the RTA’s
property is damaged (eg traffic signals & roadside furniture) and tenants who vacate premises without notice
whilst in arrears.

(94) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 95

NOTES (continued)
Roads & Traffic Authority as at 30 June 2000

10. CURRENT ASSETS/NON-CURRENT ASSETS – RECEIVABLES (continued)

Summary of Debts Written Off


1999/2000 1998/1999
$M $M

Motor Vehicle Accident Damage to RTA Property and


Costs for Clearing of Roadway 0.229 0.043
Rental Arrears 0.093 0.073
Works and Services 0.155 0.017
Towing Service Charges for Unattended Vehicles – 0.003
Other 0.034 0.012
0.511 0.148

(b) Non-Current
Non-Current receivables are summarised as follows:

1999/2000 1998/1999
$M $M

Loan to Sydney Harbour Tunnel Company 47.996 43.662


Promissory Notes 0.417 –
48.413 43.662

Repayment of the interest free $222.6 million Net Bridge Revenue Loan by the Sydney Harbour Tunnel
Company is due on 31 December 2022. The Loan has been assessed as recoverable as at 30 June 2000 and
the receivable is valued on a Net Present Value (NPV) basis.
The loan is considered to be part of the RTA’s interest in the Tunnel and, as at 30 June 2000, has been
assessed at $47.996 million (30/6/99; $43.662 million).
Promissory Notes relate to amounts receivable under the Private Sector Road Toll agreement in respect of the
M2 Motorway and the Eastern Distributor.

11. NON CURRENT ASSETS – LAND & BUILDING, PLANT & EQUIPMENT
AND INFRASTRUCTURE SYSTEMS

This asset category consists of Land & Building, Plant and Equipment and Infrastructure Systems.

1999/2000 1998/1999
$M $M

Land and Buildings (See Note 11a) 2,490.894 1,844.684


Plant & Equipment (See Note 11a & 11c) 78.913 85.358
Infrastructure Systems (See Note 11b) 44,992.883 44,302.467
47,562.690 46,232.509

(95) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 96

NOTES (continued)
Roads & Traffic Authority as at 30 June 2000

11. NON CURRENT ASSETS – LAND & BUILDING, PLANT & EQUIPMENT AND INFRASTRUCTURE SYSTEMS (continued)

(a) Land & Building and Plant & Equipment

Land &
Works Administration Buildings
Properties & Officers Acquired
Residences for Future Leasehold
Land Buildings Roadworks Improvements Total
$M $M $M $M $M
Valuation Valuation Valuation Valuation Valuation

Balance 1 July 1999 58.202 90.756 1,693.630 9.470 1,852.058


Additions – 5.630 82.760 0.699 89.089
Disposals – – (32.743) (2.168) (34.911)
Reclassifications (0.280) (3.162) 0.657 2.785 –
Revaluations 10.133 11.196 509.020 – 530.349
Transfer to Infrastructure – – (97.316) – (97.316)
Asset Write down – – – – –
Prior Years Adjustment – – 156.843 – 156.843
Balance 30 Jun 2000 68.055 104.420 2,312.851 10.786 2,496.112

Accumulated Depreciation
Balance 1 July 1999 – 3.661 – 3.713 7.374
Depreciation Expense – 2.185 – 1.310 3.495
Write Back on Disposal – – – (2.168) (2.168)
Revaluation – (3.483) – – (3.483)
Prior Years Adjustments – – – – –
Balance 30 Jun 2000 – 2.363 – 2.855 5.218

Written Down Value


As at 30 June 2000 68.055 102.057 2,312.851 7.931 2,490.894
As at 1 July 1999 58.202 87.095 1,693.630 5.757 1,844.684

Land and buildings for future roadworks comprise untenanted land for road works (average rateable value – $1,697.998
million), surplus properties (market value – $268.318 million), of which properties with an estimated value of up to $35
million could be disposed of during 2000/2001, and rentable properties (market value – $346.535 million).

(96) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 97

NOTES (continued)
Roads & Traffic Authority as at 30 June 2000

Plant
Equipment Computer Electronic
and Motor Hardware Office
Vehicles and Software Equipment Total
$M $M $M $M
Cost Cost Cost Cost

155.961 119.290 8.203 283.454


19.582 0.284 0.627 20.493
(13.185) (31.041) (1.080) (45.306)
(5.455) 4.861 0.594 –
– – – –
– – – –
– – – –
(0.041) (1.121) – (1.162)
156.862 92.273 8.344 257.479

85.254 105.961 6.881 198.096


8.344 6.115 0.849 15.308
(4.126) (29.481) (1.034) (34.641)
– – – –
(0.005) (0.192) – (0.197)
89.467 82.403 6.696 178.566

67.395 9.870 1.648 78.913


70.707 13.329 1.322 85.358

(97) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 98

NOTES (continued)
Roads & Traffic Authority as at 30 June 2000

11. NON CURRENT ASSETS – LAND & BUILDING, PLANT & EQUIPMENT
AND INFRASTRUCTURE SYSTEMS (continued)

(b) Infrastructure Systems


Infrastructure systems are valued as follows:
1999/2000 1998/1999
$M $M

Roads – Written Down Replacement Cost


Opening Balance – Replacement Cost 24,293.284 23,219.460
Add: New Roads at cost 449.538 700.190
Transfer to Traffic Signals – (422.581)
Revaluation 4,569.125 796.215
29,311.947 24,293.284
Less: Accumulated Depreciation
Opening Balance 4,313.280 4,029.931
Adjustment for change in accounting policy 3,106.646 –
Adjusted Opening Balance 7,419.926 4,029.931
Revaluation 1,959.121 –
Inflation Adjustment – 191.425
Current Year Expense 376.080 91.924
9,755.127 4,313.280
Roads – Written Down Value 19,556.820 19,980.004

Land Under Roads and Within Road Reserves


Opening Balance 18,887.907 16,926.839
Transfer in from “Land and Buildings acquired for Future Roadworks”
(Refer Note 11 (a)) 97.311 190.503
Revaluation 1,696.981 1,770.565
Total Land under Roads and Within Road Reserves 20,682.199 18,887.907

Bridges – Written Down Replacement Cost


Opening Balance – Replacement Cost 4,534.998 4,004.464
Prior Year Adjustment – (34.158)
Add: New Bridges 70.905 104.984
Revaluation 322.613 459.708
4,928.516 4,534.998
Less: Accumulated Depreciation
Opening Balance – Replacement Cost 52.173 50.455
Adjustment for change in accounting policy 1,234.514 –
Adjusted Opening Balance 1,286.687 50.455
Revaluation 72.992 –
Current Year Expense 42.911 1.718
1,402.590 52.173
Bridges – Written Down Value 3,525.926 4,482.825

(98) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 99

NOTES (continued)
Roads & Traffic Authority as at 30 June 2000

11. NON CURRENT ASSETS – LAND & BUILDING, PLANT & EQUIPMENT
AND INFRASTRUCTURE SYSTEMS (continued)

1999/2000 1998/1999
$M $M

Traffic Signals Network – Written Down Replacement Cost


Opening Balance – Replacement Cost 199.731 –
Transfer from Roads – 422.581
Add: New Traffic Signals 1.408 4.609
Less: Traffic Signals Deleted (0.333) –
Revaluation 10.453 (227.459)
211.259 199.731
Less: Accumulated Depreciation
Opening Balance 9.987 –
Current Year Expense 10.563 9.987
20.550 9.987
Traffic Signals Network – Written Down Value 190.709 189.744

Traffic Signal Control Network – Written Down Replacement Cost


Opening Balance – Replacement Cost 10.565 7.208
Add: Additions 10.822 1.420
Prior Year Adjustment – 1.937
21.387 10.565
Less: Accumulated Depreciation
Opening Balance 4.571 3.060
Current Year Expense 1.841 1.511
6.412 4.571
Work-in-Progress 4.624 9.423
Traffic Signal Control Network – Written Down Value 19.599 15.417

Major Works in Progress


Opening Balance 746.570 794.927
Net Additions 271.060 (48.357)
Major Works in Progress 1,017.630 746.570
Total Infrastructure Systems 44,992.883 44,302.467

The network was improved during the year with a number of major projects being opened to traffic.
These included the final stage of the Taree Bypass, the City West Link Road – Section 3, Pacific Highway
improvements at Tyndale, dual carriageway on the Pacific Highway from Bulahdelah to Coolongoolook and
the widening of Southern Cross Drive at Mascot.
The depreciation expense in respect of roads $376.080 million (1998/99; $91.924 million) reflects the loss
of service potential based on the straight-line depreciation methodology adopted following the issue of UIG
Abstract 30 on 16 December 1999 (Refer Notes 1 (b), 1 (g) (iii)). In accordance with the transitional provisions
specified in Paragraph 19 of the Abstract, net adjustments totalling $4,341.160 million has been made to the
opening balances of accumulated depreciation in respect of the 1999/2000 reporting period, being the
reporting period to which the UIG Consensus was first applied. These adjustments ensure that the carrying
amounts of assets and accumulated depreciation reflect the amounts that would have been recognised had
their depreciation methods complied with the requirements of the UIG Consensus at commencement.
Traffic signals and most bridges, were subject to a full revaluation in 1998/1999. High value bridges and all
bridge size culverts were revalued in 1999/2000. Unit replacement rates for roads and traffic signals were
reviewed in 1999/2000.
(c) Cultural Collection Assets
At 30 June 2000 Cultural Collection Assets, including original art works , have been brought to account
at a value of $0.033 million.
Other Cultural Collection items, including prints, drawings and artifacts, were also identified as being under
the control of the RTA, but could not be reliably valued.

(99) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 100

NOTES (continued)
Roads & Traffic Authority as at 30 June 2000

12. CURRENT/NON CURRENT ASSETS – OTHER

(a) Current
These comprise:
1999/2000 1998/1999
$M $M

Prepayments 2.146 2.415


2.146 2.415

(b) Non-Current
The RTA’s Other Non Current Assets are represented by Private Sector Provided Infrastructure and prepaid
superannuation contributions as follows:
1999/2000 1998/1999
$M $M

Sydney Harbour Tunnel


Opening Balance 513.642 434.392
Revaluation 3.238 79.250
516.880 513.642

M2 Motorway
Opening Balance 15.772 7.940
Annual Increment – Emerging Right to Receive 10.439 7.832
26.211 15.772

M4 Motorway
Opening Balance 47.316 39.133
Annual Increment – Emerging Right to Receive 15.341 8.183
62.657 47.316

M5 Motorway
Opening Balance 48.452 39.490
Annual Increment – Emerging Right to Receive 9.546 8.962
57.998 48.452

Eastern Distributor
Opening Balance – –
Annual Increment – Emerging Right to Receive 3.997 –
3.997 –
Prepaid Superannuation Contributions 2.800 –
670.543 625.182

(100) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 101

NOTES (continued)
Roads & Traffic Authority as at 30 June 2000

12. CURRENT/NON CURRENT ASSETS – OTHER (continued)

Sydney Harbour Tunnel M2 Motorway


The RTA’s interest in the Sydney Harbour Tunnel has been valued based To facilitate the financing, design and construction of the Motorway,
on the RTA’s right to the time share of its ownership, total service the RTA leased land detailed in the M2 Motorway Project Deed for
potential and remaining useful life at the date of its transfer to the RTA the term of the Agreement.
in 2022. At the date of this transfer, the value will equate to the then Until the project realises a real after tax internal rate of return of
current written down replacement cost of the Tunnel. The cost of 12.25 per cent per annum, the rent is payable, at the Lessee’s
constructing the Tunnel was $683.3 million. The current written direction, in cash or by promissory note. On achievement of the
down replacement cost of the Tunnel is $516.880 million (30/6/99; required rate, the rent is payable in cash. Under the terms of the lease,
$513.642 million). the RTA must not present any of the promissory notes for payment
In separately classifying the Sydney Harbour Tunnel as an infrastructure until the earlier of the end of the term of Agreement or the
asset, the RTA recognises that the contractual arrangements relating to achievement of the required rate of return.
the Tunnel are unique. Payments for the rents for the Trust Lease and the Trust Concurrent
The construction of the Tunnel was financed by 30 year inflation linked Lease for the year ended 30 June 2000 have been made by promissory
bonds issued by the Sydney Harbour Tunnel Company to the private notes in the value of $5.828 million and $1.457 million respectively.
sector of $486.7 million, Sydney Harbour Tunnel Company shareholders’ The RTA, as at 30 June 2000, has received promissory notes for rent on
loans (repaid in 1992) of $40 million, and an interest free, subordinated the above leases totalling $28.372 million. The term of the Agreement
loan (the Net Bridge Revenue Loan) provided by the RTA of $222.6 ends on the forty fifth anniversary of the M2 commencement date
million, based on the projected net toll revenue from the Sydney (ie.26 May 2042), subject to the provisions of the M2 Motorway Project
Harbour Bridge during the construction period. Under the Ensured Deed. The net present value of these promissory notes, as at 30 June
Revenue Stream Agreement (ERS), the Government has agreed to make 2000, is $0.167 million.
ERS payments (net of tolls collected from the Tunnel) to enable the SHTC The RTA has, from the date of completion of the M2 Motorway on
to meet financial obligations arising from the operation and maintenance 26 May 1997, valued the asset by reference to the RTA’s emerging
of the Tunnel and repayment of principal and interest on funds borrowed share of the written down replacement cost of the asset at date of
by it for the design, construction and operation of the Tunnel. handback over the concession period.
During the year ended 30 June 2000, tolls collected from the Tunnel Under the terms of the Project Deed, ownership of the M2 Motorway
amounted to $27.623 million (1998/99; $25.509 million). These tolls will revert to the RTA on the earlier of the achievement of specified
were applied to the financial obligations of the Tunnel and resulted in a financial returns outlined in the Deed or 45 years from the M2
reduction in ERS payments from $70.220 million to $42.597 million Commencement Date of 26 May 1997. The conservative period of
(1998/99; $67.275 million to $41.766 million). 45 years has been used to calculate the RTA’s emerging share of
NSW Treasury guidelines on the valuation of non-current assets state the asset.
that asset revaluations must be conducted at least every five years.
Revaluations were effected in 1994 and 1999, the Tunnel being
revalued using the RTA’s Road Cost Index. The RTA however now
revalues the Tunnel each year. Based on movements in the Road Cost
Index during the 1999/2000 reporting period, the RTA’s interest in the
Tunnel was $516.880 million at 30 June 2000, a revaluation increase of
$3.238 million (1998/99, $79.250 million) over the value of $513.642
million recognised at 30 June 1999.

(101) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 102

NOTES (continued)
Roads & Traffic Authority as at 30 June 2000

12. CURRENT/NON CURRENT ASSETS – OTHER (continued)

M4 and M5 Motorways The RTA’s remaining financial commitment to the project is to fund
The RTA has valued the infrastructure assets in respect of the M4 and the cost of land acquisition, project management and the widening of
M5 Motorways by reference to the RTA’s emerging share of the written Southern Cross Drive. On 26 June 1997, the Government approved a
down replacement cost of each asset apportioned over the period of financial contribution by the RTA of $20 million towards these
the respective concession agreement. construction costs. This is consistent with current estimates with
work continuing in relation to those local traffic improvement works.
Ownership of the M4 Motorway and M5 Motorway will revert to the
In consideration of the RTA granting to AML the right to levy and retain
RTA in 2010 and 2022 respectively.
tolls on the Eastern Distributor, AML is required to pay concession fees
The M5 Motorway Call Option Deed provides that if, after at least in accordance with the Agreement. From the date of Financial Close,
25 years from the M5 Western Link commencement date of 26 June which occurred on 18 August 1997, AML has paid $45 million by
1994, the RTA determines that the expected financial return has been way of promissory notes (being $15 million on Financial Close and
achieved, the RTA has the right to purchase either the business from ILR $15 million on each of the first and second anniversaries of Financial
or the shares in ILR from Infrastructure Trust of AustralAsia Ltd (ITA) and Close). A further $2.2 million was received in cash six months after
the Commonwealth Bank of Australia (CBA). The exercise price under Financial Close. Under the Agreement, the promissory notes show a
the M5 Call Option Deed will be based on open market valuation of payment date (subject to provisions in the Project Deed) of 31
the business or shares. December 2042 and, as at 30 June 2000, the promissory notes have
Eastern Distributor a net present value of $0.250 million.
An agreement was signed with Airport Motorway Limited (AML) in Under the terms of the Project Deed, ownership of the Eastern
August 1997 to finance, design, construct, operate, maintain and repair Distributor will revert to the RTA on the earlier of the achievement of
the Eastern Distributor. Work commenced in August 1997, with the road specified financial returns outlined in the Deed or 48 years from the
to be open to traffic before the Sydney Olympics in September 2000. Eastern Distributor Commencement Date of 18 December 1999.
The Eastern Distributor was opened to traffic on 18 December 1999. The conservative period of 48 years has been used to calculate the
The total cost, including operational and maintenance costs, of the RTA’s emerging share of the asset.
Eastern Distributor is calculated at $700 million.

(102) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 103

NOTES (continued)
Roads & Traffic Authority as at 30 June 2000

13. CURRENT LIABILITIES – ACCOUNTS PAYABLE


1999/2000 1998/1999
$M $M

Trade Creditors 43.073 27.358


Creditors Arising from Compulsory Acquisitions – 1.417
Accrued Expenses
– Contract Expenditure 115.680 105.740
– Work Carried out by Councils 30.980 49.786
– Interest 14.630 27.168
– Other 46.317 43.700
Other 0.713 0.754
251.393 255.923

14. CURRENT/NON-CURRENT LIABILITIES – BORROWINGS


1999/2000 1998/1999
$M $M

Current
Tcorp Borrowings 149.563 271.256
Other – 0.200
149.563 271.456

Non-Current
Tcorp Borrowings 888.409 678.047
Other 2.100 2.100
890.509 680.147

Loan Borrowings are due as follows:


Face Unamortised Adjusted
Value Expense Book Value
$M $M $M

Semi-Government Loans
Within 1 year 39.563 – 39.563
Between 1 and 5 years 503.506 19.858 483.648
After 5 years 423.576 18.815 404.761
966.645 38.673 927.972

The weighted average interest rate on the Semi-Government loan portfolio as at 30 June 2000 is 7.01%
(30 June 1999; 8.98%).

Come and Go Facility


The Treasurer in 1998/99 approved of the RTA utilising a “Come and Go” Facility with Treasury Corporation
up to the value of $150 million for a three year period ending December 2001.
This enabled the RTA to use its investment funds to repay semi government debt, and, over the period
mentioned above, draw back through the facility funds as required to meet the RTA’s expenditure
commitments. Additional funds will be provided to the Roads Program from the net difference between
the lower debt servicing costs of loans and the investment income foregone.
In 1999/2000 an amount of $110 million, included in Current Tcorp Borrowings, was drawn-down from
the Facility to assist in funding major road projects.
1999/2000 1998/1999
$M $M

Other Loan Borrowings


Repayable within 1 year – 0.200
Between 1 and 5 years – –
After 5 years 2.100 2.100
2.100 2.300

(103) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 104

NOTES (continued)
Roads & Traffic Authority as at 30 June 2000

15. FINANCIAL INSTRUMENTS

(a) Interest Rate Risk


Interest rate risk is the risk that the value of the financial instruments will fluctuate due to changes in market interest
rates. The RTA’s exposure to interest rate risks and the effective interest rates of financial assets and liabilities at the
balance sheet date are as follows:

Financial Instrument Floating Interest Rate Fixed Interest Rate


1 Year or Less Over 1 to 5 years
1999 2000 1999 2000 1999 2000
$M $M $M $M $M $M

Financial Assets
Cash 13.472 31.872 – – – –
Receivables – – – – – –
Treasury Corp Hourglass 0.936 0.426 – – – –
Futures Margin – – – – – –
On call Deposits 3.091 3.648 0.148 0.326 – –
Total – Financial Assets 17.499 35.946 0.148 0.326 0.000 0.000

Financial Liabilities
Borrowings – Treasury Corp 47.741 0.606 223.515 38.957 359.407 483.648
– Tcorp Come & Go – 110.000 – – – –
– Other – – 0.200 – – –
Creditors 0.307 0.238 – – – –
Contract Security Deposits – – – – – –
Total – Financial Liabilities 48.048 110.844 223.715 38.957 359.407 483.648

(b) Credit Risk


Credit Risk is the risk of financial loss arising from another party to a contract or financial obligation. The RTA’s
maximum exposure to credit rate risk is represented by the carrying amounts of the financial assets net of any
provisions for doubtful debts included in the Balance Sheet. The repayment of the Sydney Harbour Tunnel Loan ranks
behind all creditors to be paid. Redemption of the M2 and Eastern Distributor promissory notes is dependent upon
counterparties generating sufficient cash flows to enable the face value to be repaid.

Banks Governments Other


1999 2000 1999 2000 1999 2000
$M $M $M $M $M $M

Financial Assets
Cash 13.472 31.872 – – 9.346 9.462
Receivables – – 0.863 0.994 70.686 74.394
Investments 4.027 3.778 – 0.658 0.233 0.041
Total – Financial Assets 17.499 35.650 0.863 1.652 80.265 83.897

(c) Net Fair Values


The carrying value of debtors, investments, creditors and borrowings approximate net fair value. The future cash flows
of the Sydney Harbour Tunnel loan and M2 and Eastern Distributor promissory notes are discounted using standard
valuation techniques at the applicable yield having regard to the timing of the cash flows.

(104) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 105

NOTES (continued)
Roads & Traffic Authority as at 30 June 2000

Total Carrying Amount Weighted Average


Fixed Interest Rate Non Interest Bearing as per Balance Sheet Effective Interest Rate
More than 5 Years
1999 2000 1999 2000 1999 2000 1999 2000
$M $M $M $M $M $M % %

– – 9.346 9.462 22.818 41.334 – –


– – 71.549 75.388 71.549 75.388 – –
– – – – 0.936 0.426 5.21 5.53
– – – 0.036 – 0.036 – –
– – 0.085 0.041 3.324 4.015 4.96 5.38
0.000 0.000 80.980 84.927 98.627 121.199

318.640 404.761 – – 949.303 927.972 8.98 7.01


– – – – – 110.000 – 5.46
2.100 2.100 – – 2.300 2.100 6.70 6.62
– – 24.914 38.693 25.221 38.931 – –
– – 1.335 1.418 1.335 1.418 – –
320.740 406.861 26.249 40.111 978.159 1,080.421

Total
1999 2000
$M $M

22.818 41.334
71.549 75.388
4.260 4.477
98.627 121.199

(105) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 106

NOTES (continued)
Roads & Traffic Authority as at 30 June 2000

16. CURRENT/NON-CURRENT LIABILITIES – EMPLOYEE ENTITLEMENTS

1999/2000 1998/1999
$M $M

Current
Superannuation 54.751 53.664
Annual Leave 26.131 25.062
Long Service Leave 6.754 10.540
Accrued Employee Related Costs 8.382 6.465
Voluntary Redundancies 0.867 0.965
96.885 96.696

Non-Current
Superannuation 98.383 226.456
Long Service Leave 105.580 97.996
Workers Compensation (Liability under the former Department
of Motor Transport self-insured scheme) 0.696 0.718
204.659 325.170
Total Employee Entitlements 301.544 421.866

The Government Actuary completed an assessment of the Gross Superannuation Liabilities for the defined
benefits schemes administered by the SAS Trustee Corporation for the year ended 30 June 2000, identifying
the unfunded superannuation liability of the RTA. The assessment was based on the full requirements of
AAS25 which requires that a “market determined risk adjusted discount rate” be applied as the valuation
interest rate in the calculation on the value of the accrued benefits. A review of the key economic assumptions
used in the 1998 valuation was undertaken prior to calculating the gross superannuation liability of the
various defined benefit schemes as at 30 June 2000.
The economic assumptions used are as follows:
2000/2001 2001/2002 Thereafter
% % %

Rate of Investment Return 7.0 7.0 7.0


Rate of Salary Increase * 4.0 4.0 4.0
Rate of Increase in the CPI 2.5 2.5 2.5

* A promotional scale also applies.

This assessment resulted in the RTA’s liability being reduced by $134.003 million.
Payments are made by the RTA to the Superannuation Administration Authority (SAA) to reduce the
superannuation liability and during 1999/2000 these totalled $54.751 million (1998/99; $53.664 million).
These payments are held in Investment Reserve Accounts.
The unfunded liability disclosed in the Statement of Financial Position is composed of:

SASS SANCS SSS Total Total


$M $M $M 1999/2000 1998/1999

Gross Liability Assessed


by Actuaries as at
30 June 2000 176.804 38.972 349.938 565.714 601.141
Less: Investment Reserve
Account Balance (including
actuarial, tax and interest
adjustments) 69.349 41.772 304.259 415.380 321.021
Unfunded Liability 107.455 (2.800) 45.679 150.334 280.120

(106) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 107

NOTES (continued)
Roads & Traffic Authority as at 30 June 2000

17. CURRENT/NON-CURRENT LIABILITIES – OTHER LIABILITIES

1999/2000 1998/1999
$M $M

Current
Statutory Creditors 15.359 14.741
Principal Outstanding on Bonds Issued to Private Sector 10.131 9.502
Unearned Rent on M4 and M5 Motorways 3.108 3.108
Income Received in Advance 4.075 0.904
Holding Accounts 8.492 7.199
FIRST Scheme 0.041 0.041
Suspense Items 0.161 1.142
41.367 36.637

Non-Current
Principal Outstanding on Bonds Issued to Private Sector 406.463 416.594
Unearned Rent on M4 and M5 Motorways 35.984 39.092
442.447 455.686

The liability in respect of the Sydney Harbour Tunnel has been recognised at the Net Present Value (NPV)
of the Ensured Revenue Stream Agreement (ERS). This has been calculated at $416.594 million (1998/99;
$426.096 million), being the principal outstanding as at 30 June 2000 on the bonds issued by the Sydney
Harbour Tunnel Company to the private sector.
Under the M4 lease agreement, $46.615 million was received from Statewide Roads Pty Ltd (SWR) as rent in
advance. In accordance with generally accepted accounting principles, this revenue is brought to account
over the period of the lease.
This treatment is summarised as follows:
1999/2000 1998/1999
$M $M

Rent earned in prior years 21.372 18.997


Rent earned in current year 2.375 2.375
Unearned rent as at 30 June 2000 22.868 25.243
46.615 46.615

The land acquisition loan of $22 million, based on the cost of land under the M5 originally purchased by
the RTA, was repaid in June 1997 by Interlink Roads Pty Ltd (ILR). The repayment of the loan is considered to
be a prepayment of the remaining rental over the period of the concession agreement. In accordance with
AAS17, this revenue is brought to account over the period of the lease.
This treatment is summarised as follows:
1999/2000 1998/1999
$M $M

Rent earned in prior years 5.043 4.310


Rent earned in current year 0.733 0.733
Unearned rent as at 30 June 2000 16.224 16.957
22.000 22.000

(107) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 108

NOTES (continued)
Roads & Traffic Authority as at 30 June 2000

18. CHANGES IN EQUITY

Accumulated Funds Asset Revaluation Total Equity


1999/2000 1998/1999 1999/2000 1998/1999 1999/2000 1998/1999
$M $M $M $M $M $M

Opening Balance 39,348.590 37,132.871 5,495.529 4,056.500 44,844.119 41,189.371


Adjustment to
opening balance
for change in
accounting policy
for depreciation (4,341.205) (35.622) – – (4,341.205) (35.622)
Transfers from Asset
Revaluation Reserve
for asset disposals 25.706 22.799 (25.706) (22.799) – –
Surplus/Deficit for Year 2,217.718 2,228.542 – – 2,217.718 2,228.542
Increment/Decrement on:
– Land & Buildings – – 690.675 331.133 690.675 331.133
– Authority Infrastructure – – 2,876.313 1,130.695 2,876.313 1,130.695
Closing Balance 37,250.809 39,348.590 9,036.811 5,495.529 46,287.620 44,844.119

19. COMMITMENTS FOR EXPENDITURE

(a) Operating Lease Commitments


Operating Lease Commitments relate to Property, IT Equipment and Light Motor Vehicles.
Operating lease commitments are not recognised in the financial statements as liabilities.
In respect of Property Leases, the RTA has various lessors with leases which have specific lease periods ranging
from 1 year to 20 years.
The Property Operating Lease Commitments are as follows:
1999/2000 1998/1999
$M $M

No later than 1 year 14.167 11.737


Later than 1 and not later than 5 years 39.904 30.662
Later than 5 years 28.844 28.071
82.915 70.470

IT Equipment Operating Leases have been negotiated with Dell Computer Pty Ltd, Fujitsu Australia Ltd, and
Macquarie IT Pty Ltd. The leases are scheduled to cease in June 2002 and June 2004.
The IT Equipment Operating Lease Commitments are as follows:
1999/2000 1998/1999
$M $M

No later than 1 year 9.000 2.900


Later than 1 and not later than 5 years 11.000 8.200
Later than 5 years – –
20.000 11.100

The Light Motor Vehicle Lease is with State Fleet Services and is financed by Macquarie Bank. The lease is
scheduled to cease in September 2008.
The Light Motor Vehicle Operating Lease Commitments are as follows:
1999/2000 1998/1999
$M $M

No later than 1 year 18.000 18.000


Later than 1 and not later than 5 years 72.000 72.000
Later than 5 years 58.500 76.500
148.500 166.500

(108) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 109

NOTES (continued)
Roads & Traffic Authority as at 30 June 2000

19. COMMITMENTS FOR EXPENDITURE (continued)

1999/2000 1998/1999
$M $M

(b) Capital Commitments


Payable no later than 1 year
– Value of work to be completed on road and bridge contracts over $100,000 469.863 421.476
– Plant, light vehicles, trucks 0.840 0.381
Payable later than 1, but not later than 5 years 427.952 439.248
Payable later than 5 years 8.199 22.738
906.854 883.843

(c) Other Expenditure Commitments


Payable no later than 1 year 10.528 13.975
Payable later than 1, but not later than 5 years 1.042 2.476
Payable later than 5 years 0.021 0.071
11.591 16.522

20. CONTINGENT ASSETS

The total commitments detailed above include GST input tax credits of $108.561 million that are expected to
be recoverable from the ATO.

21. CONTINGENT LIABILITIES

There are some 19 claims (1998/99; 28 claims) for damage or injury currently being litigated with an
estimated total contingent liability to the RTA of $5.035 million (1998/99; $4.267 million). There are
also 7 significant contractual disputes (1998/99; 6 disputes) with an estimated total contingent liability of
$38.692 million (1998/99; $46.783 million).
Any claims resulting from incidents which have occurred since 1 July 1989 are not included in the above
figures as costs for such claims are now covered by the RTA’s Insurance with the Treasury Managed Fund.
An additional liability could arise under Clause 4.1(c) of the Ensured Revenue Stream Agreement (ERS) if a
taxation deduction for a claim for depreciation for the immersed tube section of the Tunnel is disallowed to
the Sydney Harbour Tunnel Company. Under such circumstance the ERS provides for a renegotiation of the
method by which ERS payments are calculated which could result in an increased liability to the RTA of
between $31 million and $75 million over the period of the agreement to 2022.

22. NATIVE TITLE

The Commonwealth’s legislation (Native Title Act) and the New South Wales statute (Native Title (New South
Wales) Amendment Act) have financial implications for New South Wales Government Agencies generally.
In this regard the RTA has undertaken an assessment of the impact on its financial position. This assessment
indicates that as at 30 June 2000 there were no Native Title claims which had been initiated against the RTA.

23. YEAR 2000

The RTA established a project team to investigate the effect of the date change from 1999 to 2000 on its
activities. A program was established to help ensure that the impact of the transition to year 2000 on RTA
customers was minimised. In this regard, the project team assessed the Year 2000 risk to the RTA, while a
separate test environment was set up to ensure Year 2000 compliance.
The date change from 1999 to 2000 had no impact on RTA operations or its financial result.

(109) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 110

NOTES (continued)
Roads & Traffic Authority as at 30 June 2000

24. BUDGET REVIEW

Net Cost of Services


The actual net cost of services was $1,343.112 million less than the budget principally due a higher level
of revenue than was included in the budget. This increase in revenue related to Sale of Goods and Services
($21.831 million), Grants & Contributions, including funding for natural disaster restoration works
($27.913 million) and Other Revenue ($1,710.577 million). The Other Revenue included an amount of
$1,693.981 million to recognise the revaluation of infrastructure systems. This increase in revenue was in
part offset by an increase of $416.012 million in total expenses. This increase was principally due to an
increase in depreciation of $424.125 million mainly related to infrastructure systems which was not included
in the budget. In addition, Other Operating Expenses increased by $35.501 million. In contrast, finance costs
were $18.946 million lower than budget, with employee related costs also down by $38.255 million,
following an actuarial assessment of the RTA’s superannuation liability.
Assets and Liabilities
Net assets have increased by $3,095.796 million compared to budget. This is principally due to increases
in the values of Land & Buildings ($324.075 million) and Infrastructure Systems ($2,571.053 million).
These increases relate to revaluations and the impact of changes in depreciation policies in respect of
infrastructure assets which were not included in the budget. Other Non Current Assets which include the
recognition of the RTA’s right to receive private sector provided infrastructure is also $96.203 million higher
than the budget estimate.
In this regard, the 1999/2000 budget was prepared prior to the finalisation of 1998/99 financial statements.
As such, the changes in the land & buildings, infrastructure and private sector asset values as compared to
the budget take into account revaluations and other adjustments undertaken both at 30 June 1999 and
30 June 2000.
The change in net assets is also impacted by a decrease in total liabilities of $109.499 million compared to
the budget. This is principally due to a reduction in employee entitlements ($92.079 million) following an
actuarial assessment of the RTA’s superannuation liability.
Cash Flows
Net cash flow from operating activities is $47.985 million less than the budget primarily due an increase in
total payments ($117.907 million), offset by increases in cash flow from Government ($27.743 million) and
total receipts ($42.179 million).
Net cash outflow in relation to investing activities is $73.669 million less than the budget primarily due to lower
than expected purchases of land & buildings, plant & equipment and infrastructure systems ($65.686 million).
Net cash flow from financing activities is $6.049 million more than the budget primarily due to lower than
expected repayments of borrowings and advances ($6.049 million).
A variance of $26.536 million in respect of the opening cash as compared to the budget has occurred due to
the fact that the 1999/2000 budget was prepared prior to the finalisation of 1998/99 financial statements.

(110) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 111

NOTES (continued)
Roads & Traffic Authority as at 30 June 2000

25. CASH AND CASH EQUIVALENTS

For the purposes of the Cash Flow Statement, cash includes cash on hand, cash at bank and cash equivalents
in the form of investments in accordance with the definition of “cash equivalents” in AAS28.

1999/2000 1998/1999
$M $M

RTA Operating Account 16.427 4.161


Remitting Account, Cash in Transit & Cash on Hand 24.907 18.657
Cash Equivalents (Investments) 4.436 4.219
45.770 27.037

26. RECONCILIATION OF NET COST OF SERVICES


TO NET CASH FLOWS FROM OPERATING ACTIVITIES
1999/2000 1998/1999
$M $M

Net Cash used on Operating Activities (795.625) (769.639)


Depreciation 443.098 124.213
Revaluation of Infrastructure (1,693.981) (1,550.492)
Increase in Provisions and Entitlements (95.268) 21.886
Rent Revenue in respect of M4 and M5 Motorways (3.108) (3.108)
Value of Emerging Interest of Private Sector Provided Infrastructure (43.657) (23.784)
ERS payments utilised to redeem current principal portion
of bonds issued to Private Sector (10.131) (9.502)
Increase in Payables and Other Liabilities (10.703) (19.845)
Decrease in Receivables and Other Assets (7.560) 0.431
(Profit)/Loss on Sale of Assets (0.783) 1.298
Contributions from Government 1,895.615 1,846.080
Net Cost of Services (322.103) (382.462)

END OF AUDITED FINANCIAL STATEMENTS

(111) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 112

SUPPLEMENTARY FINANCIAL INFORMATION


Roads & Traffic Authority as at 30 June 2000

THE YEAR IN BRIEF – 1999/2000


Initial
Budget Actual
$M $M

New Funds Available


Commonwealth
National Highway 211 210
Roads of National Importance 78 85
Australian Transport Safety Bureau – Blackspots Program 12 18
Other 9 13
Total Commonwealth 310 326

State
Motor Vehicle Taxes 709 728
Fuel Levies/Excise 636 616
Untied – Commonwealth Road Funds 124 124
M4/M5 Cashback Scheme 35 35
Other Consolidated Revenue 54 67
RTA Revenue 218 285
Total State 1,776 1,855

Total New Funds 2,086 2,181

Use of Cash Balances 13 (18)

2,099 2,163

Use of Come and Go Facility 110 110


Increase in Liabilities/Reduction in Operational Assets 56 (97)
Total Funds Utilised 2,265 2,176

Expenditure
Road Network Infrastructure
– Network Development 969 933
– Infrastructure Maintenance 578 563
Traffic & Transport 225 213
Road Safety & Road User Management 333 327
Debt Servicing & Repayment 120 100
M4/M5 Cashback 35 36
Voluntary Redundancies 5 4
Total Expenditure 2,265 2,176

(112) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 113

SUPPLEMENTARY FINANCIAL INFORMATION (continued)


Roads & Traffic Authority as at 30 June 2000

1999/2000 BUDGET

Funds budgeted to be available to the Roads and Traffic Authority for 1999/2000 as published in State
Budget Paper No. 3 amounted to $2,265 million. Variations to the initial budget were as follows:

$M $M

Total Initial Budget 2,265

Increase in Receipts
Commonwealth Funds – RONI’s & ATSB Blackspot Program 21
Motor Vehicle Taxation 15
General Consolidated Revenue 11
Authority Revenue 36 83
2,348
Less:
Decrease in Receipts
Commonwealth Funds – National Highways 5
Fuel Levies/Excise 20 25
2,323
Less:
Decrease in Balance Sheet Movements 3
Decrease in use of Cash Balances 9
Total Revised Budget 2,311

Total funds available for 1999/2000 amounted to $2,311 million and variances from
the revised budget were as follows:
$M $M

Total Revised Budget 2,311

Increase in Receipts
Commonwealth Funds – National Highways 4
Motor Vehicle Tax 4
Authority Revenue 32
General Consolidated Revenue 4 44
2,355
Less:
Decrease in Receipts
Commonwealth Funds – ATSB Blackspots Program & Interstate
Vehicle Registration Scheme 8 8
2,347
Less:
Decrease in Balance Sheet Movements 150
Decrease in use of Cash Balances 21
Actual Total Funds Available 2,176

The most significant variations between the revised budget and actual funds available were due to:
– an increase in Authority Revenue particularly for Plate Fees, Minor User Charges and Right to Receive Private
Sector Infrastructure revenue; offset by
– a reduction in Commonwealth Grants provided to the Australian Transport Safety Bureau Blackspots
Program and the Interstate Vehicle Registration Scheme; and
– decreases in the use of cash balances and the funds derived from balance sheet movements. The decrease
in balance sheet movements primarily relates to an actuarial adjustment to the liability for unfunded
superannuation.

(113) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 114

SUPPLEMENTARY FINANCIAL INFORMATION (continued)


Roads & Traffic Authority as at 30 June 2000

Figure 14 – Funding of the State Road Network COMMONWEALTH GRANTS


(Constant Dollar 1999/2000 terms)
Australian Land Transport Development Act, 1988
$ Million

2000
Under funding arrangements introduced in 1994, the Commonwealth
responsibility for the funding of roads is confined to the construction
and maintenance of National Highways.
During 1999/2000 the RTA received $228.8 million, including
$18.3 million for the Road Safety Blackspots Program, under the
1500 provisions of the Australian Land Transport Development Act, 1988
(1998/99; $251.4 million).
Roads of National Importance
In the 1996/97 Federal Budget, it was formally announced that a new
Federally funded road transport category was to be established to cater
for Roads of National Importance.
1000
During 1999/2000 the Authority received $85.3 million for roads under
this category (1998/99; $68 million).
Interstate Road Transport Act, 1985
The Interstate Road Transport Act, 1985 enables heavy vehicles to have
Federal registration if they are not registered in a State or Territory and
500 are involved only in interstate trade.
Under the Federal Scheme vehicle owners are required to pay either a
flat rate or a charge based on distance travelled. The moneys are
collected in NSW by the RTA on behalf of the Commonwealth and paid
into the Interstate Road Transport Trust Fund. The proceeds are then
distributed to the States as a contribution towards road repair and
maintenance costs.
1990/91

1991/92

1992/93

1993/94

1994/95

1995/96

1996/97

1997/98

1998/99

1999/00

Funds received by the RTA under this scheme during 1999/2000


amounted to $12.5 million (1998/99; $6.2 million).

State Commonwealth

Figure 15 – Commonwealth Grants per registered vehicle Figure 16 – Commonwealth Grants


(Constant Dollar 1999/2000 terms) (Constant Dollar 1999/2000 terms)
$ Million
$ Million

250 500

400

200

300

150

200

100
100

0
1990/91

1991/92

1992/93

1993/94

1994/95

1995/96

1996/97

1997/98

1998/99

1999/00
1990/91

1991/92

1992/93

1993/94

1994/95

1995/96

1996/97

1997/98

1998/99

1999/00

50

National Roads Arterial & Other Roads

(114) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 115

SUPPLEMENTARY FINANCIAL INFORMATION (continued)


Roads & Traffic Authority as at 30 June 2000

STATE SOURCES

Fuel Levies/Excise During 1999/2000, $341.6 million (1998/99 – $344 million)


On 5 August 1997, the High Court handed down a decision on two was dedicated to the general Roads program and $273.9 million
challenges to franchise fees on tobacco, effectively stopping the States (1998/99 – $276 million) was used to fund the 3x3 Program.
from levying business franchise licence fees, including the fees applied In order to continue the funding arrangements for the 3x3 Program
to petroleum products. following the High Court decision, the Road Improvement (Special
From 6 August 1997, the Commonwealth introduced a fuel excise Funding) Amendment Act, 1998 was passed during 1998/99 which
surcharge of 8.1 cents per litre, nation wide, in order to place the provided for an annual standing appropriation to be made out of
States in a revenue position that was no worse than existed prior to the Consolidated Funds for the funding of road improvement, road safety
High Court decision. and road related public transport infrastructure authorised by the
program. The amount appropriated was equal to 44.5 percent
Some of the revenue from the fuel excise surcharge is paid to NSW. of the revenue collected by the Commonwealth and was paid to the
The RTA in 1999/2000 received $615.6 million from the fuel excise States less subsidies paid by the State under the scheme to match
surcharge paid to NSW. The amount paid to the RTA excludes rebates interstate petroleum prices in certain border areas and under the off-
and subsidies for certain border areas and the off road diesel scheme, road diesel scheme.
which were paid out by State Treasury prior to the net funds being
passed on to the RTA.

1999/2000 3X3 PROGRAM


– Financial Report for Period 1/7/99 to 30/6/2000
Total
1999/2000
$M

(A) Income
Fuel Levies 273.929
Interest Earned 1.072
Total Income 275.001

(B) Approved Expenditure


Development 172.718
Rehabilitation 44.499
Council Determined 14.993
Public Transport Infrastructure 28.074
Traffic & Safety 14.717
Total Expenditure 275.001

(115) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 116

SUPPLEMENTARY FINANCIAL INFORMATION (continued)


Roads & Traffic Authority as at 30 June 2000

Motor Vehicle Taxation Untied Commonwealth Road Grants


Motor vehicle taxation, collected by the RTA when vehicles are Since 1990/91, Commonwealth road funds have been provided to
registered, is hypothecated to the Roads Program. During 1999/2000 the States under the Australian Land Transport Development program.
receipts from motor vehicle taxation totalled $728.1 million (1998/99; However, the Commonwealth decided that funds previously allocated
$698.2 million). for the State’s arterial roads were to be untied from 1 January 1994
and were to be provided to the States under the heading of “Identified
Number of Registered Motor Vehicles in NSW
Roads Grants within the General Revenue Assistance to the States”.
Number of % Change The basis of the distribution of these funds to the States has been
Motor Over transitioned from the proportions issued in 1993/94 to the proportions
Vehicles Previous utilised in 1999/2000, when the untied funding was fully distributed in
Year Registered* Year accordance with the Financial Assistance Grants (FAGs) formula.
The Commonwealth Government untied road funding to NSW for
1987/88 3,102,709 2.5(+)
1999/2000 was $124.3 million (1998/99; $118.3 million).
1988/89 3,147,232 1.4(+)
1989/90 3,227,798 2.5(+)
1990/91 3,246,703 0.6(+)
1991/92 3,234,814 0.4(–)
1992/93 3,199,756 1.1(–)
1993/94 3,290,594 2.8(+)
1994/95 3,311,402 0.6(+)
1995/96 3,367,092 1.7(+)
1996/97 3,421,409 1.6(+)
1997/98 3,493,340 2.1(+)
1998/99 3,535,732 1.2(+)
1999/2000 3,636,353 2.8(+)

* Excluding plant, tractors, trailers and caravans


1992/93–1999/2000 figures exclude vehicles on register without current
registration

Contributions for Specific Works


The following contributions towards specific works were received
during 1999/2000:
$M

State Government Departments for


– General Purposes 7.019
– Sydney Harbour Bridge 2.783
Councils 1.133
Private Firms and Individuals 6.963
17.898

(116) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 117

SUPPLEMENTARY FINANCIAL INFORMATION (continued)


Roads & Traffic Authority as at 30 June 2000

ROAD COST INDEX PAYMENTS TO COUNCILS

The Authority's Road Cost Index, which is used to adjust money values
Payments made to local government councils during 1999/2000 were
in various tables and graphs within this Annual Report, is shown in the
as follows:
table 'Roads and Traffic Authority Road Cost Index'.
$M $M
The index, which has been specially developed by the RTA, is widely
accepted as a measure of change in the cost of roadworks, bridgeworks Classified Roads
and traffic facilities. It is based upon changes in prices of samples – Development 29.923
within the broad elements of wages, stores, plant, haulage, corporate – Maintenance 203.250
and regional administration, property acquisitions and financing costs. – Vehicle Management 0.490
Each index component has been allocated a predetermined weighting – Road Safety 15.445
which is reviewed at 3 to 4 yearly intervals to adjust for changes in the – Traffic Management 33.052 282.160
proportions used in RTA roadwork activities. Local Roads
Roads and Traffic Authority Road Cost Index – Natural Disasters 29.889
(Base Year – 1996/97) 312.049
% Increase/
(Decrease)
Over Previous ADMINISTERED REVENUES – COLLECTIONS
Year Index Year
The RTA administers, but does not control, the collection of various
1989/90 84.03 6.5
fees, fines and levies on behalf of the Crown Transactions Entity.
1990/91 90.63 7.9
Monies collected on behalf of the Crown Transactions Entity are
1991/92 92.90 2.5
not recognised as the RTA’s revenues.
1992/93 91.07 (2.0)
1993/94 90.89 (0.2) The RTA’s Administered Revenue Collections are as follows:
1994/95 92.62 1.9 1998/99 1999/2000
1995/96 97.36 5.1 $M $M
1996/97 100.00 2.7
1997/98 102.50 2.5 Consolidated Fund Receipts
1998/99 107.00 4.4 Vehicle Registration Fees 157.929 160.481
1999/2000 107.40 0.4 Drivers Licence Fees 78.495 127.854
Vehicle Transfer Fees 28.587 29.707
Other Fees & Charges 18.963 20.213
Registration Levy 7.914 2.174
TOTAL 291.888 340.429

Collection – Other Authorities


Transcover Levy 110.576 32.429
Stamp Duty 451.841 470.353
Interstate Road Transport
Scheme Receipt 3.641 4.047
Firearms Licence Fees 1.443 1.896
Security Licence Fees 3.748 0.009
Proof of Age – 0.491
Other Fees & Charges 0.009 0.008
TOTAL 571.258 509.233

(117) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 118

SUPPLEMENTARY FINANCIAL INFORMATION (continued)


Roads & Traffic Authority as at 30 June 2000

THE YEAR AHEAD

2000/2001
Budget
$M

New Funds Available


Commonwealth
ALTD Act 216
Roads of National Importance 94
Australian Transport Safety Bureau Blackspots Program 13
Other 9
Total Commonwealth 332

State
Motor Vehicle Taxes 756
Fuel Levies/Excise 656
Untied Road Funds 127
M4/M5 Cashback Scheme 44
Other Consolidated Revenue 5
RTA Revenue 225
Total State 1,813

Total New Funds 2,145

Use of Cash Balances 0

2,145

Use of Come & Go Facility 40


Increase in Liabilities/Reduction in Operational Assets 15
Total Funds Utilised 2,200

Expenditure
Road Network Infrastructure
– Network Development 885
– Infrastructure Maintenance 576
Traffic & Transport 225
Road Safety & Road User Management 341
Debt Servicing & Repayment 122
M4/M5 Cashback 44
Voluntary Redundancies 7
Total Expenditure 2,200

(118) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 2:06 PM Page 119

APPENDICES 120 Appendix 1, Major Works – Sydney


124 Appendix 2, Review of Environmental Issues
Relating to the Eastern Distributor
127 Appendix 3, Major Projects – Country
138 Appendix 4, Heritage and Conservation Register
154 Appendix 5, Species Recovery
158 Appendix 6, Advisory Bodies
160 Appendix 7, Senior Executive Performance
Statements (Level 5 and Above)
163 Appendix 8, Internal Audit
164 Appendix 9, Risk Management
166 Appendix 10, Staffing
170 Appendix 11, Overseas Visits by RTA Officers
171 Appendix 12, Freedom of Information
177 Appendix 13, Legal Change
178 Appendix 14, Land Disposal
179 Appendix 15, Year 2000 Millennium Bug Control
179 Appendix 16, Publications
181 Appendix 17, Details of Payments to Consultants
182 Appendix 18, Account Payment Performance
182 Appendix 19, Funds Granted to Non-Government
Community Organisations
183 Appendix 20, Driver and Vehicle Statistics and
Heavy Vehicle Infringements

(119) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 120

APPENDIX 1
Major Works – Sydney

(3x3) denotes projects partly or wholly funded by the 3x3 fuel levy

EASTERN DISTRIBUTOR Fairford Road to King Georges Road


Estimated Cost: $685.0M Estimated Cost: $40.0M
Cost to Date: Net cost to RTA limited to $20.0M, remaining Cost to Date: $3.1M (RTA cost)
costs to private sector. 1999/2000: $1.6M
1999/2000 (RTA): $10.0M Completed: September 1999
Completed: December 1999
Duplication between King Georges Road, Beverly Hills and Fairford
The Eastern Distributor is being financed, designed, constructed, Road, Padstow is designed, financed and constructed by the Motorway
operated and maintained as a private toll road to provide a high quality operator, Interlink Roads Pty Ltd. It provides four lanes and new, east
link between the Cahill Expressway at Woolloomooloo and Botany facing on-load ramps at The River Road and Fairford Road.
Road at Mascot. Construction started in August 1997. A Landbridge
linking the grounds of the Art Gallery with the Domain and Botanic OLD WINDSOR ROAD/WINDSOR ROAD
Gardens was completed in December 1998. The Eastern Distributor Estimated Cost: $76.0M (RTA costs)
was opened in December 1999. The William Street ramps were opened Cost to Date: $38.1M
in July 2000. 1999/2000: $12.7M
Estimated Completion: 2003
SOUTHERN CROSS DRIVE
Upgrading of Old Windsor Road and Windsor Road between Seven
Estimated Cost: $11.0M
Hills Road and Schofields Road, Rouse Hill, to provide a four-lane
Cost to Date: $9.2M
divided road with provision for future transitway. Construction started
1999/2000: $3.4M
March 1997.
Completed: December 1999
The widening of the existing road from four to six lanes between STACEY STREET EXTENSION, BANKSTOWN
Link Road, Rosebery and Botany Road, Botany was opened to traffic Estimated Cost: $18.9M
in December 1999. A cycleway is to be constructed along Wentworth Cost to Date: $17.4M
Avenue and local streets. 1999/2000: $1.6M
Completed: September 1999
CITY WEST LINK ROAD SECTION 3
Construction of a four-lane link road between Rookwood Road
Balmain Road to Boomerang Street
and Hume Highway at Stacey Street intersection. Open to traffic
Estimated Cost: $50.7M
in June 1999.
Cost to Date: $46.5M
1999/2000: $15.3M CUMBERLAND HIGHWAY
Completed: July 2000 Estimated Cost: $30.0M
The City West Link connects the Glebe Island Arterial with Parramatta Cost to Date: $11.0M
Road at Five Dock. The section from Balmain Road to Boomerang 1999/2000: $8.5M
Street was opened to traffic in June 2000. Estimated Completion: 2002
Widen to six lanes with central median and turn lanes from Merrylands
M4 MOTORWAY
Road to The Horsley Drive. The first stage from Merrylands Road to
M4 Granville Viaduct
Canal Road was opened to traffic in December 1999.
Estimated Cost: $9.0M
Cost to Date: $7.1M HEATHCOTE ROAD
1999/2000: $5.6M Estimated Cost: $11.5M
Estimated Completion: 2001 Cost to date: $11.1M
Noise walls in conjunction with linemarking to provide six lanes were 1999/2000: $5.6M
completed in May 2000. Completed: July 2000
Road widening to four lanes between Infantry Parade and Nuwarra
M5 MOTORWAY
Road, Holsworthy was opened to traffic in July 2000.
M5 East
Estimated Cost: $784.0M
Cost to Date: $382.5M
1999/2000: $223.0M
Estimated Completion: 2002
A four-lane motorway from General Holmes Drive, south of Sydney
Airport to King Georges Road, Beverly Hills. Construction commenced
February 1999.

(120) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 121

APPENDIX 1 (Continued)
Major Works – Sydney

WORONORA BRIDGE COWPASTURE ROAD


Estimated Cost: $47.0M The Horsley Drive to Elizabeth Drive,
Cost to Date: $29.2M Estimated Cost: $25.4M
1999/2000: $19.6M Cost to Date: $20.9M
Estimated Completion: December 2000 1999/2000: $4.9M
Estimated Completion: February 2001
Construction of a new bridge and approaches commenced
January 1999. Widening to four-lane divided road. Section from Elizabeth Drive to
Edensor Road opened to traffic February 1997. Section from Edensor
LINDEN STREET, SUTHERLAND Road to Prairie Vale Road was opened to traffic in August 1999. Section
Estimated Cost: $8.5M from Prairie Vale Road to Restwell Road was opened to traffic in
Cost to Date: $0.8M December 1998. Section Restwell Road to The Horsley Drive opened to
1999/2000: $0.7M traffic in March 2000.
Estimated Completion: December 2000
CAMDEN VALLEY WAY
Widen to a four-lane divided road to match the capacity of the
Final Cost: $7.4M
adjacent Woronora Bridge.
1999/2000: $2.1M
TRANSITWAY Completed: December 1999
Liverpool to Parramatta A new intersection to link Cowpasture Road deviation to Camden
Estimated Cost: $203.0M Valley Way was opened to traffic in October 1999.
Cost to Date: $38.2M
1999/2000: $21.6M CAMPBELLTOWN ROAD
Estimated Completion: 2003/04 Final Cost: $12.6M
1999/2000: $1.8M
Construction of a new, rapid and substantially exclusive busway
Completed: September 1999
transport system, linking Liverpool to Parramatta, via Wetherill Park.
Widening to four-lane divide road from Rudd Road to Blaxland Road,
WESTERN SYDNEY ORBITAL Campbelltown, including replacement of Morgans Gate railway bridge
Estimated Cost: $1,200.0M (Year 2000$) with new twin bridges. Queen Street intersection and new southbound
Cost to Date: $53.5M bridge completed April 1998.
1999/2000: $12.5M
Estimated Completion: Not programmed THE NORTHERN ROAD
Estimated Cost: $5.3M
Proposed construction of a National Highway from the M5 at Prestons
Cost to date: $5.1M
to the M2 at West Baulkham Hills. Land was acquired in the road
1999/2000: $4.5M
corridor and environmental assessments are well advanced. Progress
Completed: July 2000
depends on funding from the Federal Government.
Upgrade to a four-lane undivided road between the M4 Motorway and
ELIZABETH DRIVE Smith Street, Penrith. Improves traffic flow on an Olympic route and
Estimated Cost: $27.0M local access.
Cost to Date: $25.5M
1999/2000: $7.1M CASTLEREAGH ROAD
Estimated Completion: August 2000 Estimated Cost: $26.0M
Cost to Date: $25.0M
Upgrading between Brown Road and Cowpasture Road, Bonnyrigg to
1999/2000: $11.7M
provide two lanes in each direction. New travel lanes were opened to
Estimated Completion: September 2000
traffic in December 1999.
Reconstruction and widening to four-lane divided road from Jane Street
THE HORSLEY DRIVE to New McCarthys Lane, Penrith. An important link between Penrith,
Carramar Railway Bridge Richmond and Windsor and an access route to the Olympic rowing
Estimated Cost: $20.0M venue at Penrith. This work was opened to traffic in August 2000.
Cost to Date: $13.1M
1999/2000: $9.0M
Estimated Completion: October 2000
Construction of a new bridge over railway line.

(121) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 122

APPENDIX 1 (Continued)
Major Works – Sydney

HAWKESBURY/NEPEAN FLOOD PLAIN MANAGEMENT STRATEGY CASTLEREAGH ROAD


Londonderry Road Final Cost: $2.1M
Final Cost: $5.7M Completed: January 2000
1999/2000: $5.2M Pavement rehabilitation and shoulder strengthening from
Completed: July 1999 Andrews Road to Sheens Lane
Flood evacuation route upgrade to ensure safe evacuation from
Richmond. PORT HACKING ROAD
Final Cost: $1.6M
GREAT WESTERN HIGHWAY Completed: March 2000
Blaxland to Valley Heights Asphalt resurfacing from the Princes Highway to The Boulevarde
Cost to Date: $55.5M
1999/2000: $1.8M STONEY CREEK ROAD
Completed: September 1999 Final Cost: $1.7M
Widening and reconstruction of a 5 km section to provide a four-lane Completed: July 2000
divided road. Includes grade separated interchange at Railway Parade, Pavement rehabilitation from Croydon Road to King Georges Road.
service roads and new pedestrian bridges at Warrimoo and Valley
Heights stations. Opened to traffic as four lanes October 1998. SYDNEY NEWCASTLE FREEWAY ROCK STABILISATION
Faulconbridge Wahroonga to Brooklyn
Estimated Cost: $25.0M Estimated Cost: $24.3M
Cost to Date: $12.6M Cost to Date: $18.9M
1999/2000: $7.8M 1999/2000: $5.4M
Estimated Completion: August 2001 Estimated Completion: 2001

Reconstruction and widening to four-lane divided road between Maintenance of sandstone cuttings along Sydney–Newcastle Freeway
Grose Road and Parkes Crescent, including transport interchange to minimise risk to traffic.
at railway station.
SYDNEY HARBOUR BRIDGE NORTHERN APPROACH PAINTING
Linden Estimated Cost: $24.6M
Estimated Cost: $28.7M Cost to date: $24.1M
Cost to Date: $4.5M 1999/2000: $2.8M
1999/2000: $4.1M Completed: December 1999
Estimated Completion: 2002
First major repaint of the northern approach to Sydney Harbour Bridge
Widening to four-lane divided road between Weemala Avenue and in over 20 years.
Tollgate Drive including a duplicate bridge over the railway.

CENTENARY DRIVE
Final Cost: $1.8M
Completed: June 2000
Pavement rehabilitation from Arthur Street to Weeroona Road.

(122) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 123

APPENDIX 1 (Continued)
Major Works – Sydney

TRAFFIC MANAGEMENT BICYCLES

COMPLETED IN 1999/2000 COMPLETED IN 1999/2000

Transport Management Centre (3x3) Meadowbank Railway Bridge


Estimated Cost: $34.7M (for building and major associated Estimated Cost: $1.1M
technical systems) Cost to Date: $1.1M
Cost to Date: $34.9M 1999/2000: $0.4M
1999/2000: $6.7M Completed: April 2000
Opened: September 1999
Conversion of a disused heritage railway bridge for pedestrian and
The Transport Management Centre manages and co-ordinates activities cyclist access across Parramatta River between Meadowbank and
on the NSW road network. Key services include traffic management of Rhodes. Conversion works commenced in 1998/99.
incidents, traffic information and network and system operations.
ANZAC Bridge Bicycle and Pedestrian Path
Eastern Distributor Bus Priority Works (3x3) Estimated Cost: $2.0M
Estimated Cost: $6.0M Cost to Date: $2.0M
Cost to Date: $2.7M 1999/2000: $2.0M
1999/2000: $0.4M Completed: June 2000
Completed: June 2000
A new 450m combined pedestrian/cycle path on the ANZAC Bridge
Improvements at key intersections along Anzac Parade and traffic provides a safer and more direct route from Victoria Road to the
management initiatives in Flinders, Oxford and William Streets, to ANZAC Bridge.
improve priority for buses.

CONTINUING IN 2000/01 CONTINUING IN 2000/01

M4 Electronic Incident Management System Parramatta to Liverpool Rail Trail Cycleway


Estimated Cost: $12.0M Estimated Cost: $5.0M
Cost to Date: $10.7M Cost to Date: $4.0M
1999/2000: $3.3M 1999/2000: $3.5M
Estimated Completion: June 2001 Estimated Completion: October 2000
This project includes the development and installation of an automatic A 17 km cycleway between Parramatta and Liverpool, along the rail
traffic data monitoring system, variable speed limit signs, an incident corridor, to provide quick access for cyclists to local and regional
detection system, a number of variable message signs, and a network centres. The rail trail is part of the network of cycleways planned for
communications system with fibre optic cables to the Transport Sydney as described in the State Government’s document Action for
Management Centre. Bikes – BikePlan 2010.

The Horsley Drive, Cowpasture Road and Elizabeth Drive


Estimated Cost: $2.0M
Cost to Date: $0.9M
1999/2000: $0.9M
Estimated Completion: January 2001
A 7.5km off-road cycle and pedestrian path along The Horsley Drive,
Cowpasture Road and Elizabeth Drive will improve the safety for cyclists
and pedestrians in the local area and will also benefit students who
attend Bonnyrigg and Bossley Park High Schools.

M5 MOTORWAY
Bexley to Mascot Cycleway
Estimated Cost: $8.0M
Cost to Date: $1.8M
1999/2000: $1.3M
Estimated Completion: 2002
An off-road cycleway adjacent to the M5 Motorway corridor, being
delivered as part of the extensive bike network outlined in Action for
Bikes – BikePlan 2010.

(123) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 124

APPENDIX 2
Review of Environmental Issues Relating to the Eastern Distributor

The Centennial Park and Moore Park Trust Amendment (Eastern Distributor)
KEY FINDINGS OF THE 1999/2000 REVIEW
Act 1997 requires the Minister for Roads to appoint a community
consultative committee for the Eastern Distributor. The Act also requires
1. Statutory Requirements
the RTA to conduct an annual review of environmental issues relating
Stage 1 of the Eastern Distributor was completed and the Motorway
to the project.
was opened to traffic on 19 December 1999.
The Eastern Distributor Community Consultative Committee was
Stage 2 of the Eastern Distributor comprised the northbound off ramp
appointed in July 1998 and held its first meeting on 6 August 1998.
to William Street including a Toll Plaza between William Street and
The 10-member committee included representatives from the Royal
Stanley Street and a southbound on-ramp from Bourke Street just
Botanic Gardens and Domain Trust, Art Gallery of NSW Trust,
north of William Street. Work on completion of Stage 2 of the Eastern
Centennial Park and Moore Park Trust (CPMPT), and Randwick City
Distributor has continued and these ramps were opened to traffic on
Council, Sydney and South Sydney Councils. There were also two
23 July 2000.
business and two community representatives.
Measures undertaken to satisfy the Minister for Urban Affairs and
In June 2000 the RTA engaged PPK Environment and Infrastructure P/L
Planning approval and Environment Protection Authority licence
to review environmental matters associated with the Eastern Distributor
conditions in relation to noise and vibration, air quality and dust, water
from 1 July 1999 to 30 June 2000. The company was also engaged to
quality, groundwater and settlement and flora and fauna are detailed in
conduct the previous reviews from the start of construction to 30 June
Leighton Contractors’ Environmental Management Plan.
1998 and for the year 1998/1999. The 1999/2000 review by PPK
Environment and Infrastructure P/L forms the basis of this report. The 1999/2000 Review has assessed compliance with the statutory
requirements and it is considered that the requirements have generally
The review assessed the effectiveness of environmental management,
been satisfied during the 12 months to June 2000 and in some cases
including Airport Motorway Limited/Leighton Contractors Pty Ltd’s
the RTA, Airport Motorway Ltd (AML) and Leighton Contractors have
environmental management plan. It assessed compliance with
undertaken activities that have exceeded these requirements.
conditions set by the Minister for Urban Affairs and Planning. It also
highlighted areas of positive environmental management as well as Some generally minor issues need to be addressed to fully satisfy the
areas of concern, and made recommendations to address the latter. requirements.
The measures used to assess environmental performance included The following conditions relating to operational components of the
transparency of process; effective communication and responsiveness; development consent require ongoing monitoring and review:
environmental management and monitoring; and meeting statutory – Maintenance of Landscape Works (Condition No. 48);
requirements.
– Compliance with Operational Air Quality Management
Consultation took place with the Environment Protection Authority Procedure (Condition No. 92).
(EPA) and the Eastern Distributor Community Consultative Committee,
government agencies (such as the Department of Land and Water
Conservation) and interested parties such as consultants engaged by 2. Environmental Management and Monitoring
the RTA and Leighton Contractors for the project, local councils, The statutory requirements for the construction of the Eastern
business and community groups, to identify issues for the review to Distributor have been expressed as commitments within AML/Leighton
consider. Contractors’ Environmental Management Plan. The Environmental
Environmental issues raised by these groups have been in the areas of Management Plan was amended during the previous review period and
community interest and involvement, urban design, impacts on local these amendments simplified the plan. The plan is supported by a set
traffic and pedestrian safety. of procedures that contain more detailed controls, measures and
monitoring requirements for environmental management.
Copies of the complete report on the review of environmental issues,
including the report prepared by PPK Environment and Infrastructure An Operational Environmental Management Plan was prepared in the
and the submission by the Eastern Distributor Community Consultative last 12 month period and was approved by the Minister for Urban
Committee, are available for reference at the RTA Corporate Office Affairs and Planning on the 17 December 1999. The Operational
(Surry Hills) and the RTA Client Services Directorate (Blacktown). Environmental Management Plan details how AML will maintain and
operate the Motorway to achieve compliance with the conditions of
development consent from the Minister for Urban Affairs and Planning.
The main issue during the construction of the Eastern Distributor has
been the impact of construction noise and disruption caused to the
local community. During the last 12 month period it is considered that
in respect of noise and vibration issues AML/Leighton Contractors have
responded fairly and reasonably to regenerated noise and vibration
issues raised by local residents. There has been a considerable decrease
in noise impacts, evidenced by a significant decrease in the number of
complaints, received to the complaints hotline.
The 2000 Review concludes that AML/Leighton Contractors’ actions
have been undertaken in accordance with the commitments set out in
the Environmental Management Plan

(124) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 125

APPENDIX 2 (Continued)
Review of Environmental Issues Relating to the Eastern Distributor

3. Transparency of Process
The 2000 Review has found that reporting is generally being KEY ISSUES AND RECOMMENDATIONS OF THE REVIEW AND
completed in accordance with the Minister for Urban Affairs and RTA RESPONSE
Planning’s approval and Environment Protection Authority licence The following key issues have been identified as requiring action arising
conditions and relevant exceedences are highlighted and preventative from the 1999/2000 Review of Environmental Issues for the Eastern
actions described. Distributor:
The level of reporting for this review period has generally been of ISSUE 1: COMMUNITY INTEREST AND INVOLVEMENT
reasonably high standard, however the reporting on the status of Feedback received on the annual review of the Eastern Distributor
conditions yet to be fulfilled or the implementation of plans in relation indicates that the community is generally very positive about the level
to urban design and landscaping could have been better. In particular, of community consultation that has been undertaken during the period
better communication regarding program and responsibilities for work of this project. The high level of community consultation engaged in
on the western side of South Dowling Street would have been the construction phase of the project is recommended for future road
desirable. related proposals of similar magnitude.
In regard to the reporting of community inquiries and complaints, it is Nevertheless, members of the community have expressed complaints
considered that the six monthly Environmental Report provides an that plans prepared with community consultation have not been
adequate summary of construction related complaints and inquiries. implemented in full to the satisfaction of the general community. In
future major projects more attention needs to be given to the
implementation of plans.
4. Effective Communication and Responsiveness
Both the RTA and Leighton Contractors have met and in some cases Recommendations:
exceeded the statutory requirements relating to community – That the range of consultation and communication activities
consultation. The issues raised in the 1998 and 1999 Reviews undertaken by the RTA and Leighton Contractors throughout the
suggesting a more pro-active approach to consultation have generally Eastern Distributor process be seen as an example of a thorough
been adopted throughout the three year construction period. consultation process. In previous reviews activities were identified that
required further attention and future major projects of this nature
The 2000 Review has found that generally the community has felt that
should address these issues, in particular any noisy construction
the consultation approach introduced for the Eastern Distributor
activities and how to minimise inconvenience to the local community,
process, both pre-construction and during construction has exceeded
when to notify about local traffic changes and how, and how best to
the requirements of the conditions of development consent. It is
communicate the process and issues to the local community.
considered that the RTA and Leighton Contractors have undertaken a
high level of community consultation in regard to the preparation of all – Provisions need to remain for community feedback on operational
plans as required under conditions of development consent. issues, such as the introduction of local area improvement plan
initiatives, the implementation of urban design and landscaping
Now that construction activities have ceased, all plans developed after
elements and the restoration of affected properties. It is recommended
community consultation have been implemented (with the exception
that the complaints hotline be continued until all works associated with
of the Integrated Transport Strategy for servicing major events in the
the Eastern Distributor and the local area improvement plan are
Moore Park area). This review has found that the level of information
completed.
provided to the community regarding the development of detailed
plans was above expectations. However, it appears that information – Information on the implementation status of various local area
regarding the implementation status of some small parts of various improvement programs and other urban design plans should be
plans prepared or reasons why components of these plan/s have not updated regularly on the project website.
been implemented, for example the Urban Design Plan or the Response:
Landscaping Plan for the South Dowling Street footpath, was not made – The RTA will continue to improve its community consultation
available to the wider community. strategies and plans for future projects so that the community is
The extended length of time taken to resolve some issues in relation to kept informed regarding relevant issues through the development,
the restoration of affected property has been noted. Delay in the implementation and operational phases of this type of project.
settlement of these claims has been due not so much to a lack of – RTA and Council officers’ phone numbers will continue to be
responsiveness, but to the time taken to establish the reasons and available to the community until the project and the Local Area
responsibility for damage (eg the damage could have been pre- Improvement Program are completed.
existing) and negotiate settlement of the claims.

(125) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 126

APPENDIX 2 (Continued)
Review of Environmental Issues Relating to the Eastern Distributor

ISSUE 2: ENVIRONMENTAL MANAGEMENT ISSUE 4: URBAN DESIGN AND LANDSCAPING


That RTA continues to monitor and manage environmental matters in A number of minor issues remain outstanding in relation to the
accordance with the relevant conditions of approval stipulated by the implementation of urban design and landscaping initiatives after
Environment Protection Authority and the Minister for Urban Affairs the construction phase.
and Planning and the procedures contained in AML’s Operational Recommendation:
Environmental Management Plan. In addition the RTA is to monitor air – It is recommended that discrepancies in works undertaken from
quality impacts of the post-construction phase of the Motorway. that proposed within urban design and landscape plans should be
Overall it is considered that the proponent has adequately managed explained. Information should be made available to the public on
the environmental impacts of the construction stage of the Motorway. request, on what is implemental status of such plans. The same
Potential environmental impacts are expected to substantially decline in recommendations should apply to the overseeing of works proposed
the post construction phase. in the local area improvement programs.
Recommendation: Response:
– That the RTA continues to maintain and monitor the procedures – There have been some necessary changes within the scope of the
contained in AML’s Operational Environmental Management Plan. Master Plans during the detail design development. Stakeholders such
as the councils have been consulted and made aware of the reasons for
Response:
such changes. More emphasis will be put in future in providing the
– The RTA will continue to maintain and monitor the procedures
information.
contained in the AML’s Environmental Management Plan.

ISSUE 3: TRAFFIC MANAGEMENT


Remaining issues relating to traffic management yet to be resolved
need finalisation as soon as practicable. These include the full
implementation of Bus Priority Measures and the completion of the
Integrated Transport Plan for the Moore Park area.
Recommendation:
– The RTA facilitates the preparation of the Integrated Transport Plan
for the Moore Park area bringing together Rail Access Corporation,
Sydney Buses, Local Councils, Sydney Cricket Ground Trust, CPMPT
and Department of Transport.
– The finalisation of the Local Area Improvement Plan; and
implementation of Bus Priority Measures.
Response:
– The RTA is currently undertaking preparation of Traffic Management
Plans in conjunction with other agencies for events in the Moore Park
area. A draft Integrated Transport Management Plan has also been
prepared and will be finalised soon.
– Most of the Local Area Improvement Program has been
implemented. Measures impacting on traffic on local streets and
intrusive traffic have been completed. The final Local Area
Improvement Program is much bigger than originally envisaged
($6m vs $2m). The Bus Priority Measures agreed to by the Bus Priority
Task Force immediately with or following the opening of the Eastern
Distributor have been implemented.

(126) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 127

APPENDIX 3
Major Projects – Country

NEWCASTLE INNER CITY BYPASS


MAJOR PROJECTS – HUNTER
West Charlestown Bypass
Estimated Cost: $79.0M
F3 – SYDNEY TO NEWCASTLE FREEWAY
Cost to Date: $33.1M
North of Hawkesbury River
1999/2000: $10.0M
Final Cost: $4.2M
Estimated Completion: December 2002
1999/2000 $4.2M
Completed: May 2000 Construction of a western bypass as part of Newcastle Inner City
Bypass from Windale to Sandgate.
Pavement rehabilitation at various locations north of the Hawkesbury
River. THE ENTRANCE ROAD
Erina Heights
F3 Driver Aid Scheme – Wahroonga to Kariong
Final Cost: $2.4M
Estimated cost: $10.0M
1999/2000: $1.8M
Cost to date: $3.1
Completed: May 2000
Estimated completion: March 2002
Construction of a roundabout at Serpentine Road.
An electronic Driver Aid Scheme which includes variable message signs,
closed circuit television cameras, automatic incident detection and Erina
variable speed limit signs, is being progressed on the F3 Freeway Final Cost: $2.6M
between Wahroonga and Kariong. 1999/2000: $2.1M
Completed: February 2000
PACIFIC HIGHWAY
Lake Munmorah Construction of a roundabout at Carlton Road.
Final Cost: $1.2M MAIN ROAD, GLENDALE
1999/2000: $1.2M Estimated Cost: $5.1M
Completed: June 2000 Cost to Date: $4.2M
Pavement Rehabilitation – 300m northbound and 1.2 km southbound. 1999/2000: $3.8M
Estimated Completion: August 2000
NEW ENGLAND HIGHWAY
Rixs Creek Construction of dual carriageways and pavement rehabilitation from
Final Cost: $0.7M Sturt Street, Cardiff to Glendale Drive, Glendale, including widening of
1999/2000: $0.0M the Cardiff Subway overbridge.
Completed: August 1999 LAKE ROAD, ELERMORE VALE
Pavement rehabilitation 51.0 km north of Maitland. Estimated Cost: $3.5M
Cost to Date: $2.7M
Camberwell
1999/2000: $2.6M
Final Cost: $1.2M
Estimated Completion: September 2000
1999/2000: $0.5M
Completed: August 1999 Construction of dual carriageways between Reservoir Road and
Croudace Road, Elermore Vale.
Pavement rehabilitation 57.0 km north of Maitland.
MORPETH BRIDGE (Country Timber Bridge Program)
Muswellbrook
Final Cost: $2.4M
Final Cost: $0.9M
1999/2000: $0.9M
1999/2000: $0.3M
Completed: April 2000
Completed: August 1999
Major repairs to Morpeth Bridge to maintain this heritage listed bridge.
Pavement rehabilitation.
PORTERS CREEK BRIDGE
South of Muswellbrook
Estimated Cost: $0.5M (including RTA
Final Cost: $1.3M
contribution)
1999/2000: $1.2M
1999/2000: $0.1M
Completed: February 2000
Completed: July 2000
Improvements to the intersection of Pamger Drive and New England
Replacement of timber bridge and approaches to improve road
Highway.
capacity and safety.
CLARENCETOWN BRIDGE (Country Timber Bridge Program)
Final Cost: $2.4M
1999/2000: $0.9M
Completed: March 2000
Major truss repairs and strengthening to bridge over Williams River.

(127) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 128

APPENDIX 3 (Continued)
Major Projects – Country

JOHN RENSHAW DRIVE Gillenbah


Estimated Cost: $2.0M Final Cost: $1.7M
Cost to Date: $1.5M 1999/2000: $0.8M
1999/2000: $1.4M Completed: October 1999
Estimated Completion: October 2000
Pavement rehabilitation and intersection improvements south of
Eastbound overtaking lane to improve traffic flow and safety between Narrandera.
Kurri Kurri and Beresfield.
Near Narrandera
STEWART AVENUE Final Cost: $1.1M
Estimated Cost: $5.5M 1999/2000: $1.1M
Cost to Date: $3.6M Completed: April 2000
1999/2000: $3.1M
Pavement rehabilitation 9.9 to 12.5 km north of Narrandera.
Estimated Completion: July 2000
Near Grong Grong
New connection across the railway linking Stewart Avenue, Newcastle
Final Cost: $1.0M
West (Pacific Highway) with Hannell Street, Wickham, and thence to
1999/2000: $1.0M
the Newcastle waterfront dock and industrial areas.
Completed: December 1999
Pavement rehabilitation 36.9 to 39.3 km north of Narrandera.
MAJOR PROJECTS – SOUTH WESTERN
(3x3) denotes projects partly or wholly funded by the 3x3 fuel levy STURT HIGHWAY
Wagga Wagga
HUME HIGHWAY
Final cost: $0.8M
Bookham
1999/2000: $0.7M
Estimated Cost: $80.2M
Completed: October 1999
Cost to Date: $48.7M
1999/2000: $26.5M Construction of a new roundabout at the Kooringal Road intersection.
Estimated Completion: April 2001 Near Darlington Point
Construction of dual carriageways 19.0 to 39.0 km south of Yass, Estimated Cost: $2.7M
including a bypass of Bookham. Southern 4.0 km section opened to Cost to Date: $2.4M
traffic on 18 February 1998. 1999/2000: $2.4M
Estimated Completion: August 2000
Jugiong
Final Cost: $0.5M Pavement rehabilitation 46.0 to 49.0 km and 55.5 to 58.3 km west of
1999/2000: $0.5M Narrandera.
Completed: April 2000 Near Gum Creek
Concrete slab replacement 48.0 to 77.0 km south of Yass. Estimated Cost: $3.3M
Cost to Date: $2.9M
Gundagai
1999/2000: $2.9M
Final Cost: $11.1M
Estimated Completion: August 2000
1999/2000: $0.9M
Completed: September 1999 Pavement rehabilitation 89.9 to 94.3 km west of Narrandera.
Construction of a grade separated interchange at South Gundagai. Euston
Final cost: $1.8M
Albury
1999/2000: $1.0M
Estimated Cost: under review
Completed: December 1999
Cost to Date: $21.8M
1999/2000: $4.8M Construction of a new roundabout at the Murray Terrace intersection.
Estimated Completion: under review MID WESTERN HIGHWAY
Construction of 37.0 km of dual carriageways on the Albury/Wodonga Goolgowi
National Highway route in NSW is currently under review. Final cost: $0.7M
1999/2000: $0.7M
NEWELL HIGHWAY
Completed: February 2000
Near Colombo Creek
Final Cost: $1.6M Pavement rehabilitation from Goolgowi to 6.0 km east.
1999/2000: $1.6M
Completed: December 1999
Pavement rehabilitation 42.0 to 49.0 km and 64.5 to 65.7 km north of
Jerilderie.

(128) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 129

APPENDIX 3 (Continued)
Major Projects – Country

RIVERINA HIGHWAY OTHER WORKS


Finley
Estimated Cost: $1.2M Young to Boorowa Road
Cost to Date: $0.9M Estimated Cost: $1.2M
1999/2000: $0.9M Cost to Date: $0.7M
Estimated Completion: December 2000 1999/2000: $0.7M
Estimated Completion: December 2000
Pavement rehabilitation from Finley to 6.0 km east.
Initial sealing 14.5 to 24.2 km west of Boorowa.
COBB HIGHWAY
Jumping Sandhills to Mossgiel (3x3) Gundagai to Tumut Road (3x3)
Final Cost: $6.9M Estimated Cost: $1.3M
1999/2000: $1.1M Cost to Date: $1.3M
Completed: December 1999 1999/2000: $0.7M
Estimated Completion: July 2000
Reconstruction and sealing to provide all-weather access from Booligal
to Ivanhoe. Realignment of substandard curves on approaches to Gundagai in
conjunction with Hume Highway interchange works.
OLYMPIC HIGHWAY
Between Culcairn and Henty (3x3) Jingellic to Gilmore Road (3x3)
Final cost: $0.8M Estimated Cost: $0.7M
1999/2000: $0.8M Cost to Date: $0.6M
Completed: March 2000 1999/2000: $0.6M
Estimated Completion: August 2000
Pavement rehabilitation 6.0 to 7.0 km and 26.7 to 28.6 km north of
Culcairn. Pavement rehabilitation 32.0 to 35.0 km north of Tumbarumba.
Gerogery (3x3) Visy Pulp and Paper Mill – Tumut
Final cost: $2.9M Final Cost: $7.3M
1999/2000: $2.9M 1999/2000: $7.3M
Completed: March 2000 Completed: June 2000
Pavement rehabilitation from the Hume Highway intersection to Construction of a new 2.4 km access road from the Snowy Mountains
7.9 km north of Gerogery. Highway to the Visy development at Tumut.
BURLEY GRIFFIN WAY Yarrangobilly Caves Road
Illalong Creek (3x3) Final cost: $0.2M
Final Cost: $19.3M 1999/2000: $0.2M
1999/2000: $3.7M Completed: May 2000
Completed: November 1999 Pavement rehabilitation and drainage improvement to this tourist
Construction of a new deviation 15.0 km north west of Bowning. destination.
LACHLAN VALLEY WAY Murray River Crossings – Howlong (3x3)
North of Boorowa (3x3) Estimated Cost: $12.9M
Final cost: $0.8M Cost to Date: $7.7M
1999/2000: $0.8M 1999/2000: $1.9M
Completed: June 2000 Estimated Completion: March 2001
Pavement rehabilitation 9.0 to 13.0 km and 34.0 to 35.3 km north Replacement of deficient timber bridges over the Murray River and
of Boorowa. approaches at Howlong. Black Swan Lagoon Bridge completed in
July 1999.

(129) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 130

APPENDIX 3 (Continued)
Major Projects – Country

PACIFIC HIGHWAY UPGRADING PROGRAM


COMPLETED MAJOR PROJECTS
Pacific Highway – Hexham to NSW/Queensland Border
Bulahdelah to Coolongolook Freeway
On 25 January 1996 the Pacific Highway Upgrading Program Estimated cost: $203.5M
Agreement was signed by the then Federal Minister for Transport Final Cost: $140.0 M
and NSW Minister for Roads. This agreement confirmed the program 1999/2000: $17.7M
objectives and funding arrangements. Opened to Traffic: 24 October 1999
This important program aims to: Construction of 22.0 km dual carriageway Freeway between Bulahdelah
– Significantly reduce road accidents and injuries and Coolongolook eliminating at least sixty bends including the
notorious O’Sullivans Gap and Wootton Bends section, and improving
– Reduce travel times safety, motoring conditions and travel times.
– Reduce freight transport costs Taree Bypass
– Be responsive to the community in making key project decisions Estimated Cost: $125.0M
Cost to Date: $126.9M
– Manage the upgrading of the route in accordance with Ecologically 1999/2000: $10.0M
Sustainable Development principles Opened to Traffic: Final stage opened to traffic
– Maximise the effectiveness of expenditure. 12 April 2000
Final completion: May 2000
The NSW State Government will contribute $60 million (year 1996$)
per annum to joint projects, in addition to a continuing commitment Construction of a 14.5 km dual carriageway bypass to remove highway
of $100 million per annum for development and maintenance of traffic from the town centre of Taree. Work on the final stage at
the highway. Dumaresq Island was completed 12 April 2000.
The Federal Government has committed a total of $60 million (year Tyndale Realignment
1996$) per annum over the 10 years for joint projects on the Pacific Estimated Cost: $5.6M
Highway in NSW. Cost to date: $5.9M
1999/2000: $4.2M
The net impact of the Agreement and the NSW State Budget allocation
Completed: June 2000
is that $2.2 billion will be available for reconstruction of the Pacific
Highway NSW, including a maintenance component of $30 million Realignment of the highway adjacent to Tyndale. The project
per annum. incorporated a single access point for the Tyndale village. The project
will improve road safety and travel times as well as improving access for
Overall, this represents almost a three-fold increase in development
Tyndale village.
activity over the 10 years from July 1996.
Enormous economic, road safety and reduced travel time benefits will
be generated by the Upgrading Program. In addition, the need to MAJOR PROJECTS UNDERWAY
preserve and protect our environment is an important consideration Raymond Terrace to Karuah Duplication
in developing projects for this program. Estimated Cost: $67.0M
Cost to Date: $66.4M
Now at the end of its Fourth Year, the Upgrading Program has already
1999/2000: $41.7M
achieved some important milestones, with 14 major projects and
Estimated Completion: Late 2000
16 minor projects opened to traffic, construction currently underway
at 9 sites and 16 projects being planned. Construction of 18.2 km northbound carriageway next to the existing
carriageway between Raymond Terrace and Karuah. The existing
Extensive community consultation will continue for the life of
carriageway will also be upgraded to provide high standard dual
the program.
carriageway, which will improve safety, travel conditions and travel
times. Construction commenced in August 1998 and continued
throughout the year.
Coolongolook to Wang Wauk Upgrade
Estimated Cost: $49.0M
Cost to Date: $13.3M
1999/2000: $10.2M
Estimated Completion: Mid 2001
Provision of 11.7 km dual carriageways between Coolongolook and
Wang Wauk. Construction commenced in December 1999.
Lyons Road to Englands Road, Coffs Harbour Reconstruction
Estimated Cost: $64.5M
Cost to Date: $52.3M
1999/2000: $20.5M
Estimated Completion: Mid 2001
Construction of 5.3 km dual carriageways from Lyons Road to Englands
Road, Coffs Harbour, including grade-separated interchanges at Lyons
and Sawtell/Lindsays Roads. Construction commenced in October 1997
and continued throughout the year.

(130) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 131

APPENDIX 3 (Continued)
Major Projects – Country

Bray Street to Arthur Street, Coffs Harbour Upgrade


MAJOR PROJECTS BEING PLANNED
Estimated Cost: $27.0M
Karuah Bypass
Cost to Date: $25.2M
Estimated Cost: $113.0M
1999/2000: $11.9M
Cost to Date: $4.5M
Estimated Completion: August 2000
1999/2000: $1.4M
Upgrade of Pacific Highway between Bray/Orlando Streets and Arthur Estimated Completion: TBD
Street at the northern end of Coffs Harbour, including traffic signals at
Construction of 10.0 km dual carriageways at Karuah, to bypass the
Park Beach Road, grade separated interchange at Arthur Street with a
township of Karuah to the north. The project will improve safety and
roundabout under the highway, widening of railway over-bridge and
access conditions and provide increased flood immunity. Consideration
provision of facilities for pedestrians and cyclists. Construction
of responses to EIS display is in progress.
commenced in March 1998 and continued throughout the year.
Karuah to Bulahdelah Upgrade
Byrons Lane to Shark Creek Realignment
Estimated Cost: $225.0M
Estimated Cost: $14.0M
Cost to Date: $9.3M
Cost to Date: $5.3M
1999/2000: $3.1M
1999/2000: $3.1M
Estimated Completion: TBD
Completed: Stage 1 – June 2000
Estimated Completion: Stage 2 – TBD Construction of 34.2 km dual carriageways between Karuah and
Bulahdelah. Community comments received in response to the display
Realignment of 4.5 km section of the Pacific Highway north of Tyndale.
of the Environmental Impact Statement are being assessed.
Stage 1 involved the realignment of the existing highway for 1 km, and
Stage 2 will involve the construction of 3.5 km including overtaking Bulahdelah Upgrade
lane. Construction of Stage 1 was completed in June 2000. Estimated Cost: $145–165.0M
Cost to Date: $1.0M
Eversons Creek Overtaking Lane
1999/2000: $1.0M
Estimated Cost: $4.1M
Estimated Completion: TBD
Cost to Date: $3.6M
1999/2000: $1.4M Construction of 7.7 km dual carriageways between 92.0 and 99.7 km
Estimated Completion: End 2000 north of Newcastle. Community consultation has commenced and
route options are being investigated.
Construction of an overtaking lane at Eversons Creek. Adjustments to
Eversons Creek culvert in 2000/01 to complete the project. Bundacree Creek to Possum Brush Upgrade
Estimated Cost: $85.0M
Ewingsdale Interchange
Cost to Date: $2.2M
Estimated Cost: $24.0M
1999/2000: $1.2M
Cost to Date: $18.6M
Estimated Completion: TBD
1999/2000: $12.7M
Estimated Completion: December 2000 Provision of 9.0 km dual carriageway between Bundacree Creek and
Possum Brush (existing dual carriageway north of Nabiac). Concept
Construction of grade separated interchange for access to Byron Bay
development and environmental studies in progress.
to reduce traffic congestion, improve travel times and road safety.
Extensive landscaping including a ‘gateway’ into Byron Bay is included Taree to Coopernook Upgrade
in the project. Construction commenced in February 1999 and Estimated Cost: $59.0M
continued throughout the year. Cost to Date: $3.2M
1999/2000: $1.7M
Tandys Lane Upgrade
Estimated Completion: TBD
Estimated Cost: $49.0M
Cost to Date: $12.3M Provision of 7.5 km dual carriageways between Cundletown (north of
1999/2000: $6.8M Taree) and Coopernook. Final design is in progress and property
Estimated Completion: Late 2001 acquisitions are almost complete.
Construction of 5.5 km dual carriageways at Tandys Lane between Coopernook Bypass
Tyagarah and Brunswick Heads. Construction commenced in February Estimated Cost: $66.0M
2000. Cost to Date: $3.9M
1999/2000: $1.4M
Yelgun to Chinderah Upgrade
Estimated Completion: TBD
Estimated Cost: $348.0M
Cost to Date: $64.5M Construction of a 4.2 km dual carriageway bypass east of the existing
1999/2000: $52.8M highway at Coopernook. Final design is in progress and property
Estimated Completion: End 2002 acquisitions are almost complete.
Construction of 28.6 km dual carriageways between Yelgun and
Chinderah. The project will bypass the notorious Burringbar Range.
A design, construct and maintain contract was awarded. Construction
commenced in March 2000.

(131) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 132

APPENDIX 3 (Continued)
Major Projects – Country

Coopernook to Moorland Upgrade Ballina Bypass


Estimated Cost: $56.0M Estimated Cost: $198.0M
Cost to Date: $1.1M Cost to Date: $8.2M
1999/2000: $0.3M 1999/2000: $2.8M
Estimated Completion: TBD Estimated Completion: TBD
Provision of 10.2 km dual carriageway from the northern end of the Construction of 12.6 km dual carriageway bypass of Ballina.
Coopernook Bypass to near Camp Obadiah. Consideration of responses Community comments received in response to the display of the
to EIS display is in progress. Environmental Impact Statement are being assessed.
Moorland to Herons Creek Upgrade Bangalow to St Helena Upgrade
Estimated Cost: $110–140.0M Estimated Cost: $63.0M
Cost to Date: $0.4M Cost to Date: $1.9M
1999/2000: $0.1M 1999/2000: $0.9M
Estimated Completion: TBD Estimated Completion: TBD
Provision of approximately 22.0 km of dual carriageway between the Construction of 5.2 km of dual carriageways between the completed
proposed Coopernook to Moorland Upgrade and the completed Herons Bangalow Bypass in the south to the Ewingsdale Interchange project
Creek Deviation. Route selection studies commenced June 2000. in the north. Consideration of responses to the display of the EIS is
in progress.
Warrell Creek Realignment
Estimated Cost: $50.0M Brunswick Heads to Yelgun Upgrade
Cost to Date: $3.8M Estimated Cost: $154.0M
1999/2000: $1.5M Cost to Date: $5.6M
Estimated Completion: TBD 1999/2000: $2.3M
Estimated Completion: TBD
Provision of 4.9 km dual carriageways between Crouches Creek and the
existing Allgomera Deviation. The project will also incorporate the Construction of 6.7 km dual carriageways from the Brunswick River
relocation of a section of the North Coast railway line. Final design and to Yelgun including the second carriage way of the Brunswick Heads
property acquisitions are in progress. Bypass. Acquisitions and final design are in progress.
Bonville Deviation
Estimated Cost: $127.0M
MAJOR PROJECTS – SOUTHERN
Cost to Date: $4.6M
(3X3) denotes projects partly or wholly funded by the 3x3 fuel levy
1999/2000: $1.7M
Estimated Completion: TBD HUME HIGHWAY
Menangle to Gunning
Construction of 9.6 km dual carriageways from Perrys Road, Repton to
Final Cost: $3.2M
Lyons Road, Bonville (approximately 12.0 km south of Coffs Harbour).
1999/2000: $3.2M
Property acquisitions are in progress.
Completed: June 2000
Halfway Creek Realignment
Asphalt overlay on several sections of highway north and south
Estimated Cost: $18.0M
of Goulburn.
Cost to Date: $1.4M
1999/2000: $0.2M PRINCES HIGHWAY
Estimated Completion: TBD Waterfall to Yallah
Construction of 3.4 km dual carriageway upgrade between Dunmars Final Cost: $1.8M
Lane and BP Truckstop, Halfway Creek, 46.9 to 50.3 km north of 1999/2000: $1.8M
Coffs Harbour. Final design and property acquisition are in progress. Completed: June 2000
Ulmarra Bypass Pavement rehabilitation at Bulli Tops, Figtree and Dapto.
Estimated Cost: $29.0M Interchange at Helensburgh
Cost to Date: $1.4M Estimated Cost: $8.7M
1999/2000: $0.3M Cost to Date: $5.9M
Estimated Completion: TBD 1999–2000: $4.7M
Construction of a 4.8 km single carriageway bypass of Ulmarra Estimated Completion: October 2000
township and northbound overtaking lane (11.1 to 15.9 km north of Provision of north and southbound on/off-loading ramps at Helensburgh.
Grafton). Community comments received in response to the display of
the Environmental Impact Statement are being assessed.

(132) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 133

APPENDIX 3 (Continued)
Major Projects – Country

Oak Flats Macquarie Pass


Estimated Cost: $28.0M Final Cost: $0.9M
Cost to Date: $17.3M 1999/2000: $0.6M
1999/2000: $2.3M Completed: December 1999
Estimated Completion: May 2001 Widen Tongarra Creek bridge and upgrade approaches near the foot of
Construction of an interchange as part of the future route between Macquarie Pass.
Yallah and Oak Flats and to connect with an “east-west” link to Robertson
Albion Park. Final Cost: $5.1M
Gerringong 1999/2000: $4.2M
Final Cost: $4.5M Completed: July 2000
1999/2000: $3.0M Realignment west of Jamberoo Road including a new concrete bridge
Completed: April 2000 over Moss Vale – Port Kembla Rail Line.
Realignment south of Belinda Street to eliminate sub standard curves
and extend north and southbound overtaking lanes. FEDERAL HIGHWAY
South of Goulburn
Wollongong to south of Eden Final Cost: $0.2M
Final Cost: $4.8M 1999/2000: $0.2M
1999/2000: $4.8M Completed: June 2000
Completed: June 2000
Pavement rehabilitation 2.0 km south of Hume Highway.
Pavement rehabilitation at Falls Creek, Ulladulla, Moruya and south
of Eden. Lake George
Final Cost: $117.0M
Mogo to Moruya 1999/2000: $4.4M
Estimated Cost: $8.5M Completed: August 1999
Cost to Date: $4.7M
1999/2000: $2.4M Construction of 24.0km of dual carriageways. Southbound carriageway
Estimated Completion: 2002 between Remembrance Driveway and south of Brooks Creek was
opened to traffic on 27 May 1998. Full project opened to traffic on
Widening at various locations. 13 August 1999.
Kiama to Batemans Bay ACT to Sutton
Final Cost: $1.0M Estimated Cost: $42.6M
1999/2000: $0.9M Cost to Date: $32.5M
Completed: June 2000 1999/2000: $21.8M
Junction improvements at Rose Valley, Berry, Moruya and Eden. Completed: September 2000
Harts Creek (Country Timber Bridge Program) Dual carriageways from Sutton in NSW to ACT border opened to traffic
Estimated Cost: $1.0M September 2000, completing dual carriageway conditions between
1999/2000: $0.6M Sydney and Canberra.
Completed: September 2000
SNOWY MOUNTAINS HIGHWAY
Construction of new concrete bridge and approaches at Harts Creek, Bega to Kiandra
7.0 km south of Pambula. Final Cost: $0.3M
Eden 1999/2000: $0.3M
Final Cost: $1.0M Completed: June 2000
1999/2000: $0.7M Pavement rehabilitation between Brown Mountain and Bemboka.
Completed: December 1999
Construction of new bridge and approaches at Government Road, MONARO HIGHWAY
Eden. ACT Border to Bombala
Final Cost: $0.6M
ILLAWARRA HIGHWAY 1999/2000: $0.6M
Albion Park and Moss Vale Completed: May 2000
Final Cost: $0.7M Pavement rehabilitation at Michelago, Ingelara and Bobingah.
1999/2000: $0.7M
Completed: December 1999 South of Bombala (3x3)
Final Cost: $10.7M
Pavement rehabilitation at Albion Park and Moss Vale. 1999/2000: $0.8M
Completed: November 1999
Realignment and sealing, 31.8 to 37.2 km south of Bombala, to
eliminate the final unsealed section of this route.

(133) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 134

APPENDIX 3 (Continued)
Major Projects – Country

KINGS HIGHWAY Jindabyne


Batemans Bay to Queanbeyan (3x3) Final Cost: $1.1M
Final Cost: $1.0M 1999/2000: $0.2M
1999/2000: $1.0M Completed: December 1999
Completed: March 2000
Capacity improvements between Thredbo Terrace and Kalkite Street
Pavement rehabilitation at Nelligen, Bungendore and Queanbeyan. and Barry Way, including roundabout at Kalkite Street.
Batemans Bay to Queanbeyan Alpine Way
Final Cost: $1.1M Jindabyne to National Park Entrance
1999/2000: $0.7M Final Cost: $0.2M
Completed: February 2000 1999/2000: $0.2M
Reconstruction and realignment 35.0 to 37.0 km east of Queanbeyan. Completed: March 2000

Braidwood (Country Timber Bridge Program) Pavement rehabilitation and minor widening 7.8 km west of
Estimated Cost: $0.7M Kosciuszko Road.
Cost to Date: $0.6M Shellharbour Road
1999/2000: $0.6M Final Cost: $0.3M
Completed: September 2000 1999/2000: $0.3M
Construction of new concrete bridge and approaches at Northangera Completed: March 2000
Creek 12 km east of Braidwood. Pavement rehabilitation at Warilla.

OTHER Bulli
Lanyon Drive, Queanbeyan Final Cost: $0.2M
Final Cost: $1.6M 1999/2000: $0.2M
1999/2000: $1.5M Completed: June 2000
Completed: February 2000 Upgraded commuter parking at Bulli Railway Station.
Duplication McRae Street to Jerrambomberra Road.
Goulburn to Crookwell Road MAJOR PROJECTS – WESTERN
Final Cost: $0.5M
1999/2000: $0.5M NEWELL HIGHWAY
Completed: May 2000 Alawa
Pavement rehabilitation between Crookwell and Binda. Estimated Cost: $4.7M
Cost to Date: $4.8M
Goulburn to Doughboy Road 1999/2000: $0.2M
Final Cost: $0.7M Completed: April 2000
1999/2000: $0.7M
Completed: March 2000 Pavement rehabilitation and widening 60.3 to 68.0 km north of Moree.

Pavement rehabilitation between Goulburn and Tarago. Gil Gil


Estimated Cost: $3.2M
Mt Ousley Road Cost to Date: $3.0M
Estimated Cost: $1.5M 1999/2000: $2.0M
Cost to Date: $0.7M Estimated Completion: November 2000
1999/2000: $0.6M
Estimated Completion: December 2000 Pavement rehabilitation 30.7 to 36.9 km north of Moree.

Construction of new concrete bridge over Mt Ousley Road at Moree By-Pass


New Mt Pleasant Road. Estimated Cost: $27.0M
Cost to Date: $0.8M
Nowra–Mittagong Road 1999/2000: $0.3M
Final Cost: $0.8M Estimated Completion: December 2003
1999/2000: $0.8M
Completed: May 2000 Planning for future construction of heavy vehicle by-pass of Moree.

Pavement rehabilitation at Kangaroo Valley. Five Mile, Sandy and Bulga Creek Bridges
Estimated Cost: $3.0M
Kosciuszko Road Cost to Date: $3.2M
Cooma to Perisher Valley 1999/2000: $2.2M
Final Cost: $1.2M Completed: April 2000
1999/2000: $1.2M
Completed: April 2000 Widening of 5 Mile and Bulga Creek bridges and replacement of Sandy
Creek Bridge between 8.0 and 16.0 km north of Gilgandra.
Pavement rehabilitation near Cooma Airport, at East Jindabyne
and Perisher Valley.

(134) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 135

APPENDIX 3 (Continued)
Major Projects – Country

Yarrabah GOLDEN HIGHWAY


Estimated Cost: $4.2M West of Dunedoo to Cobborah (3x3)
Cost to Date: $0.9M Estimated Cost: $1.5M
1999/2000: $0.8M Cost to Date: $0.8M
Estimated completion: December 2000 1999/2000: $0.5M
Estimated Completion: June 2001
Construction of 2 overtaking lanes near Yarrabah Creek, south
of Dubbo. Widening 6.9 to 14.8 km west of Dunedoo.
Ugumjil Fitzells Creek (3x3)
Estimated Cost: $3.4M Estimated Cost: $1.8M
Cost to Date: $3.0M Cost to Date: $1.7M
1999/2000: $2.0M 1999/2000: Nil
Estimated Completion: July 2000 Completed: February 2000
Pavement rehabilitation 85.9 to 90.7 km north of Parkes. Reconstruction and widening of 4.0 km from Fitzells Creek
to Ballimore.
GREAT WESTERN HIGHWAY
Little Hartley Elong Elong (3x3)
Estimated Cost: $20.0M Estimated Cost: $0.8M
Cost to Date: $1.0M Cost to Date: $0.7M
1999/2000: $0.3M 1999/2000: $0.7M
Estimated Completion: to be decided Estimated Completion: August 2000
Reconstruction and realignment at Mid Hartley. Rehabilitation of pavement 35.0 to 40.2 km west of Dunedoo.
CASTLEREAGH HIGHWAY CARNARVON HIGHWAY
Lidsdale to Coxs River Moree to Mungindi
Estimated Cost: $6.8M Estimated Cost: $3.0M
Cost to Date: $0.7M Cost to Date: $3.0M
1999/2000: $0.3M 1999/2000: $2.6M
Estimated Completion: June 2004 Completed: April 2000
Pavement rehabilitation, widening and realignment from Lidsdale to Completion of initial sealing of final 16.0 kms.
Coxs River between 11.0 and 13.0 km north of Lithgow. KAMILAROI HIGHWAY
Lidsdale Rail Overbridge Gunnedah to Narrabri
Estimated Cost: $6.0M Estimated Cost: $3.6M
Cost to Date: $3.1M Cost to Date: $3.7M
1999/2000: $2.9M 1999/2000: $0.5M
Estimated Completion: May 2001 Completed: March 2000
Replacement of brick arch rail overbridge and pavement Widening north of Boggabri to enable use by B-Doubles.
reconstruction, 9.0 to 10.5 km north of Lithgow. Gunnedah Boundary
MID WESTERN HIGHWAY Estimated Cost: $1.5M
Carcoar Cost to Date: $0.7M
Estimated Cost: $3.3M 1999/2000: $0.7M
Cost to Date: $3.2M Estimated Completion: December 2000
1999/2000: $3.2M Pavement rehabilitation 28.8 to 34.1 km north of Gunnedah.
Completed: March 2000
Wee Waa Road
Pavement rehabilitation on Mid Western Highway at Carcoar. Final Cost: $3.0M
Dicks and McLeans Creeks Cost to Date: $3.1M
Estimated Cost: $6.7M 1999/2000: $1.7M
Cost to Date: $3.1M Completed: April 2000
1999/2000 $2.7M Restoration of flood damage 29.0 to 39.0 km west of Narrabri.
Estimated Completion: February 2001
Brewarrina Shire (3x3)
Reconstruction and realignment including replacement of two bridges, Final Cost: $5.0M
between 18.0 and 21.0 km west of Bathurst. 1999/2000: $0.9M
Kings Plains Completed: December 1999
Estimated Cost: $9.0M Completion of bitumen sealing from Brewarrina to Walgett Boundary.
Cost to Date: $0.7M
1999/2000: $0.6M
Estimated Completion: June 2002
Realignment of Mid Western Highway at Kings Plains Village.

(135) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 136

APPENDIX 3 (Continued)
Major Projects – Country

Walgett Shire (3x3)


MAJOR PROJECTS – NORTHERN
Final Cost: $3.6M
1999/2000: $0.6M OXLEY HIGHWAY (SH11)
Completed: November 1999 Congi Creek (Country Timber Bridge Program)
Completion of bitumen sealing from Walgett to Brewarrina Shire Estimated Cost: $0.9M
Boundary. Cost to Date: $0.1M
1999/2000: $0.1M
KIDMAN WAY
Estimated Completion: January 2001
Western Rail Line to Cobar
Estimated Cost: $10.5M Construction of new concrete bridge and approaches, 34.0 km west
Cost to Date: $9.8M of Walcha.
1999/2000: $0.3M SUMMERLAND WAY
Completed: May 2000 Grafton Bridge approaches
Completion of initial seal from the Western Rail Line to Cobar. Final Cost: $0.7M
1999/2000: $0.6M
Sandy Creek
Completed: April 2000
Estimated Cost: $1.1M
Cost to Date: $0.7M Improvements to the northern Grafton Bridge approaches.
1999/2000: $0.6M 14 to 16 km north of Grafton
Estimated Completion: November 2000 Final Cost: $0.9M
Construction of new concrete bridge. 1999/2000: $0.5M
Completed: November 1999
BATHURST TO ILFORD ROAD
Final Cost: $3.4M Pavement rehabilitation, 14.0 to 15.8 km north of Grafton.
Cost to Date: $3.0M Gordons Bridge
1999/2000: $1.0M Final Cost: $2.0M
Completed: December 1999 1999/2000: $0.2M
Completion of new bitumen sealing near Sofala. Completed: November 1999
Gordons Bridge, north of Kyogle.
WALGETT BRIDGES (Country Timber Bridge Program) 95.1 to 96.3 km north of Grafton
Estimated Cost: $0.9M
Castlereagh/Gwydir/Kamilaroi Highways Cost to Date: $0.5M
Estimated Cost: $10.2M 1999/2000 $0.5M
Cost to Date: $6.2M Estimated Completion: August 2000
1999/2000: $6.2M Widen Summerland Way 95.1 to 96.3 km north of Grafton.
Estimated Completion: January 2001
Newpark overtaking lane
Construction of 12 concrete bridges and approaches at: Estimated Cost: $0.5M
Cumberdoon Creek 108.0 km north of Coonamble Final Cost: $0.5M
Shallow Creek 109.0 km north of Coonamble 1999/2000: $0.3M
Booroom Creek 56.0 km west of Walgett Estimated completion September 1999
Borumbil Creek 43.0 km west of Walgett Overtaking lane at Newpark, 2.0 km north of Kyogle
Pian Creek 13.0 km east of Walgett Overtaking lanes north of Grafton
Pagans Creek 6.0 km north of Walgett Estimated Cost: $0.9M
5 mile Warramboo 9.0 km north of Walgett Final Cost: $0.5M
Narran River–Jim Harter Bridge 115.0 km north of Walgett 1999/2000: $0.5M
Castlereagh River 68.0 km north of Coonamble Estimated completion October 2000
Nugal Swamp 75.0 km north of Coonamble Northbound overtaking lane, 18.0 to 19.1 km north of Grafton.
2 mile Warramboo 4.0 km north of Walgett
13 mile Warramboo 54.0 km south of Collarenebri. GWYDIR HIGHWAY (SH12)
Middle Creek (Country Timber Bridge Program)
Final Cost: $0.5M
1999/2000 $0.1M
Completed: August 1999
Construction of new concrete bridge and approaches, 65.0 km west
of Grafton.

(136) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 137

APPENDIX 3 (Continued)
Major Projects – Country

Nogulga Creek (Country Timber Bridge Program) Plumbago Creek (Country Timber Bridge Program)
Final Cost: $0.6M Estimated Cost: $1.2M
1999/2000: $0.5M 1999/2000: $0.1M
Completed: December 1999 Cost to date: $0.1M
Estimated Completion: December 2000
Construction of new concrete bridge and approaches, 45.0 km west
of Grafton. Construction of new concrete bridge and approaches, 77.0 km west
of Casino.
Cangai Creek (Country Timber Bridge Program)
Estimated Cost: $0.8M Sandy Creek (Country Timber Bridge Program)
Cost to Date: $0.8M Final Cost: $0.7M
1999/2000: $0.8M 1999/2000: $0.2M
Estimated Completion: July 2000 Completed: July 1999
Construction of new concrete bridge and approaches at Cangai Creek, Construction of new concrete bridge and approaches, 58.0 km west
52.0 km west of Grafton. of Casino.
BRUXNER HIGHWAY (SH16) Maguires Creek, Alstonville (Country Timber Bridge Program)
Tabulam Overflow No.1 (Country Timber Bridge Program) Final Cost: $0.5M
Estimated Cost: $0.8M 1999/2000: $0.1M
1999/2000: $0.3M Completed: July 1999
Cost to Date: $0.3M Construction of new concrete bridge and approaches in Alstonville.
Estimated Completion: January 2001
WATERFALL WAY
Construction of new concrete bridge and approaches 56.0 km west Connells Creek (Country Timber Bridge Program)
of Casino. Final Cost: $0.3M
Tabulam Overflow No.2 (Country Timber Bridge Program) 1999/2000: $0.0M
Estimated Cost: $0.9M Completed: October 1999
1999/2000: $0.2M Construction of new concrete bridge and approaches 3.6 km west
Cost to Date: $0.2M of Pacific Highway.
Estimated Completion: January 2001
Rocky Creek No.1 (Country Timber Bridge Program)
Construction of new concrete bridge and approaches 56.0 km west Estimated Cost: $0.3M
of Casino. 1999/2000: $0.2M
Slatey Creek (Country Timber Bridge Program) Cost to Date: $0.3M
Estimated Cost: $0.4M Estimated Completion: September 2000
1999/2000: $0.0M Construction of new concrete bridge and approaches 3.0 km east
Cost to Date: $0.0M of Dorrigo.
Estimated Completion: January 2001
Rocky Creek No.2 (Country Timber Bridge Program)
Construction of new concrete bridge and approaches, 91.0 km west Estimated Cost: $0.2M
of Casino. 1999/2000: $0.1M
Swamp Oak Creek (Country Timber Bridge Program) Cost to Date: $0.2M
Estimated Cost: $1.3M Estimated Completion: September 2000
1999/2000: $0.3M Construction of new concrete bridge and approaches 3.0 km east
Cost to Date: $0.3M of Dorrigo.
Estimated Completion: January 2001
Cooney Creek No.1 (Country Timber Bridge Program)
Construction of new concrete bridge and approaches, 114.0 km west Final Cost: $0.5M
of Casino. 1999/2000: $0.5M
Barney Downs Creek (Country Timber Bridge Program) Completed: June 2000
Estimated Cost: $1.2M Construction of new concrete bridge and approaches 23.0 km east
1999/2000: $0.1M of Armidale.
Cost to Date: $0.1M
Estimated Completion: January 2001 Cooney Creek No.2 (Country Timber Bridge Program)
Final Cost: $0.2M
Construction of new concrete bridge and approaches, 118.0 km west 1999/2000: $0.2M
of Casino. Completed: June 2000
Construction of new concrete bridge and approaches, 23.0 km east
of Armidale.

(137) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 138

APPENDIX 4
Heritage and Conservation Register

The RTA has a responsibility to identify and manage the items of environmental heritage which are in its ownership, care or control. These items are
predominantly bridges. However, the RTA is also responsible for a number of other items including vehicular ferries and property assets.
To assist heritage management and to meet its statutory obligation under Section 170 of the Heritage Act 1977, the RTA holds a heritage and
conservation register. Furthermore, in accordance with the Heritage Act, the RTA is required to inspect, and report annually on items in its register
including their condition.
Abbreviations:
SHI – State Heritage Inventory reference number
LOS – Level of significance assigned in accordance with NSW Heritage Manual
CMP – Conservation management plan (some are Heritage Council endorsed)
SHR – State Heritage Register listing

SYDNEY REGION ITEMS


Alfords Point Bridge SHI: 15046 Location: Alfords Point LOS: Not Assessed
CMP: No SHR: No Last Insp: 11/3/99
Condition: Good Statutory Applications: None
In Use? Yes Activities/Changes: None

Box Girder Bridge, Nepean River SHI: 12852 Location: Penrith LOS: Not Assessed
CMP: No SHR: No Last Insp: 16/3/99
Condition: Fair Statutory Applications: None
In Use? Yes Activities/Changes: None

Cable Ferry SHI: 14052 Location: Mortlake LOS: Not Assessed


CMP: No SHR: No Last Insp: Not Available
Condition: Good Statutory Applications: None
In Use? Yes Activities/Changes: None

Cable Ferry SHI: 4300311 Location: Wisemans Ferry LOS: Not Assessed
CMP: No SHR: No Last Insp: Not Available
Condition: Good Statutory Applications: None
In Use? Yes Activities/Changes: None

Captain Cook Bridge, Southern Approach SHI: 14978 Location: Taren Point LOS: Not Assessed
CMP: SHR: No Last Insp: 21/11/96
Condition: Good Statutory Applications: None
In Use? Yes Activities/Changes: None

De Burghs Bridge SHI No: 14050 Location: Macquarie Park LOS: Not Assessed
CMP: No SHR: No Last Insp: 29/7/98
Condition: Fair Statutory Applications: None
In Use? Yes Activities/Changes: None

Disused section of MR 181 adjacent Portion 32 SHI No: 5856 Location: Wisemans Ferry LOS: Not Assessed
CMP: No SHR: No Last Insp: 6/99
Condition: Poor, work required Statutory Applications: None
In Use? No Activities/Changes: None

Gladesville Bridge SHI No: 4300309 Location: Drummoyne LOS: Not Assessed
CMP: No SHR: No Last Insp: 27/7/98
Condition: Good Statutory Applications: None
In Use? Yes Activities/Changes: Oral history on
the bridge’s construction to be
undertaken

(138) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 139

APPENDIX 4 (Continued)
Heritage and Conservation Register

Glebe Island Bridge SHI No: 8791 Location: Glebe Island LOS: Not Assessed
CMP: No SHR: No Last Insp: 21/9/97
Condition: Fair Statutory Applications: None
In Use? No Activities/Changes: CMP on hold

Hawkesbury River Bridge SHI No: 5481 Location: North Richmond LOS: Not Assessed
CMP: No SHR: No Last Insp: 23/3/99
Condition: Good Statutory Applications: None
In Use? Yes Activities/Changes: None

House – 164 Ramsay St SHI No: 770 Location: Haberfield LOS: Not Assessed
CMP: No SHR: No Last Insp: Ongoing
Condition: Fair Statutory Applications: None
In Use? Rented Activities/Changes: None

House – 1d River Rd SHI No: 15243 Location: Woronora LOS: Not Assessed
CMP: No SHR: No Last Insp: Ongoing
Condition: Poor Statutory Applications: None
In Use? Vacant with project Activities/Changes: None

House – 46 Martin St SHI: 771 Location: Haberfield LOS: Not Assessed


CMP: SHR: No Last Insp: Ongoing
Condition: Fair Statutory Applications: None
In Use? Rented Activities/Changes: None

House 48 Kingston St SHI No: 650 Location: Haberfield LOS: Not Assessed
CMP: No SHR: No Last Insp: Ongoing to
Condition: Good Statutory Applications: None sale date
In Use? Sold Activities/Changes: Sold in
April 2000. To be removed from
RTA register.

Knapsack Viaduct SHI No: 1584 Location: Lapstone LOS: Not Assessed
CMP: No SHR: No Last Insp: 13/7/98
Condition: Good Statutory Applications: None
In Use? Yes Activities/Changes: None

Lansdowne Bridge SHI No: 4253 Location: Lansvale LOS: State


CMP: No SHR: Yes Last Insp: 16/3/93
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: None

Lennox Bridge SHI No: 4300301 Location: Parramatta LOS: State


CMP: No SHR: Yes Last Insp: 5/00
Condition: Good Statutory Applications: None
In Use? Yes Activities/Changes: None

Macquarie St Gate House SHI No: 12597 Location: Parramatta LOS: Not Assessed
CMP: No SHR: No Last Insp: 2/9/99
Condition: Good Statutory Applications: None
In Use? Not operating asset Activities/Changes: Concrete pillars
subject to repair

Milestone – Liverpool Rd cnr Badmington Rd SHI No:2753 Location: Croydon LOS: Local
CMP: No SHR: No Last Insp: Early 1999
Condition: Fair Statutory Applications: None
In Use? Not operating asset Activities/Changes: Heritage
assessment & conservation study
completed

(139) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 140

APPENDIX 4 (Continued)
Heritage and Conservation Register

Milestone – Parramatta Rd near Cheltenham Rd SHI No: 2756 Location: Croydon LOS: Local
CMP: No SHR: No Last Insp: Early 1999
Condition: Statutory Applications: None
In Use? Not operating asset Activities/Changes: Heritage
assessment & conservation study
completed

Milestone – Parramatta Rd SHI No: 10321 Location: Stanmore LOS: Local


CMP: No SHR: No Last Insp: Early 1999
Condition: Currently missing Statutory Applications: None
In Use? Not operating asset Activities/Changes: Heritage
assessment & conservation study
completed

Old Windsor Rd – Seven Hills to Kellyville SHI No: 1385 Location: Seven Hills to Kellyville LOS: Not Assessed
CMP: No SHR: No Last Insp: 2/9/99
Condition: Fair Statutory Applications: None
In Use? Yes Activities/Changes: None

Pearces Creek Bridge SHI No: 4300009 Location: Galston Gorge LOS: State
CMP: Yes SHR: No Last Insp: 9/9/98
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: CMP completed

Peats Ferry Bridge Crown Land SHI No: 4300308 Location: Brooklyn LOS: Not Assessed
CMP: No SHR: No Last Insp: Not available
Condition: Not available Statutory Applications: None
In Use? NA Activities/Changes: None

Pyes Creek Bridge SHI No: 4300310 Location: Cherrybrook LOS: Not Assessed
CMP: No SHR: No Last Insp: Not available
Condition: Not available Statutory Applications: None
In Use? No Activities/Changes: Question of RTA
responsibility to be investigated.

Queen Anne House – London Terrace SHI No: 10287 Location: Enmore LOS: Not Assessed
CMP: No SHR: No Last Insp: Ongoing
Condition: Good Statutory Applications: None
In Use? Rented Activities/Changes: None

Remains of Figtree Bridge SHI No: 7378 Location: Hunters Hill LOS: Not Assessed
CMP: No SHR: No Last Insp: Ongoing
Condition: Good Statutory Applications: None
In Use? No Activities/Changes: None

Remains of Wandella & Garden SHI No: 7473 Location: Hunters Hill LOS: Not Assessed
CMP: No SHR: No Last Insp: Ongoing
Condition: Fair Statutory Applications: None
In Use? No Activities/Changes: Vacant land

Slab Cottage, Western end – Neeve St SHI No: 1365 Location: Prospect LOS: Not Assessed
CMP: No SHR: No Last Insp: Not available
Condition: Fair Statutory Applications: None
In Use? Information not available Activities/Changes: None

(140) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 141

APPENDIX 4 (Continued)
Heritage and Conservation Register

Southern Gate House SHI No: 12615 Location: Parramatta Park LOS: Not Assessed
CMP: No SHR: No Last Insp: 2/9/99
Condition: Poor Statutory Applications: None
In Use? No Activities/Changes: None

Ryde Bridge SHI No: 14049 Location: Ryde LOS: Not Assessed
CMP: No SHR: No Last Insp: 12/8/98
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: None

Site of Figtree Tea Rooms & Aquatic Tea Room SHI No: 7380 Location: Hunters Hill LOS: Not Assessed
CMP: No SHR: No Last Insp: Ongoing
Condition: NA Statutory Applications: None
In Use? Activities/Changes: None

Site of Figtree Wharf & Boatshed SHI No: 7386 Location: Hunters Hill LOS: Not Assessed
CMP: No SHR: No Last Insp: Ongoing
Condition: NA Statutory Applications: None
In Use? No Activities/Changes: None

St Albans Bridge, MacDonald River SHI No: 4300129 Location: St Albans LOS: State
CMP: Yes SHR: Yes Last Insp: 24/9/99
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: CMP completed

Stone Setting, Tom Ugly’s Bridge SHI No: 14981 Location: Sylvania LOS: Not Assessed
CMP: No SHR: No Last Insp: 15/9/99
Condition: Fair Statutory Applications: None
In Use? Yes Activities/Changes: Stone walls
subject to runoff from under
carriageway

Suspension Bridge, Northbridge SHI No: 18303 Location: Northbridge LOS: Not Assessed
CMP: No SHR: No Last Insp: 1/3/99
Condition: Good Statutory Applications: None
In Use? Yes Activities/Changes: None

Harbour Bridge & Approaches SHI No: 15492 Location: Milsons Pt/Dawes Pt LOS: State
CMP: Yes (HC endorsed) SHR: Yes Last Insp: 29/3/99
Condition: Fair Statutory Applications: S.60
approvals granted. Various works.
In Use? Yes Activities/Changes: Regular
maintenance and alterations.

The Spit Bridge SHI No: 4300307 Location: Mosman LOS: Not Assessed
CMP: No SHR: No Last Insp: 15/5/99
Condition: Good Statutory Applications: None
In Use? Yes Activities/Changes: None

Tom Ugly’s Bridge (1929) SHI No: 14982 Location: Sylvania LOS: Not Assessed
CMP: No SHR: No Last Insp: 26/1/99
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: None

Tom Ugly’s Bridge (1987) SHI No: 14983 Location: Sylvania LOS: Not Assessed
CMP: No SHR: No Last Insp: 14/11/96
Condition: Fair Statutory Applications: None
In Use? Yes Activities/Changes: None

(141) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 142

APPENDIX 4 (Continued)
Heritage and Conservation Register

HUNTER REGION ITEMS

Barrington Bridge, Barrington River SHI No: 4300161 Location: Gloucester LOS: Regional
CMP: No SHR: No Last Insp: 18/5/99
Condition: Fair Statutory Applications: None
In Use? Yes Activities/Changes: None

Beckers Bridge over Webbers Creek SHI No: 4300128 Location: Gresford West LOS: State
CMP: No SHR: Yes Last Insp: 1/7/99
Condition: Fair Statutory Applications: None
In Use? Yes Activities/Changes: None

Bulga Bridge over Wollombi Brook SHI No: 4300181 Location: Bulga LOS: State
CMP: No SHR: Yes Last Insp: 7/2/00
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: None

Clarencetown Bridge, Williams River SHI No: 4063 Location: Clarencetown LOS: State
CMP: Yes SHR: Yes Last Insp: 25/8/99
Condition: Fair Statutory Applications: None
In Use? Yes Activities/Changes: CMP in
preparation.

Cooreei Bridge, Williams River SHI No: 4300177 Location: LOS: State
CMP: No SHR: Yes Last Insp: 1/10/99
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes:

Dunmore Bridge, Paterson River SHI No: 9544 Location: Woodville LOS: State
CMP: No SHR: Yes Last Insp: 23/9/99
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: None

Elderslie Bridge over Hunter River SHI No: 14311 Location: Elderslie LOS: Not Assessed
CMP: No SHR: No Last Insp: 11/8/99
Condition: Fair Statutory Applications: None
In Use? Yes Activities/Changes: None

Fitzgerald Bridge, Hunter River SHI No: 14109 Location: Aberdeen LOS: Not Assessed
CMP: No SHR: No Last Insp: 1/7/98
Condition: Fair Statutory Applications: None
In Use? Yes Activities/Changes: None

Fitzgerald Bridge, Williams River SHI No: 4300313 Location: Raymond Terrace LOS: Local
CMP: No SHR: No Last Insp: 19/5/99
Condition: Fair Statutory Applications: None
In Use? Yes Activities/Changes: None

Gostwyck Bridge, Paterson River SHI No: 4016 Location: Paterson LOS: Not Assessed
CMP: No SHR: No Last Insp: 29/9/99
Condition: Good Statutory Applications: None
In Use? Yes Activities/Changes: None

Hexham Bridge SHI No: 11526 Location: Hexham LOS: Not Assessed
CMP: No SHR: No Last Insp: 11/5/98
Condition: Fair Statutory Applications: None
In Use? Yes Activities/Changes: None

(142) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 143

APPENDIX 4 (Continued)
Heritage and Conservation Register

Hinton Bridge, Paterson River SHI No: 9528 Location: Hinton LOS: State
CMP: No SHR: Yes Last Insp: 23/9/99
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: None

Kayuga Bridge SHI No: 11196 Location: Muswellbrook LOS: Not Assessed
CMP: No SHR: No Last Insp: 30/7/99
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: None

Luskintyre Bridge, Hunter River SHI No: 4300305 Location: Lochinvar LOS: Regional
CMP: No SHR: No Last Insp: 30/9/99
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: None

Martin Bridge, Manning River SHI No: 4300300 Location: Taree LOS: Not Assessed
CMP: No SHR: No Last Insp: 10/2/99
Condition: Fair Statutory Applications: None
In Use? Yes Activities/Changes: None

Middle Falbrook Bridge, Glennies Creek SHI No: 4300131 Location: Middle Falbrook LOS: State
CMP: No SHR: Yes Last Insp: 29/7/99
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: None

Monkerai Bridge, Karuah River SHI No: 4300133 Location: Monkerai LOS: State
CMP: No SHR: Yes Last Insp: 17/5/99
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: None

Morpeth Bridge, Hunter River SHI No: 9702 Location: Morpeth LOS: State
CMP: No SHR: Yes Last Insp: 3/9/99
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: None

Paterson River Road Bridge SHI No: 3931 Location: Paterson LOS: Not Assessed
CMP: No SHR: No Last Insp: 21/5/98
Condition: Fair Statutory Applications: None
In Use? Yes Activities/Changes: None

Redbourneberry Bridge over Hunter River SHI No: 4300304 Location: Singleton West LOS: Local
CMP: No SHR: No Last Insp: 28/7/99
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: None

Vacy Bridge, Paterson River SHI No: 3951 Location: Vacy LOS: State
CMP: No SHR: Yes Last Insp: 1/9/99
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: None

Yarrawa Bridge, Goulburn River SHI No: 4300170 Location: Denman LOS: Regional
CMP: No SHR: No Last Insp: 29/7/99
Condition: Good Statutory Applications: None
In Use? Yes Activities/Changes: None

(143) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 144

APPENDIX 4 (Continued)
Heritage and Conservation Register

NORTHERN REGION ITEMS

Ashby Dry Dock SHI No: 4300303 Location: Ashby LOS: Not Assessed
CMP: No SHR: No Last Insp: Not available
Condition: Good Statutory Applications: None
In Use? Yes Activities/Changes: Tenders
received for CMP preparation

Bean Tree Bridge, Richmond River SHI No: 4300168 Location: Wiangaree LOS: Local
CMP: No SHR: No Last Insp: 23/2/98
Condition: Fair Statutory Applications: None
In Use? Yes Activities/Changes: None

Bridge over Five Day Creek SHI No: 4300008 Location: Kempsey LOS: State
CMP: No SHR: No Last Insp: 12/1/99
Condition: Fair Statutory Applications: DA to
demolish approved.
In Use? Yes Activities/Changes: CMP
under preparation

Bridge over Orara River SHI No: 12485 Location: Coramba LOS: Local
CMP: No SHR: No Last Insp:7/6/99
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: None

Briner Bridge over Upper Coldstream River SHI No: 4300158 Location: Tucabia LOS: Regional
CMP: No SHR: No Last Insp: 13/11/98
Condition: Good Statutory Applications: None
In Use? Yes Activities/Changes: CMP in progress

Clarence River Bridge SHI No: 4505 Location: Grafton LOS: Not Assessed
CMP: SRA has CMP SHR: No Last Insp: Not available
Condition: Good Statutory Applications: None
In Use? Yes Activities/Changes: None

Clarence River Road Bridge SHI No: 8230 Location: Tabulam LOS: State
CMP: No SHR: Yes Last Insp: 17/9/98
Condition: Fair Statutory Applications: None
In Use? Yes Activities/Changes:
CMP being prepared

Colemans Bridge, Leycester Creek SHI No: 9179 Location: Lismore LOS: State
CMP: No SHR: Yes Last Insp: 2/7/99
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: None

Gwydir River Road Bridge SHI No: 17593 Location: Bundarra LOS: No Assessed
CMP: No SHR: No Last Insp:2/12/98
Condition: Fair Statutory Applications: None
In Use? Yes Activities/Changes: None

(144) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 145

APPENDIX 4 (Continued)
Heritage and Conservation Register

Gwydir River/Halls Creek Road Bridges,


Bingara (A) SHI No: 1345 Location: Bingara LOS: Not Assessed
CMP: No SHR: No Last Insp: Not available
Condition: Good Statutory Applications: None
In Use? Yes Activities/Changes: None

Gwydir River/Halls Creek Road Bridges,


Bingara (B) SHI No: 1347 Location: Bingara LOS: Not Assessed
CMP: No SHR: No Last Insp: 30/11/98
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: None

Korns Crossing Bridge, Rous River SHI No: 4300160 Location: Crystal Creek LOS: Regional
CMP: No SHR: No Last Insp: 9/10/98
Condition: Good Statutory Applications: None
In Use? Yes Activities/Changes: None

Kynnumboon Bridge, Rous River SHI No: 4300169 Location: Kynnumboon LOS: Regional
CMP: No SHR: No Last Insp: 5/5/99
Condition: Poor Statutory Applications: None
In Use? No from mid August 2000 Activities/Changes: Bridge being bypassed

Shark Creek Bridge, Pacific Hwy SHI No: 9518 Location: Shark Creek LOS: Not Assessed
CMP: No SHR: No Last Insp: 14/9/98
Condition: Good Statutory Applications: None
In Use? No Activities/Changes: None

Sportsmans Creek Road Bridge SHI No: 3595 Location: Lawrence LOS: State
CMP: No SHR: No Last Insp: 2/7/99
Condition: Good Statutory Applications: None
In Use? No Activities/Changes: None

(145) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 146

APPENDIX 4 (Continued)
Heritage and Conservation Register

SOUTHERN REGION ITEMS

Charleyong Bridge over Mongarlowe Rover SHI No: 4300172 Location: Charleyong LOS: Local
CMP: No SHR: No Last Insp: 13/2/99
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: None

Crankies Plain Bridge SHI No: 4300006 Location: Bombala LOS: State
CMP: Yes SHR: Yes Last Insp: 4/3/99
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: Currently being repaired. Truss members replaced with similar age
members.

Cunningham’s Point Bridge SHI No: 4300004 Location: Bombala LOS: Regional
CMP: Yes SHR: No Last Insp: 15/10/99
Condition: Poor Statutory Applications: None
In Use? No Activities/Changes: None

Gundaroo Bridge, Yass River SHI No: 4300157 Location: Gundaroo LOS: Local
CMP: No SHR: No Last Insp: 15/11/99
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: None

Hampden Bridge, Kangaroo Valley SHI No: 14251 Location: Kangaroo Valley LOS: State
CMP: Yes SHR: No Last Insp:27/2/99
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: None

House – 306 Princes Hwy SHI No: 4300521 Location: Bulli LOS: Not Assessed
CMP: No SHR: No Last Insp: Ongoing
Condition: House demolished Statutory Applications: None
In Use? No Activities/Changes: Site no longer a heritage item. Removed from LEP.

House – 85 Farell Rd, SHI No: 19125 Location: Bulli LOS: Not Assessed
CMP: No SHR: No Last Insp: Ongoing
Condition: Fair Statutory Applications: None
In Use? Rented Activities/Changes: None

Landsdowne Bridge over Mulwaree Ponds SHI No: 4300186 Location: Goulburn LOS: Regional
CMP: No SHR: No Last Insp: 10/99
Condition: Poor Statutory Applications:
In Use? Yes Activities/Changes: Repaired in
1999. Replacement of girders on
approach span to truss. Replacement
of handrails.

Maldon Bridge SHI No: 19064 Location: Picton LOS: Not Assessed
CMP: No SHR: No Last Insp: 3/12/98
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: Control has
been passed to Wollondilly Council

New Buildings Bridge over Towamba River SHI No: 4300139 Location: Wyndham LOS: State
CMP: No SHR: Yes Last Insp: 10/9/96
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: Currently being
repaired. Replacement of top cord
of truss with similar age member.

(146) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 147

APPENDIX 4 (Continued)
Heritage and Conservation Register

Old Marulan Town SHI No: 4300302 Location: Marulan LOS: State
CMP: No SHR: Yes Last Insp: Ongoing
Condition: Fair Statutory Applications: None
In Use? No, Vacant land. Activities/Changes: None

Old Nowra Road Bridge,


Shoalhaven River Road Bridge SHI No: 14236 Location: Nowra LOS: State
CMP: Yes SHR: No Last Insp: Not Available
Condition: Good Statutory Applications: None
In Use? Yes Activities/Changes: Vertical truss
member and bracing replaced in
December 1998 after accident.

Rossis Bridge SHI No: 4300156 Location: Goulburn LOS: State


CMP: No SHR: Yes Last Insp: 22/2/00
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: None

Stone Lined Channel Outlet, Federal Highway SHI No: 5187 Location: Lake George LOS: Not Assessed
CMP: No SHR: No Last Insp: 27/7/2000
Condition: Good Statutory Applications: None
In Use? Yes Activities/Changes: None

Thornes Bridge, Mulwaree River SHI No: 4300163 Location: Goulburn LOS: Regional
CMP: No SHR: No Last Insp: 2/99
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: None

Towrang Bridge & Culverts SHI No: 11022 Location: Towrang LOS:
CMP: No SHR: Last Insp: Not available
Condition: N/A Statutory Applications: None
In Use? Yes Activities/Changes: Not under RTA
ownership care or control. Will be
removed from S.170 register.

Truss Bridge over Crookwell River SHI No: 4300130 Location: Crookwell LOS: Regional
CMP: No SHR: No Last Insp: 4/6/98
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: None

Victoria Bridge, Stonequarry Creek SHI No: 19066 Location: Picton LOS: State
CMP: No SHR: Yes Last Insp: Not Available
Condition: Good Statutory Applications: None
In Use? Yes Activities/Changes: None

Yowaka Bridge SHI No: 4300515 Location: Eden LOS: State


CMP: No SHR: Yes Last Insp: 26/6/95
Condition: Fair Statutory Applications: None
In Use? Yes Activities/Changes: repairs to
concrete and post tensioning cables
after accident. Repairs completed
June 2000

(147) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 148

APPENDIX 4 (Continued)
Heritage and Conservation Register

SOUTH-WESTERN REGION ITEMS

Abbotsford Bridge, Murray River SHI No: 18250 Location: Curlwaa LOS: Regional
CMP: No SHR: No Last Insp: 4/6/97
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: Traffic signals
installed on approaches.

Barham Bridge, Murray River SHI No: 17676 Location: Barham LOS: State
CMP: No SHR: Yes Last Insp: 27/11/96
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: Emergency lift
span strengthening.

Barmah Bridge, Murray River SHI No: 11047 Location: Barmah LOS: Regional
CMP: No SHR: No Last Insp:30/11/97
Condition: Fair Statutory Applications: None
In Use? Yes Activities/Changes: None

Biggara Bridge, Murray River SHI No: 17476 Location: Biggara LOS: Local
CMP: No SHR: No Last Insp: Not Available
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: Upgrade guard
rail on approaches. Add timber piles.

Bringenbrong Bridge, Murray River SHI No: 17471 Location: Bringenbrong LOS: Local
CMP: No SHR: No Last Insp: 15/12/94
Condition: Good Statutory Applications: None
In Use? Yes Activities/Changes: None

Bungambrawatha Creek Bridge SHI No: 15 Location: Albury LOS: Not Assessed
CMP: No SHR: No Last Insp: 2/11/94
Condition: Good Statutory Applications:
In Use? Yes Activities/Changes:

Carrathool Bridge over Murrumbidgee River SHI No: 4300165 Location: Carrathool LOS: State
CMP: No SHR: Yes Last Insp: 12/11/96
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: None

Cobram Bridge, Murray River SHI No: 1334 Location: Barooga LOS: State
CMP: No SHR: Yes Last Insp: 14/3/95
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: Like for like
substructure repairs. Lift span
strengthening.

Coonamit Bridge, Wakool River SHI No: 4300142 Location: Swan Hill LOS: State
CMP: No SHR: Yes Last Insp: 11/3/96
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: Completion of
SLT deck. Pier repairs.

Coopers Bridge, Lachlan River SHI No: 4300164 Location: Willanthry LOS: Not Assessed
CMP: No SHR: No Last Insp: Not Available
Condition: Poor Statutory Applications: None
In Use? No Activities/Changes: None
RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 149

APPENDIX 4 (Continued)
Heritage and Conservation Register

Derringullen Creek Area SHI No: 20433 Location: Yass LOS: Not Assessed
CMP: SHR: No Last Insp: Not available
Condition: Good Statutory Applications: None
In Use? NA Activities/Changes: None

Echuca–Moama Road/Rail Bridge


over Murray River SHI No: 11064 Location: Moama LOS: State
CMP: No SHR: Yes Last Insp: 5/4/98
Condition: 5/4/98 Statutory Applications: None
In Use? Yes Activities/Changes: None

Euroley Bridge over Murrumbidgee River SHI No: 4300141 Location: Yanco LOS: Local
CMP: No SHR: No Last Insp: Not Available
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: None

Gee Gee Bridge, Wakool River SHI No: 4300138 Location: Murrabit LOS: State
CMP: No SHR: Yes Last Insp: 12/3/96
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: None

George Chaffey Bridge over Murray River SHI No: 18251 Location: Mildura LOS: Regional
CMP: No SHR: No Last Insp: 25/6/97
Condition: Good Statutory Applications: None
In Use? Yes Activities/Changes: Scour repairs
at NSW abutment.

Gonn Crossing, Murray River SHI No: 17675 Location: Murrabit LOS: Local
CMP: No SHR: No Last Insp: 25/7/96
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: None

Heywoods Bridge, Hume Dam SHI No: 7024 Location: Riverina Hwy LOS: Local
CMP: No SHR: No Last Insp: 17/12/94
Condition: Fair Statutory Applications: None
In Use? Yes Activities/Changes: None

Howlong Bridge, Murray River SHI No: 7026 Location: Howlong LOS: Regional
CMP: No SHR: No Last Insp: 26/3/99
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: Partial redecking.
Essential substructure repairs.

Indi Bridge, Murray River SHI No: 17470 Location: Indi LOS: Local
CMP: No SHR: No Last Insp: 9/12/96
Condition: Good Statutory Applications: None
In Use? Yes Activities/Changes: Guard rail
on approaches

(149) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 150

APPENDIX 4 (Continued)
Heritage and Conservation Register

Jingellic Bridge, Murray River SHI No: 17474 Location: Jingellic LOS: Regional
CMP: No SHR: No Last Insp: 16/12/94
Condition: Fair Statutory Applications: None
In Use? Yes Activities/Changes: None

John Foord Bridge, Murray River SHI No: 3608 Location: Corowa LOS: State
CMP: No SHR: Yes Last Insp: 17/12/93
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: Weep hole
repairs to truss bottom chords.
NSW approach correction.

Junction Bridge SHI No: 4300007 Location: Tumut LOS: State


CMP: No SHR: Yes Last Insp: Not Available
Condition: Fair Statutory Applications: None
In Use? Yes Activities/Changes: None

Mulwala Bridge, Murray River SHI No: 3606 Location: Mulwala LOS: Regional
CMP: No SHR: No Last Insp: 8/5/97
Condition: Fair Statutory Applications: None
In Use? Yes Activities/Changes: Traffic barrier
railing improvements

Nyah Bridge, Murray River SHI No: 17673 Location: Nyah LOS: Regional
CMP: No SHR: No Last Insp: 1/12/94
Condition: Good Statutory Applications: None
In Use? Yes Activities/Changes: None

Prince Alfred Bridge SHI No: 5172 Location: Gundagai LOS: Not Assessed
CMP: No SHR: No Last Insp: 17/11/94
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes:
Timber replacements

Robinvale Bridge, Murray River SHI No: 807 Location: Robinvale LOS: Regional
CMP: No SHR: No Last Insp: 23/1/95
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: Decking repairs.

Speewa Ferry, Murray River SHI No: 17685 Location: Speewa LOS: Local
CMP: No SHR: No Last Insp: Every 6 months
Condition: Good Statutory Applications: None
In Use? Yes Activities/Changes: Major overhaul

Swan Hill – Murray River Road Bridge SHI No: 17678 Location: Swan Hill LOS: State
CMP: No SHR: Yes Last Insp: 27/11/96
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: Emergency
lift span strengthening

(150) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 151

APPENDIX 4 (Continued)
Heritage and Conservation Register

Tintaldra Bridge, Murray River SHI No: 17473 Location: Tintaldra LOS: Regional
CMP: No SHR: No Last Insp: 16/12/94
Condition: Fair Statutory Applications: None
In Use? Yes Activities/Changes: None

Tocumwal Bridge, Murray River SHI No: 1335 Location: Tocumwal LOS: Local
CMP: No SHR: No Last Insp: 3/1/96
Condition: Good Statutory Applications: None
In Use? Yes Activities/Changes: NSW scour repair.

Tooleybuc Bridge, Murray River SHI No: 17674 Location: Tooleybuc LOS: State
CMP: No SHR: Yes Last Insp: 9/4/97
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: Truss and
substructure repairs. Replacement
(strengthening) of truss cross girders.
Lift span strengthening.

Towong Bridge, Murray River SHI No: 17472 Location: Towong LOS: Regional
CMP: No SHR: No Last Insp: 9/12/96
Condition: Good Statutory Applications: None
In Use? Yes Activities/Changes: Guard rail
on approaches.

Union Bridge, Murray River SHI No: 7025 Location: Albury LOS: Local
CMP: No SHR: No Last Insp: 2/6/96
Condition: Fair Statutory Applications: None
In Use? Yes Activities/Changes: None

Wee Jasper Bridge over Goodradigbee River SHI No: 4300140 Location: Wee Jasper LOS: State
CMP: No SHR: Yes Last Insp: 7/4/94
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: Timber
replacements

Wymah Ferry, Murray River SHI No: 17475 Location: Wymah LOS: Regional
CMP: No SHR: No Last Insp: Every 6 months
Condition: Good Statutory Applications: None
In Use? Yes Activities/Changes: None

(151) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 152

APPENDIX 4 (Continued)
Heritage and Conservation Register

WESTERN REGION ITEMS

Abercrombie Bridge over Abercrombie River SHI No: 4300162 Location: Tuena LOS: Local
CMP: No SHR: No Last Insp: 24/11/99
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: None

Beryl Bridge SHI No: 4300167 Location: Gulgong LOS: Regional


CMP: No SHR: No Last Insp: 26/10/99
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: CMP in
preparation.

Boonanga Bridge, Barwon River SHI No: 4300171 Location: Boomi (north) LOS: Local
CMP: No SHR: No Last Insp: Not Available
Condition: Not Available Statutory Applications: None
In Use? Yes Activities/Changes: None

Bridge over Turon River SHI No: 4300155 Location: Wallaby Rocks LOS: State
CMP: No SHR: Yes Last Insp: 26/10/99
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: CMP in
preparation

Collins Bridge, Namoi River SHI No: 9989 Location: Wee Waa LOS: Local
CMP: No SHR: No Last Insp: 1/12/99
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: None

Dangar Bridge, Barwon River SHI No: 4300143 Location: Walgett LOS: Local
CMP: No SHR: No Last Insp: 8/12/99
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: None

Holman Bridge, Lachlan River SHI No: 4300132 Location: Gooloogong LOS: Local
CMP: No SHR: No Last Insp: 20/4/99
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: None

McKanes Falls Bridge SHI No: 4300003 Location: Lithgow LOS: State
CMP: Yes (HC endorsed) SHR: Yes Last Insp: 18/5/98
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: None

Mudgee Overpass Road Cutting SHI No: 4697 Location: Marrangaroo LOS: Not Assessed
CMP: No SHR: No Last Insp: Not available
Condition: Fair Statutory Applications: None
In Use? NA Activities/Changes: None

Mungindi Bridge, Barwon River SHI No: 4300159 Location: Mungindi LOS: Local
CMP: No SHR: No Last Insp: 16/11/99
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: None

Paytens Bridge, Lachlan River SHI No: 4300166 Location: Collets Crossing LOS: Local
CMP: No SHR: No Last Insp: 13/4/99
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: None

(152) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 153

APPENDIX 4 (Continued)
Heritage and Conservation Register

Rawsonville Bridge, Macquarie River SHI No: 4300182 Location: Minore LOS: Regional
CMP: No SHR: No Last Insp: 25/10/99
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: CMP in
preparation

Road Bridge, Darling River SHI No: 3248 Location: Wilcannia LOS: Not Assessed
CMP: No SHR: No Last Insp: 27/8/99
Condition: Good Statutory Applications: None
In Use? Yes Activities/Changes: None

Scabbing Flat Bridge, Macquarie River SHI No: 4300179 Location: 4 km south of Guerie LOS: Not Assessed
CMP: No SHR: No Last Insp: 9/4/98
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: CMP in
preparation

Stone Culvert & Retaining Wall near “Emoh” SHI No: 4796 Location: Old Bowenfels LOS: Not Assessed
CMP: No SHR: No Last Insp: Not available
Condition: Good Statutory Applications: None
In Use? NA Activities/Changes: None

Victoria Pass Mitchell’s Pass SHI No: 4795 Location: Mt Victoria LOS: Not Assessed
CMP: No SHR: No Last Insp: Ongoing
Condition: NA Statutory Applications: None
In Use? NA Activities/Changes: None

Yamble Bridge, Cudgegong River SHI No: 4300180 Location: Goolwa LOS: Regional
CMP: No SHR: No Last Insp: 25/10/99
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: CMP in
preparation

Warroo Bridge, Lachlan River SHI No: 4300178 Location: West of Forbes LOS: Local
CMP: No SHR: No Last Insp: 25/10/99
Condition: Poor Statutory Applications: None
In Use? Yes Activities/Changes: CMP in
preparation

(153) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 154

APPENDIX 5
Species Recovery

Table 1: Status of RTA action taken to implement measures from the Microtis angusii (Angus’s Onion Orchid)
Species Recovery Plan, Sydney Region

Measures Action taken to implement measures Estimated Status


annual cost

Consider the impact of any activities Environmental Services Representative to advise NA No activity affecting
undertaken within areas under control of the Project Manager of the need to consider the M. angusii has been
RTA that are known to contain M. angusii or impact of proposed activities on M. angusii undertaken since
are potential habitat Project Manager to advise EIA Consultant of the endorsement of the
need to consider the impact of proposed activities Recovery Plan
on M. angusii
Environmental Assessor to ensure that the impact of
a proposed activity on M. angusii is considered in all
relevant Environmental Impact Assessments (EIAs)
Environmental Assessor to take known and potential
locations of M. angusii and likely impact on M. angusii
into account when preparing Decision Reports

Liaise with National Parks & Wildlife Service, RTA Recovery Team member to share information $750 Regular liaison occurring
Warringah Council, Pittwater Council and with other Recovery Team members, and update through Recovery Team
Ku-ring-gai Council to achieve and maintain records accordingly meetings. GIS established
a permanent record of the location of M. for the recording of
angusii populations and potential habitats location data

Ensure that roadworks/maintenance will Environmental Services Representative to advise NA Road maintenance
not cause destruction or degradation to Project Manager of the need to consider the impact contractors informed of
populations of M. angusii or potential habitat of roadworks/maintenance work on M. angusii the location of M. angusii.
Environmental Assessor to ensure that the impact No roadworks have been
of roadworks/maintenance work on M. angusii is proposed that may have
considered in all relevant EIAs an impact on the species
Environmental Assessor to take known and potential
locations of M. angusii and likely impacts on
M. angusii into account when preparing Decision
Reports

Ensure that all environmental personnel are Environmental Services Branch (ESB) to establish $1,124 GIS established for the
familiar with the location of M. angusii central database for sensitive sites, including known recording of sensitive
populations and potential habitat and potential locations for M. angusii populations locations. M. angusii has
not yet been mapped on
system
Completed. ESB to be
RTA Recovery Team Member to brief ESB on location $300 informed of any changes
of M. angusii population and potential habitat

Ensure that all site personnel are familiar RTA Recovery Team Member to provide information Transfield advised of
with the location of M. angusii populations to Transfield (via Asset Management) regarding $1,050 preferred weed control
and potential habitat identification of M. angusii known and potential and known locations of
locations of M. angusii populations and preferred M. angusii
weed control methods

(154) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 155

APPENDIX 5 (Continued)
Species Recovery

Measures Action taken to implement measures Estimated Status


annual cost

Ensure that all Environmental Impact ESB Representative to advise Project Manager of this NA No proposal affecting
Assessment surveys are conducted between requirement any M. angusii location
May and October Project Manager to advise EIA Consultant of this or potential habitat has
requirement been undertaken since
Environmental Assessor to ensure that EIA surveys the endorsement of the
were conducted between May and October in all plan
relevant EIAs
Environmental Assessor to take this requirement
into account when preparing Decision Reports

Notify NPWS of any new M. angusii ESB Representative to notify RTA Recovery Team $115 No new populations have
populations discovered Member upon becoming aware of any new M. been discovered
angusii populations discovered during any EIA or
other process
RTA Recovery Team Member to pass this information
onto NPWS coordinator of M. angusii Recovery Team

Contribute to targeted survey of M. angusii ESB Representative to notify RTA Recovery Team $115 No new populations have
to determine the full distribution of the Member upon becoming aware of any new M. been discovered since the
plant, as appropriate angusii populations discovered during any EIA or endorsement of the
other process Recovery Plan
RTA Recovery Team Member to pass this information
on to NPWS coordinator of M. angusii Recovery Team $525 No M. angusii surveys
RTA to provide in-kind contribution to M. angusii have been conducted
surveys being conducted by NPWS as appropriate since the endorsement
of the plan

(155) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 156

APPENDIX 5 (Continued)
Species Recovery

Table 2: Status of RTA action taken to implement measures from the Acacia pubescens (Downy Wattle)
Species Recovery Plan, Sydney Region

Measures Action taken to implement measures Estimated Status


annual cost

Identify existing and potential threats to Environmental Services Representative to visit site $525 Site visited and extent
the A. pubescens population at Beverly an identify existing and potential threats to the of population mapped.
Hills/Narwee on the F5 (north of population Awaiting information
Windarra Street) from Interlink Roads
regarding maintenance
regimes before finalising
existing and potential
threats

Develop and implement a threat and habitat Asset Services to develop a threat and habitat $1,500 Awaiting further
management program for the A. pubescens management program to be incorporated into information prior to
population at Berverly Hills/Narwee on the the Maintenance Plan for the F5, with advice developing threat and
F5 (north of Windarra Street) from Environmental Services Representative habitat management
Asset Services to ensure that the program is program
implemented

Monitor the A. pubescens population at ESB Representative to conduct at least an $525 Inspection completed
Beverly Hills/Narwee on the F5 (north of annual inspection of the population, including for 2000
Windarra Street) on a regular basis to assess photographic survey
the effectiveness of the threat and habitat Following each inspection compare inspection
management programs records and initiate corrective action if required

Assess development activities with reference Environmental Services Representative to advise NA No EIAs affecting
to the recovery plan, the EIA Guidelines for Project Manager of this requirement if aware of A. pubescens in 2000
A. pubescens and future advice from NPWS the proposed activity prior to EIA process since the endorsement
Project Manager to advise EIA Consultant of this of the Recovery Plan
requirement
Environmental Assessor to ensure that the recovery
plan, EIA guidelines and NPWS advice have been
considered in all relevant EIAs
Environmental Assessor to take this requirement
into account when preparing Decision Reports

Prepare or review any relevant During next review of the Maintenance EMP for $750 Environmental Services
environmental policies or management the F5, Asset Services to add references to the awaiting information
plans with reference to the recovery plans A. pubescens Recovery Plan with advice from regarding the
and any future advice from the NPWS Environmental Services Representative maintenance regime in
this location.
Interlink Roads reviewing
landscape plans with
reference to the Recovery
Plan

Forward information on all planning Environmental Services Representative to advise NA No planning decisions
decisions which affect populations of Project Manager of this requirement which affect populations
A. pubescens, including decisions that RTA Project Manager to forward the information of A. pubescens have been
protect habitat as well as those that to NPWS made since the
lead to reduction of habitat and/or endorsement of the
individuals, to the NPWS Recovery Plan

(156) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 157

APPENDIX 5 (Continued)
Species Recovery

Table 3: Status of RTA action taken to implement measures from the Grevillea caleyi (Caley’s Grevillea) Species Recovery Plan, Sydney Region
*Costs are yet to be determined because final recovery plans are not fully developed.

Measures Action taken to implement measures Estimated Status


annual cost

Drainage runoff from Ryland Track in Investigations to be made to determine controls Underway
Ku-ring-gai Chase National Park of runoff from other side of road

Sympathetic management of plants on Meeting held with maintenance contractor, who was Completed
roadways informed of appropriate maintenance techniques for
minimising damage to G. caleyi. Training day held for
Warringah Council

Management of roadworks near Bahai Review of Environmental Factors prepared. Underway


Temple Temporary fencing erected to protect remaining
plants. The cleared/weedy area in Garigal NP is
to be revegetated with good topsoil removed

Poster/ brochure Draft RTA brochure prepared Underway

Table 4: Status of RTA action taken to implement measures from the Eleocharis tetraquetra (Square-Stemmed Spike-Rush)
Species Recovery Plan, Mid North Coast Region

Measures Action taken to implement measures Estimated Status


annual cost

Site management of public land at Ongoing Ongoing


Boambee using the Precautionary Principle

Evaluate population size A flora specialist has been commissioned $500 Underway
and is to report findings on 24/8/00

Prepare maps A flora specialist has been commissioned $500 Underway


and is to report findings on 24/8/00

Mark sites The site has been marked and a sign $750 Underway
is to be drawn up to NPWS requirements

No adverse impacts from site Completed – Ongoing


management actions

Manage stock-piles of soil Completed $4,000 Ongoing

Maintain drainage patterns Completed $1,500 Ongoing

Monitor population Completed $1,500 Ongoing

Reconsider works if the population N/A – the population is expanding – Ongoing


is in decline

Control invasive weeds This is subject to NPWS advice and a $5,000 Underway and ongoing
strategy is to be ratified on 24/8/00

Environmental management plan Completed – Completed

Investigate translocation A strategy is yet to be developed $1,000 Under review

Research Research is subject to specialist study $500 Underway and ongoing


– Census data and report is due on 24/8/00 $1,000
– Population dynamics $1,500
– Disturbance regimes

Establish ex situ collections Collections are subject to recommendations $500 Underway


from the specialist study

(157) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 158

APPENDIX 6
Advisory Bodies

Roads & Traffic Advisory Council As at 30 June 2000 the Council comprised:
Established under the Transport Administration Act 1988, the Roads Mr Paul Forward (Chair) – RTA
and Traffic Advisory Council advises the RTA and the Minister for Chief Supt Ron Sorrenson – NSW Police Service Traffic Branch
Roads on: Mr David Bowen – Motor Accidents Authority
– The promotion of traffic safety Mr Laurie Glanfield – Attorney General’s Department
– Improvements in the movement of traffic Mr Garry Payne – Department of Local Government
– Improvements in the movement of freight Mr John Hall – Department of Transport
– Requirements of vehicle drivers Dr Andrew Wilson – NSW Health, and
– Requirements for roads and vehicles Mr Lindsay Wasson – Department of Education and Training.
– Promotion of industrial development, primary production and
tourism in relation to roads and traffic
– Protection of the environment in relation to roads and traffic 3X3 Committee
– Roads and traffic legislation, and This independent committee, representing the community, monitors
– Any other matter relating to roads and traffic that the Council expenditure to ensure ‘3x3’ funds are spent on road projects in
considers appropriate accordance with criteria contained in the legislation.
Membership of the Roads and Traffic Advisory Council is by The independent committee in 1999/2000 consisted of:
appointment by the Minister for Roads and comprises representatives – Mr Don Mackay AM (Chair) – Senior Partner, Deacons, Graham &
from various organisations. As at 30 June, the Council comprised: James, former President NRMA and former Chairman NSW Police Board
– Mr Bill Wallace (Chair) – the road freight industry – Councillor Allan Fifield OAM – Culcairn Council, Grants Commissioner
– Mr George Karagiannakis – NRMA Limited and Past President Shires Association
– Councillor William Bott – Local Government and Shires Association – Mrs Audrey Hardman OAM – Past President Country Women’s
– Mr Warrick Irvine – Labour Council of New South Wales Association, Deputy Chair NSW Women’s Consultative Committee
– Emeritus Professor Ron Huckstep – the medical profession and Co-Chair Rural Women’s Network, and
– Mr Robert Lynn – Financial Services Industry Leader,
There are also four ex-officio members, the:
PricewaterhouseCoopers and Chairman Australian Audit Standards
– Chief Executive of the RTA
Board.
– Director-General of the Department of Urban Affairs and Planning
– Director-General of the Department of Transport
– Commissioner of the New South Wales Police Service Western Sydney Roads and Transport Committee
This independent committee, representing the community, was
established in 1996 to monitor and verify expenditure of road funds
Government Agencies’ Road Safety Council (GARS)
approved for western Sydney by the Minister for Roads. The NSW
The previous Road Safety Advisory Council was dissolved in December,
Government’s commitment to the people of western and south-
1999 and replaced by a new committee:
western Sydney to spend an average of $160 million annually on road
The Government Agencies’ Road Safety Council, chaired by the RTA and road-related public transport infrastructure works in western
Chief Executive, is a forum for high-level senior managers from Sydney was achieved in 1999/2000.
government agencies involved in road safety practice to meet and
The independent committee in 1999/2000 consisted of:
discuss their priorities and programs. It aims to capture the synergies
– the late Mr Lindsay Barnett (Chair) – Chairman, Coal Compensation
available from ensuring that all agencies with road safety initiatives are
Review Tribunal
kept informed of the whole range of road safety activity across the State.
– Mr Marzi De Santi – Manager Transport and Economics, Nominee of
NRMA
– Mr Jim Angel – Deputy Mayor, City of Blue Mountains, Nominee of
Western Sydney Regional Organisation of Councils, and
– Mr Mike Veysey – RTA Advisor to the Committee.

(158) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 159

APPENDIX 6 (Continued)
Advisory Bodies

Road Traffic Noise Committee Bicycle Advisory Council


Meets every three months and produces an annual report of progress The Council was established to provide the RTA with advice and
towards achieving Road Traffic Noise Taskforce recommendations. recommendations on all bicycle related matters; facilitate all activities
Members: of the RTA which impinge on bicycling; assist in the efficient
– Ms Jay Stricker (chair) – RTA coordination of effective programs to benefit cyclists throughout the
– Ms Katye Jackett – Cabinet Office public and private sectors; facilitate, but not necessarily undertake,
– Mr Ballabh Acharya – Department of Housing provisions for cyclists by all levels of government; assist in the
– Mr Norm Smith – Department of Local Government development and ongoing review of RTA strategic plans for bicycles;
– Ms Karen Wyatt – Department of Transport and provide an effective consultative forum for cyclist organisations
– Ms Suzi Dryden – Department of Urban Affairs and Planning and Government.
– Mr Geoff Mellor – EPA
As at 30 June 2000, the Council comprised six ex-officio members and
– Ms Debra Rae – Local Government and Shires Associations, and
chaired by Cr Patricia Gould – Local Government and Shires Association.
– Mr Murray Johnson – Rail Access Corporation.
The organisations represented by members are:
– Local Government and Shires Association
RTA Heritage Committee
– Bicycle NSW
Advises on proactive management of heritage; reviews and endorses
– Newcastle Cycleways Movement
recommendations on the management of our heritage portfolio and
– Department of Transport
develops appropriate policy in heritage management areas.
– NSW Police Service, and
Membership was made up of representatives from the RTA, National
– RTA.
Trust, Institution of Engineers Australia, the NSW Heritage Office and
the community.
Road Freight Advisory Council
The Council provides a consultative forum for industry and government
Environment Council
to consider matters related to the development, coordination, planning,
Committee membership has expired and is currently under review in
regulation and operation of road freight transport services in NSW.
accordance with Premier’s Memorandum No. 99-3 Government Boards
and Committees. Council members are:
– Mr Bob Angus – (Chairman), Boral Transport
– Mr Warrick Irvine – Transport Workers’ Union
Department of Urban Affairs and Planning Local Government
– Mr David Pierce – NatRoad Limited
Liaison Committee
– Mr Robert Gunning – Livestock Transporters Assn of NSW
A statutory committee established under Section 20 of the
– Mr Joe Sepos – Livestock Transporters Assn of NSW
Environmental Planning and Assessment Act, 1979. Its function is to
– Mr Geoff Tinney – NSW Road Transport Assn
advise the Minister for Urban Affairs and Planning on a range of issues
– Mr Terry Dene – NSW Road Transport Assn
including:
– Mr Paul Campbel – Charter Freightlines Pty Ltd
– effective coordination of public authority and local council activities
– Mr David Anderson – NatRoad Limited
and programs
– Mr Peter Lewis – Mr John Morris, Mr Trevor Smith – regional road
– policies and procedures relating to the function of councils under
freight groups nominees, and
the Environmental Planning and Assessment Act
– Mr Phil Leeds – RTA adviser.
– information, advice and procedural needs of councils in connection
with their responsibilities under the Environmental Planning and
Assessment Act, and
– local environmental planning policies and procedures.
The RTA is represented on the committee by the General Manager,
Environment and Community Policy.

(159) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 160

APPENDIX 7
Senior Executive Performance Statements (Level 5 and above)

Name: Paul Forward Improved performance of Occupational Health & Safety (OH&S),
Position: Chief Executive the rehabilitation of injured staff and the management of workers
Level: 8 compensation claims has continued to result in significant cost savings,
Period in position: 1999/2000 reduced workers compensation premiums and improved workplace
Total Remuneration Package: $265,000 safety. A corporate OH&S standard and audit instrument has been
implemented and extensive work has been undertaken on refining
Mr Forward was appointed to the position in December 1999, the RTA’s project management of OH&S on contract works.
and occupied the position since June 1999 on an acting basis.
Mr Forward led the development and implementation of key programs Name: Mike Hannon
in the RTA’s core business areas of road network infrastructure, road Position: Director, Road Network
safety and road user management and traffic management. All Infrastructure
programs were delivered as per prearranged targets. Level: 6
Period in position: March 2000 – June 2000
Mr Forward led organisational improvements to achieve the Total Remuneration Package: $210,985
Government’s efficiency targets, with savings directed back into the Performance Payment 1998-1999: $6,000 (SES Level 5 at the time
roads program through the implementation of structural realignment of payment)
and initiatives in road maintenance service delivery. Rural employment
strategies employed were the transfer of the telephone customer Criteria applied for Strong performer – meets
service operations to a Call Centre in Newcastle, Cashback relocating to performance payment: objectives in performance
Dubbo, the Enforcement Litigation unit transferring to Grafton and the agreement
Vehicle Infringement Processing Unit transferring to Glen Innes. Mr Hannon was seconded to the position on 1 May 1999 and was
Successful implementation of the Goods and Services Tax on tollway appointed to the position in March 2000.
increases and impact on contracts and provision of services. The Y2K Mr Hannon developed strategic priorities and consolidated the role of
project was also successfully executed with full compliance. RNI Directorate within the framework of the RTA's funder/purchaser/
Mr Forward led the development and maintenance of the State Road provider business model.
network, focusing on strategic routes to promote economic growth, Mr Hannon continued to determine strategic road network priorities
providing safer roads and contributing to a totally integrated to meet Government objectives and managed the development of
transport solution. major projects. Major road infrastructure commitments included the
Initiatives accomplished included the development of a program to completion of the construction of the Eastern Distributor, the
provide suitable and reliable freight corridors and the provision of road Bulahdelah to Coolongolook freeway, and the continuation of
access to inter-modal freight terminals and ports, Road Safety 2010 construction works on the M5 East Motorway. Under Mr Hannon's
with a key focus on reducing road trauma due to speeding, drink direction and client management a number of strategic projects
driving and fatigue and the NSW Bike Plan 2010 with a key focus on progressed through the planning stages including the Sydney Cross
improving facilities for cyclists and making it safer to cycle. City Tunnel, the Lane Cove Tunnel, Liverpool Parramatta Transitway
and the Western Sydney Orbital.
Development of road safety initiatives by the RTA were led by
Mr Forward and road safety programs co-ordinated across Government The implementation of Action for Transport 2010 continued ensuring
agencies that contributed to improved overall road safety outcomes. the projects of strategic priority including the commencement of the
Traffic management initiatives implemented included the official Great Western Highway – Blue Mountain projects and the Yelgun to
opening of the Transport Management Centre, improvements to the Chinderah project on the Pacific Highway. The Rebuilding Country
SCATS system, variable message and variable speed limit signs, Roads Program continued to focus on the road infrastructure
electronic tolling and other intelligent transport systems technology. investment towards road transport industry needs, including
intermodal transport. As a part of this initiative Country Timber Bridge
Major road infrastructure commitments included the completion of Program proceeded with 36 of 140 bridges completed. A number of
the construction of the Eastern Distributor, and the continuation of route strategies for key routes were prepared including the Princes
construction works on the M5 East Motorway. Incident management Highway and the Windsor Road.
on major routes continued to be a priority with 24 hour traffic
management response capability. Other major initiatives include ensuring the achievement of maximum
value for money from the development and delivery of infrastructure
The management of environmental issues continued to be a major maintenance using business like principles and practices, and the
focus. The second RTA Environment Report was released and the ongoing assessment of achievements of standards and targets applied
environmental and heritage aspects of RTA contracts were through reporting on the trends and outcomes of the Infrastructure
strengthened to meet or exceed the requirements of the Construction Maintenance program.
Policy Steering Committee Guidelines.
Mr Hannon implemented the Roads Maintenance Reform Package to
Initiatives undertaken in the Motor Registry include the extension of ensure the delivery of value for money service through the introduction
access to services by using Internet technology, extending the of Single Invitation Contracts arrangements for maintenance works and
Government Access Centre concept, improvements to the standard of the mandatory pre-qualification scheme for Councils and RTA Road
driver licensing in NSW including a Graduated Licensing Scheme, Services. Enhanced requirements for environmental management on
trialing a hazard perception test system for novice drivers and an projects as well as OHS requirements in contracts were implemented.
upgraded heavy vehicle driver test.
Mr Hannon successfully negotiated the National Highway Performance
Agreement as well as implemented the recommendations of the Report
on the Review of the Roads Act. The Urban and Regional Design
Practice Notes were finalised and implemented.

(160) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 161

APPENDIX 7 (Continued)
Senior Executive Performance Statements (Level 5 and above)

Name: Chris Ford country roads. Public education campaigns for both road safety and
Position: Director, Traffic and Transport traffic management were again a feature of the year’s programs.
Level: 5 Mr Ford satisfactorily built partnerships on a number of major traffic and
Period in position: 1999 – 2000 road safety issues, with stakeholders such as the Sydney City Council,
Total Remuneration Package: $161,304 developers, STAYSAFE, the NSW Police Service and local government.
Performance Payment 1998-1999: $6,000 The development of the road event, route and venue traffic operations
Criteria applied for Strong performer – meets plans for the Sydney 2000 Olympic and Paralympic Games also required
performance payment: objectives in performance cooperation and consultation with ORTA, OCA and SOCOG. A review
agreement during the year of the Road Safety and Traffic Management Program,
As Director Road Safety and Traffic Management until February 2000 conducted by the Premier’s Department for the Council on the Cost and
and subsequently as Director Traffic and Transport, Mr Ford successfully Quality of Government, resulted in a favourable report.
managed and implemented programs to improve road safety and
traffic management across NSW. Specific achievements in 1999/2000 Name: Peter Scarlett
included successful transport arrangements for major events and Position: Director, Finance
Olympic Games test events, improved management of incidents, Level: 5
priority for buses, the launch of Action for Bikes - BikePlan 2010 and Period in position: 1999 – 18 June 2000
Road Safety 2010 and improved road user programs addressing Total Remuneration Package: $169,938
speeding, driving impaired and fatigue. Performance Payment 1998-1999: $12,000
Criteria applied for Outstanding performer – exceeds
Mr Ford played a major role in the planning and implementation of the performance payment: Chief Executive’s expectations –
traffic and transport arrangements for major events and in particular, has capability for position of
the Sydney 2000 Olympic and Paralympic Games test events and the increased accountability
Torch Relay. Major events included the highly successful New Year’s Eve
and Australia Day celebrations, many parades and festivals and the Mr Scarlett led the delivery of a range of projects which have resulted
Corroboree 2000 and Walk for Reconciliation across the Sydney in improved efficiencies and savings.
Harbour Bridge, for which the RTA received a commendation from the Projects undertaken during the year included the assessment of the
Premier. Olympic test events included the trial Marathon and Triathlon, impact of the Goods and Services Tax on RTA’s operations and
test events at all venues, the Royal Easter Show and major tests for implementation of financial system changes to deal with the Y2K issue.
Stadium Australia, such as the NRL Grand Final and State of Origin
Mr Scarlett developed contemporary commercial and operational
matches and Bledisloe Cup and Tri-Nations rugby union, several of
pricing and accounting policies. Further enhancements were made to
which attracted crowds of over 100,000.
the commercially based financial reporting framework
Mr Ford’s achievements in incident management included the
Risk Management procedures and policies were further strengthened.
Transport Management Centre commencing operations, the
Mechanisms were implemented for the formalisation of the status of
appointment of Traffic Commanders to assume primary responsibility
land under road and improvements for the management of vacant
for traffic management around incident scenes on major roads and the
road corridor land. This year also saw the full implementation of the
introduction of a Traffic Emergency Patrol service for motorists along
use of Purchasing Cards as an ordering and payment mechanism.
major routes in and around Sydney. Mr Ford led other initiatives to
improve the reliability of traffic flow, including improvements to the The RTA’s 2000/2001 Budget was developed and the balance between
SCATS coordinated traffic signal system, variable message and variable the RTA’s competing objectives and across core functions was
speed limit signs, electronic tolling and other intelligent transport determined. In accordance with the NSW Government Strategic
systems technology. Management Cycle, timely and accurate advice was provided for the
State Budget, the RTA’s annual Accounts and other reporting
Mr Ford also led enhancements to bus priority, including additional bus
requirements.
and transit lanes, particularly in comprehensive schemes in the Sydney
CBD and associated with the Eastern Distributor, the colouring of bus
Name: David Stuart-Watt
lanes red to make them easily visible to motorists, and a pilot bus
Position: Director, Client Services
passenger information system for the northern beaches.
Level: 5
Mr Ford developed and began implementation of Action for Bikes – Period in position: 1999/2000
BikePlan 2010, integrated with Action for Transport 2010. BikePlan 2010 Total Remuneration Package: $169,938
was prepared in consultation with the Bicycle Advisory Council and Performance Payment 1998-1999: $9,000
other stakeholders, with a key focus on improving facilities for cyclists Criteria applied for Excellent performer – exceeds
and making it safer to cycle, through the creation of a network of performance payment: Chief Executive’s expectations
cycleways in Sydney and in regional areas.
Mr Stuart-Watt successfully established Client Services Directorate as
As Director Road Safety and Traffic Management, Mr Ford the RTA’s principal agent in managing the provision and procurement
implemented a speed management and road user safety program, of road transport services with emphasis on ensuring value for money,
consistent with Road Safety 2010 which was launched in November integrating programs at the local level, and achieving consistency and
1999, to reduce the incidence of speeding, driving while impaired and implementing best practices in the delivery of programs and projects.
driver fatigue. Automatic digital speed cameras were introduced, in
Important milestones in achieving these outcomes have been the
conjunction with the NSW Police Service, on lengths of road identified
establishment of ‘Centres of Excellence’ in project and contract
with a high incidence of speed-related crashes. The enhanced management, asset management, pavement technology and
enforcement program with the Police Service was also continued. environmental services; securing quality certification to ISO 9000
Mr Ford led programs to improve the safety of roads, included the standards for the integrated project management system and
treatment of accident blackspots, and with particular emphasis on environmental management system; benchmarking of project
management activities against Australian and international
organisations; and facilitating the introduction of Single Invitation
Contracts for road maintenance across the State.

(161) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 162

APPENDIX 7 (Continued)
Senior Executive Performance Statements (Level 5 and above)

The core programs of road development, road maintenance, road Mr Fraser continued his senior role on the RTA’s Single Bargaining Unit
safety and traffic management amounting to $1.62 billion were involved in high level industrial negotiations with the unions/staff
delivered. This included the timber bridge replacement, rebuilding associations during the year. He also continued to play an active part in
country roads, bicycles, and Western Sydney roads and transport the RTA’s overall Change Management Program throughout 1999/00.
programs.
Name: Sue Sinclair
Significant accomplishments include the completion of the Bulahdelah Position: Director, Road Safety and Road
to Coolongolook Deviation, the Taree and Tyndale Bypasses, and User Management
sealing of major roads including the Kamilaroi Highway, and the Level: 5
Monaro Highway south of Bombala. Some of the major works Period in position: May 2000 – June 2000
completed in Sydney include the M5 Motorway duplication between Total Remuneration Package: $174,890
Beverly Hills and Revesby, the Cowpasture Road from Elizabeth Drive to
Horsley Drive, the City West Link 3, and the replacement of timber Ms Sinclair led the integration of road safety strategies with the
culverts on the Putty Road. management of road users since May 2000. Regional forums were
initiated to obtain community and road user input into the development
Road safety behavioural programs successfully delivered through of strategies to underpin the objectives of Road Safety 2010.
increasing use of variable message signs and speed cameras at strategic
locations, and partnership with local Councils. A load restraint training package was developed in consultation with
the transport industry and will be introduced as part of the national
Mr Stuart-Watt has ensured that key Government and client priorities reform agenda of the National Road Transport Council (NRTC).
were delivered on schedule and to budget. His leadership during a
period of major organisational change has been instrumental in The new Graduated Licensing Scheme, aimed at improving the skills
transforming the Directorate into a commercially focussed business, of novice drivers, was finalised for introduction on 1 July 2000. This
particularly the development of a client and customer service ethic included the development of comprehensive handbooks, media
among staff. campaigns and information for industry and other stakeholders.
Final preparations were undertaken for the introduction of the storage
Name: Ulf Fraser of photographic images on DRIVES to increase the integrity of the
Position: Director, Operations licensing system.
Level: 5
Ms Sinclair played a key role in planning and implementing RTA's
Period in position: 1999/2000
contribution to support the Sydney 2000 Olympic and Paralympic Games.
Total Remuneration Package: $169,938
Performance Payment 1998-1999: $9,000
Criteria applied for Excellent performer – exceeds
performance payment: Chief Executive’s expectations
Following adoption by the RTA of a funder/purchaser/provider
organisational model, Mr Fraser focussed primarily throughout 1999/00 CES/SES Positions and Performance
on the establishment of RTA Operations as a viable statewide business
able to operate in open markets, and capable of winning work from Total CES/SES Total CES/SES
internal and external clients. Level End of previous year End of current year
He has led the development and implementation of the systems 6 1 1
infrastructure needed for successful participation in a competitive 5 4 5
environment. He has also led the development of a commercially 4 6 5
attuned culture across RTA Operations based on integrity, innovation, 3 13 15
customer focus and achievement of financial targets. 2 14 13
He paid particular attention during this period to Road Services, the 1 2 1
branch most subject to competition and which provided $36M of the CEO under S.11A* 1 1
$59M overall financial surplus achieved from the successful delivery of Total 41 41
works and services to the value of $774M in 1999/00. While the vast
*CEO position listed under S.11A of the Statutory and Other Offices
bulk of this income came from internal clients, some $21M was earned
Remuneration Act 1975, not included in Schedule 3A of the Public
by the Road Services, Technical Services, Fleet Services and
Sector Management Act 1988.
Environmental Technology branches from external clients. The surplus
achieved enabled the RTA to fund some works and services across the Number of positions filled by women in the current year is 5.
program areas earlier than would otherwise have been the case. Previous year 5.

Initiatives successfully completed during the year in the Driver and


Vehicle Services branch included relocation of all telephone customer
service operations to a new consolidated Call Centre in Newcastle
together with the Help Desk for the DRIVES computer based
registration and licensing system. Two new Motor Registries were also
opened at Wetherill Park and Rockdale.

(162) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 163

APPENDIX 8
Internal Audit

During the year the internal audit function was integrated into a newly Financial and Operations Audit focussed on identifying and managing
created branch called Control Management Services (CMS). risks. Systems, activities and asset categories identified as high risk were
targetted during the year. Major reviews included the administration of
A major driving force in the creation of CMS was the growing public roadworks carried out by local councils on the RTA’s behalf and of three
focus on the issue of Corporate Governance which has been broadly of the RTA’s seven regional administration centres.
defined as “a process used for the effective management of the total
risks of a business in order to optimise value for the Stakeholders”. Engineering Audit has undertaken both system and compliance audits
on projects from the stage of concept to post-completion. The audits
The creation of the CMS Branch facilitates the necessary coordination identified significant opportunities for improvements in systems,
and integration of a range of functions related to the Corporate processes and procedures within the RTA and service providers. Some
Governance issue, ie of the major audits undertaken were on projects such as the M5 East,
– Critical Control Management the Transport Management Centre, Ballina Bypass, M4 Widening,
– Internal Audit, Pacific Highway – Wang Wauk to Bundacree Creek and Council
– Investigations, and Management of RTA funded projects.
– Corruption Prevention.
All reported allegations of internal corruption are investigated by the
This in turn facilitates the provision of effective and efficient support Investigations Section. Proven matters are forwarded to RTA senior
and advice to the CEO and senior management in meeting the greater management for disciplinary considerations and recommendations are
levels of accountability required in regard to identifying, assessing and made to line management to address any weaknesses or areas of
controlling “the total risks” associated with the operations of the concern relating to policies, procedures or controls highlighted by the
Authority. investigations.
In this regard the newly developed Critical Control Management The Investigation Section was expanded and refocussed during the
(CCM) process is the focal point of our efforts. year to enable it to more fully address allegations of external fraud
CCM has as its aim the achievement of the following two objectives: impacting on the motor registry environment. Outcomes from these
– to raise line management’s awareness of their responsibilities in matters are primarily referred to the NSW Police for investigation and
regard to ensuring that the businesses for which they are responsible RTA senior management to address any policy, procedure and control
operate in an appropriately controlled environment, and issues.
– to provide a tool/process to enable management to satisfy themselves The Corruption Prevention Section continued to provide research,
that the critical controls within their operations remain appropriate advice and education initiatives to facilitate the RTA’s commitment to
and operate on an on-going basis. mandatory ethical, probity and performance standards as expected by
The CCM process generally involves line management working with the public, executive management and Government. Highlights of its
CMS staff to identify: activities during the year included:
– the critical functions within the business – the conducting of seminars around the state with new and existing
– the major risks which exist within these critical functions staff as part of their induction or in response to identified needs,
– controls to address these major risks, and investigations or organisational changes
– a means by which line management can confirm that the controls – working collaboratively with Road Safety and Road User
continue to operate on an ongoing basis. Management, to produce a Data Integrity and Customer Service
video and case studies, which were incorporated into the High Risk
The project is currently being implemented in the Road Safety & Road Transactions training package and delivered to all registry staff
User Management business and will eventually be implemented – probity audits of contracting processes, particularly large
throughout the Authority. infrastructure projects, and
The internal audit function consists of three sections, Information – providing advice on ethical issues in the workplace to many different
Technology (IT), Engineering and Financial and Operations. staff members. Advice matters and investigation data fuelled research
into such areas as contracting and gifts/benefits.
IT Audit had three areas of major focus during the year, ie:
– pre-implementation reviews of new initiatives within the driver and A further highlight during the year was that the section won the
vehicle systems including Registration Renewals using Internet inaugural NSW Premier’s Award in the Ethics category.
facilities, Graduated Licensing System and online interface with the
Registry of Births, Deaths and Marriages
– review of contract negotiation and scoping study for a proposed
Integrated Management System, and
– review of computer system changes in relation to Year 2000 and GST
as well as other major system upgrades.

(163) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 164

APPENDIX 9
Risk Management

General
The risk management focus in 2000 was the reduction of risk exposures
associated with the engagement of contractors providing professional
services to the RTA. New standard contracts for engagement of
contractors were developed, clearly defining indemnification and
insurance requirements, and made available on a centralised database
for use by project managers.

Insurable Risks

Figure 17 – Workers Compensation Premium Costs Figure 18 – Motor Vehicle Premium and
and Claims Frequency Motor Vehicle Accident Claims Frequency

$20 18 20
16.9
$2.00

16.0
15.7
14.3
13 13.4
Motor Vehicle Premium Cost ($millions)

$15 15
$1.50
$14.15

$1.50

100 vehicles
11.4 11.5

Claims per
11.1 12
$1.54
Premium Cost ($millions)

$1.31
10
100 employees

$1.28
$1.26
Claims per
$10.14

$10 10
$11.09
$9.70

$1.00
$8.98

$5 5
$0.50

$0 1995/96 1996/97 1997/98 1998/99 1999/00 0 $0.00 0


Estimate Estimate Estimate 95/96 96/97 97/98 98/99 99/00
Estimate Estimate

Premium Cost ($millions) Claims per 100 employees Motor Vehicle Premium Cost ($millions) Claims per 100 Vehicles

Frequency of claims has fallen by over 40% when compared to The number of claims per 100 vehicles has fallen by over 19% when
1995/96. Premium costs appear to have peaked in 1995/96 and have compared to last year. Premium cost remains low and it is estimated to
remained below that level in the following years. This improvement is be 2.3% less than in 1998/1999.
the direct result of senior management's commitment to improving
Note: Premium costs are expressed as constant dollars using Sydney CPI
performance in the areas of OHS & Rehabilitation.
Note: Premium costs are expressed as constant dollars using Sydney CPI

(164) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 165

APPENDIX 9 (Continued)
Risk Management

Property Liability Insurance Premium

Figure 19 – Property Insurance Premium Figure 20 – Liability Insurance Premium

2.00 15
$1.90

$13.76

$13.43
$1.78

$12.16
12
1.50

$10.44
Premium Cost ($million)
$1.34

$1.34
Premium Cost ($million)

$1.23

1.00
$7.11

0.50
3

0.00 0
95/96 96/97 97/98 98/99 99/00 95/96 96/97 97/98 98/99 99/00

Premium Liability Premium

The 1999/2000 premium has reduced by over 8% when compared to The 1999/2000 liability insurance premium has decreased by 2.4%
1998/1999 due to low claims history. when compared to the previous year due to the RTA's focus on
reducing this category of risk exposure and improving claims
Note: Premium costs are expressed as constant dollars using Sydney CPI
management. However, increased community awareness of litigation
processes will require a maximum effort if future premium costs are to
be contained.
Note: Premium costs are expressed as constant dollars using Sydney CPI

(165) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 166

APPENDIX 10
Staffing

Staff Numbers – 1995/96 to 1999/2000 GREAT Appeals


Six promotional appeal were lodged with the Government and Related
Total EFT* Numbers Employees Appeal Tribunal (GREAT). Three appeals were successfully
Year Salaried Wages Casual Total defended by the RTA, two were withdrawn and the other is proceeding.
Staff Staff Staff Staff Reinstatement applications
On one occasion GREAT found that a staff member had not been
1995/96 4,224 2,200 469 6,893 unfairly dismissed. This matter has been appealed to the Court of
1996/97 4,128 2,196 334 6,658 Appeal and is yet to be decided. Another matter where a staff member
has been reduced in rank has not been finalised under GREAT.
1997/98 4,163 2,116 346 6,625
1998/99 4,368 1,893 238 6,499
1999/00 4,374 1,870 181 6,425 WORKERS COMPENSATION
Figure 21 – Workers compensation claims performance
The RTA employs full time, part time and casual staff. Equivalent full
$600 12
time* staff at 30 June 2000 was 6,425, or 1.1% less than at 30 June
1999. Total staff numbers decreased by 468, or nearly 7%, in the last
five years to 30 June 2000.

$500 11.5

WORKPLACE RELATIONS
Enterprise bargaining
Nearly 40% of staff are covered by four enterprise agreements.
11
These cover professional engineers, wages staff, wages staff working $400

Claims per 100 staff


in Broken Hill and traffic signals salaried staff.
Liability per staff

The Wages Classification Structure working party continued negotiations


throughout the year, and is finalising the methods to implement the 10.5
$300
structure in the RTA.
Communication and consultation
Consultative groups representing management, spokeswomen, grievance
10
officers and unions discussed matters under review, sought opinions to $200
proposals including the implementation of outcomes resulting from
enterprise bargaining, change management and workplace reforms.
Movements in salaries, wages and allowances 9.5
The Public Service Association of NSW (PSA) obtained sector-wide salary $100
increases totalling 16% to cover the period January 2000 to July 2003.
Increases were passed on to classifications in the RTA covered by the PSA.
$0 9
Unions covering other staff in the RTA are currently negotiating similar 1997/98 1998/99 1999/00
increases through enterprise bargaining.
Industrial relations policies and practices
The RTA introduced an Award to cover staff redirected into other duties,
including working for ORTA, during the Olympic and Paralympic Games
and implemented the conditions for staff volunteering for the Games, Liability per 100 staff Claims per 100 staff
Notes:
as negotiated by Premier's Department.
1. Figures shown are as at the end of the 4th quarter
Two new awards are currently being negotiated with the PSA – the
Crown Employees (Roads & Traffic Authority of NSW – Salaried Staff Claims liability figures are amounts paid plus estimated future payments
Conditions of Employment) Award 2000, and the Crown Employees for claims in the reporting period. The estimated amounts are subject to
(Roads & Traffic Authority of NSW – Unified Salary Scale) Award 2000 change as claims management progresses.
(USS Award). These will replace the Crown Employees (Roads & Traffic
Authority of NSW) Officer's Salaries and Conditions Award.
Sick leave during the year increased by 9% after a reduction of 12% in
the previous year. During the year a total of 48 working days were lost
through industrial action by staff. This is compared to 231 working days
lost because of industrial action in the 1998/99 financial year,
a reduction of 79%.

(166) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 167

APPENDIX 10 (Continued)
Staffing

EEO STRATEGIES 2000/2001


Our ongoing EEO programs will continue to be implemented and
improved in 2000/2001 and beyond. Our initiatives will include:
– ensuring our position as a best practice EEO organisation is maintained
and enhanced during a major review of the RTA, through the Change
Management Program Stage 2
– continuing to provide funding to the community-based knowledge
testing program in Aboriginal communities. Funding will provide more
resources at existing centres and establish other centres in areas with
high Aboriginal populations
– implementing approved actions under the Disability Action Plan
2000/2004
– promoting the reviewed and enhanced Employee Assistance Program
(EAP) including the new managers’ helpline
– developing and delivering Aboriginal Cultural Awareness Training
with components on Aboriginal ageing and disability issues
– recruiting Aboriginal trainees, including ATSI people with a disability,
in motor registries, business administration areas and the Newcastle
Call Centre
– replacing the Aboriginal Customer Service Traineeship Scheme (ACSTS)
with a nationally accredited NSW registered traineeship program. Offer
up to eight positions in regional and metropolitan locations. Expand
the trainee Customer Service Officer program and place new positions
in registries where high populations of Aboriginal people exist,
including Dubbo, Blacktown, Coffs Harbour, Lismore, Gunnedah,
Wagga Wagga, Albury and Batemans Bay
– ensuring completion of up to 14 Pedestrian Access and Mobility Plans
(PAMPS) to assist people with a disability
– evaluating the Women's Strategy in the context of the major structural
review underway and to update it to provide employment opportunities
for women, people with a disability and/or older people
– identify options to effectively address Aboriginal road safety issues across
NSW and develop and deliver Aboriginal road safety programs, and
– continuing to identify opportunities for naming and/or renaming of
bridges and roads to reflect Aboriginal history and the refurbishment
of existing signs. Undertake relevant consultation with Aboriginal
communities and local councils.

(167) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 168

APPENDIX 10 (Continued)
Staffing

Table 1 Percent of Total Staff by Level

Subgroup as % of Staff at each Level

EMPLOYMENT LEVEL TOTAL STAFF Men Women Respondents to


(Number) EEO Survey

< $26,276 53 68% 32% 6%2


$26,276 – $38,582 2,528 78% 22% 50%
$38,583 – $48,823 2,074 56% 44% 68%
$48,824 – $63,137 995 79% 21% 72%
> $63,137 (non SES) 836 91% 9% 77%
SES 39 90% 10% 85%
TOTAL 6,525 73% 27% 62%

Estimated Subgroup Totals 4,769 1,756 4,069

1. This information is gathered from the staff responses to the EEO survey.
Figures for EEO groups other than women have been adjusted to compensate for the effects of non-response to the EEO data collection.
EEO statistics reported in previous years may not be comparable due to a change in the method of estimating EEO group representation.
2. Response was insufficient to generate a statistically valid estimate.

Table 2 Percent of Total Staff by Employment Basis

Subgroup as % of Staff at each Category

EMPLOYMENT BASIS TOTAL STAFF Men Women Respondents to


(Number) EEO Survey

Permanent Full-Time 5,563 81% 19% 66%


Part-Time 655 11% 89% 44%
Temporary Full-Time 205 77% 23% 33%
Part-Time 63 21% 79% 3%3
Contract SES 39 90% 10% 85%
SUB-TOTAL 6,525
Casual 1,123 37% 63% 21%
TOTAL2 7,648 68% 32% 56%

Estimated Subgroup Totals 5,190 2,458 4,306

1. This information is gathered from the staff responses to the EEO survey.
Figures for EEO groups other than women have been adjusted to compensate for the effects of non-response to the EEO data collection.
EEO statistics reported in previous years may not be comparable due to a change in the method of estimating EEO group representation.
2. Total staff numbers include all casual and school crossing staff.
3. Response was insufficient to generate a statistically valid estimate.

(168) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 169

APPENDIX 10 (Continued)
Staffing

Subgroup as Estimated % of Total Staff in each Employment Category based on EEO Survey1

Aboriginal People People from Racial People whose Language People with a Disability People with a Disability
and Torres Strait Ethnic, Ethno-Religious First Spoken as a Child Requiring Work-related
Islanders Minority Groups was not English Adjustment

4.0% 18% 17% 18% 7.0%


1.3% 17% 16% 11% 4.0%
0.7% 14% 11% 10% 2.6%
0.2% 27% 26% 9% 1.5%
9% 9% 15% 3.0%
2.0% 18% 17% 13% 4.7%

133 1,177 1,115 875 307

Subgroup as Estimated % of Total Staff in each Employment Category based on EEO Survey1

Aboriginal People People from Racial People whose Language People with a Disability People with a Disability
and Torres Strait Ethnic, Ethno-Religious First Spoken as a Child Requiring Work-related
Islanders Minority Groups was not English Adjustment

1.8% 18% 18% 13% 4.4%


14% 13% 8% 2.8%
3.0% 21% 13% 12% 3.0%

9% 9% 15% 3.0%

1.7% 7% 7% 11% 0.8%


1.7% 16% 15% 13% 4.1%

128 1,248 1,167 972 311

(169) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 170

APPENDIX 11
Overseas Visits by RTA Officers

From 1 July 1999 to 30 June 2000, officers of the Roads and Traffic Visits during 1999/2000 for which the costs were met by the RTA were
Authority (RTA) travelled overseas on occasions to undertake official as follows:
duties for the RTA and the Government of NSW. The countries visited – The Chief Executive travelled to Kuala Lumpur, Malaysia to represent
were Papua New Guinea, Singapore, New Zealand, China, Philippines, the Minister for Roads at the 21st World Road Congress, and to
Malaysia, USA, France, England, Spain, Hungary, Sweden, Finland, Singapore where he met with officials of the Singapore Land
Switzerland, Norway, Canada, Mexico and Austria. Transport Authority to discuss electronic tolling and transport issues
– The Director, Strategic Projects, went to Canada and the United
Twenty three of these visits involved officers from the RTA’s Traffic
States to attend the 6th World Intelligent Transport Systems
Technology Branch. Their duties included the installation, technical
Conference in Toronto and also visited various authorities in
support, Y2K compliance testing, reviewing and upgrading of the RTA’s
New York and Albany to gather information on smartcards and
Sydney Co-ordinated Adaptive Traffic System (SCATS) operating or
electronic tolling
being established in Singapore, New Zealand, China, Mexico and the
– The RTA’s Southern Region, Road Safety & Traffic Management
Philippines as well as the training of, and providing expert advice to,
Manager also attended the Intelligent Transport Systems Conference
customers.
in Toronto
All associated costs incurred by the RTA on the SCATS visits are fully – The Manager, Traffic Facilities Asset went to New Zealand to attend
recoverable along with a margin of profit. a three day conference on performance based specifications
Also, at no cost to the RTA, overseas visits were made by: – The Director, Road Network Infrastructure, along with the General
– the Computer Systems Manager, Traffic Technology Branch to Manager, Infrastructure Maintenance, flew to New Zealand to discuss
New Zealand to help develop Bus Priority Specification for delivery arrangements for road maintenance in New Zealand with
Christchurch City Council several road agencies
– the Manager, Research and Development, Corporate Strategy to – The Acting Manager, Information and Technology, went to
New Zealand to attend the meeting of the Austroads Asset New Zealand in relation to the Austroads Asset Management
Management Reference Group Reference Group
– the General Manager, Corporate Strategy, to Malaysia to attend – The General Manager, National Policy and Regulation, visited
the PIARC World Road Congress Conference New Zealand to discuss current developments in road user charges,
– an Inspector, Vehicle Regulation to Florida in the United States as the application of performance based standards to vehicle regulation,
part of a Rotary Group Study Exchange Program mass limits and options for research into the comparative pavement
– the Bitumen Sprayer, Inspector, Fleet Services, who visited Papua wear effects of road friendly and steel suspension systems
New Guinea to test and calibrate a bitumen sprayer, and – The Manager of the Vehicle Emissions Management Program
– the Pavement Condition Manager, Road Network Infrastructure, attended the 15th Annual Mobile Sources/Clean Air Conference in
who travelled to the UK, Spain, France, Hungary, Sweden, Finland Colorado, USA
and Canada and visited selected Road Agencies in relation to the – The General Manager, Transport Management Centre, visited a
RoadCrack pavement condition monitoring system. number of key traffic management facilities and organisations in the
United States
In addition, the General Manager, Environment and Community Policy – The Manager, Intelligent Transport Systems went to Switzerland and
and the Manager, Sydney Motorway Projects, visited Paris to attend Norway in relation to Electronic Tolling
the PIARC Technical Committee Meeting. Half of the cost of the trip – The Manager, Network Strategy, attended the Austroads Road System
was paid by Austroads, the other half by the RTA. Management Advisory Panel Meeting
– The General Manager, Environment and Community Policy, and the
Manager, Environment Compliance, travelled to New Zealand to
attend the Transit New Zealand Environmental Performance
Indicators Workshop and the Austroads Environmental Reference
Group Meeting, and
– The Sydney Motorway Projects Manager, visited Switzerland and
Austria to attend a meeting of the Permanent International Association
of Road Congresses (PIARC) Technical Committee C5 – Road Tunnel
Operations. He also inspected road tunnels in relation to
environmental issues, including air quality, fire safety and smoke control.

(170) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 171

APPENDIX 12
Freedom of Information

In 1999/2000 the RTA received 494 requests for information under FOI Appeals to the Ombudsman
the Freedom of Information Act 1989, compared with 286 in 1998/99 In the first case the applicant made an FOI application seeking
ie 73 % increase. Sixteen applications were brought forward into the access to reports, surveys, studies and any other documents prepared
current period, compared to 31 in 1998/99. Eight applications were by Connell Wagner or the RTA regarding the assessment of route
not completed at the end of the 1999/2000 reporting period. options for the proposed Pacific Highway bypass of Ulmarra. The RTA
determined a number of pages of documents were exempt. The
FOI requests continued to be received for access to internal documents
applicant only appealed in relation to two pages of documents.
concerning decisions made, details of the history of motor vehicles, the
The matter was referred to the Ombudsman in April 1998. In May
names and addresses of certain Authorised Inspection Stations (AIS),
2000 the Ombudsman recommended that the RTA reconsider its
the sources of complaint letters, accident reports on motor vehicles,
determination in relation to the two pages. The RTA gave further
documents relating to the planning, construction, maintenance and
consideration to the two pages and determined to release three
funding of roads and records relating to maintenance of the road
additional segments of one page. The remaining parts of both pages
system. A significant number of applicants continue to use FOI to
were still considered exempt.
obtain accident reports on motor vehicles and to obtain details of the
identity of the authors of complaint letters concerning licence holders. In the second and fourth cases the applicant, an RTA employee, made
The use of FOI by legal practitioners and insurance investigators has two separate FOI applications seeking access to copies of his personnel
undergone a significant increase. file and copies of any documents relating to the applicant and held by
nominated RTA employees.
Of the 498 requests completed, 348 were granted in full, 22 in part,
and 108 were refused. However, of the 130 applications refused in full The first application was lodged in January 1998 and a second
or in part, 13 were refused on the grounds that the information was application was lodged in April 1998 for any documents created since
otherwise available, 55 were refused as the documents were not held the first application. Over 1,200 documents were located. Most of the
by the RTA and 24 were refused as the applicant did not pay the documents were released. Determinations were made that some
necessary fees. documents were exempt under clauses relating to law enforcement,
personal affairs, internal working documents or legal professional
Of those requests not granted in full, 10 applicants sought an internal
privilege.
review of the decision (compared with nine in 1998/99) and 7 took the
matter to the Ombudsman (compared with one in 1998/99). Two of The applicant lodged an internal review application. The internal review
the seven cases are dealt with under the section on the Administrative upheld the original determination.
Decisions Tribunal. Both matters were referred to the Ombudsman in August 1998. In
There were 2 appeals to the Administrative Decisions Tribunal this year February 2000 the Ombudsman recommended that the RTA reconsider
(compared with none last year). its determination in relation to the documents related to both
applications. The RTA gave further consideration and determined to
One hundred and twenty-eight applications required consultation with
release all remaining documents.
a total of 212 third parties outside the RTA (85 applications required a
total of 186 consultations in 1998/99). In the third case the applicant made an FOI application seeking access
to copies of documents related to a complaint concerning the
Processing FOI requests cost an estimated $26,487 ($18,754 in
applicant’s ability to drive safely.
1998/99) and fees received totalled $27,440 ($22,604 in 1998/99).
There were no requests for amendments to personal records (none in Four documents were located. A determination was made that part of
1998/99). There were no requests for a notation to personal records two of the documents were exempt under clauses relating to law
(none in 1998/99) and no Ministerial certificates have been issued in enforcement and documents containing confidential material.
the last two years. The applicant lodged an internal review application. The internal review
A significant number of applications (168) were finalised after the upheld the original determination.
normal 35 day processing period. One of the major contributing The applicant lodged a separate claim that an RTA report was incorrect
factors for this was the significant increase in applications during the and misleading. A statement was placed on the report following
reporting period (73%). The RTA initially provided additional assistance negotiations with RTA representatives.
and followed this up with recent review of the resources available to
the area responsible for Freedom of Information and Privacy. This In the fifth case the applicant made an FOI application seeking access
resulted in a significant increase in the resources available for dealing to copies of documents related to all submissions including confidential
with these vital functions. The RTA will continue to monitor the area submissions in reply to the Pacific Highway Ulmarra Bypass, also that
over the next twelve months. submissions have names attached.
There continues to be increased awareness by management of the The RTA located 125 pages of documents and determined 25 pages
importance of documenting the reasons for decisions. were exempt. The applicant appealed in relation to the exempt
documents. The original determination was upheld. The matter was
The RTA continued with the identification, computerised recording and referred to the Ombudsman in July 1999. In April 2000 the
the provision of policy documents in accordance with the requirements Ombudsman recommended that the RTA reconsider its determination.
of the FOI Act. The RTA gave further consideration and determined that the
documents were still considered exempt.

(171) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 172

APPENDIX 12 (Continued)
Freedom of Information

Pending FOI Appeals to the Ombudsman The Administrative Decisions Tribunal upheld the RTA’s determination
One FOI matter has been referred to the Ombudsman and is yet to be that the documents were exempt. The applicant subsequently lodged
finalised. The applicant applied for part of a copy of an RTA audit report an appeal with the Administrative Decisions Tribunal Appeal Panel. The
into the way a number of local councils handled their road funding appeal is yet to be heard.
allocations. The RTA stated that the report was still being finalised and
In the second case, on 9 February 1999, an RTA employee, made a FOI
the part of the report requested would need to be read in conjunction
application seeking access to copies of documents relating to allegations
with the general section of the report, covering all six councils examined.
raised, subsequently investigated and disciplinary action taken against
him, from the period 1 June 1996 to 8 January 1999. The documents
FOI Appeals to the Administrative Decisions Tribunal claimed as exempt were forwarded to the Ombudsman.
In the first case solicitors acting for the applicant made an FOI
Approximately 419 documents were located. Most of the documents
application seeking access to copies of documents related to a
were released. Determinations were made that some documents were
complaint concerning the applicant’s ability to drive safely.
exempt under clauses relating to law enforcement, documents containing
Four documents were located. A determination was made that part of confidential material and the management of agency personnel.
one and all of the other three documents were exempt under clauses
The applicant lodged an internal review application. The internal review
relating to law enforcement and documents containing confidential
upheld the original determination.
material.
In May 1999 the applicant lodged an appeal with the Ombudsman’s
The applicant lodged an internal review application. The internal review
Office. On a recommendation of the Ombudsman two of the
upheld the original determination.
documents were subsequently released. In February 2000 the
The applicant then lodged an appeal with the Ombudsman’s Office. Ombudsman’s Office advised that it would not continue with the case
On 15 September 1999 the Ombudsman’s Office advised that it had as the applicant had lodged an appeal with the Administrative Decisions
determined not to take any further action. Tribunal, on 25 January 2000.
The applicant lodged an appeal with the Administrative Decisions On 28 April 2000 the Administrative Decisions Tribunal determined that
Tribunal on 29 November 1999. the documents were not exempt under the FOI Act and stated that the
RTA should release the documents unless it intended to lodge an
appeal. The RTA determined not to appeal and the documents were
subsequently released to the applicant.

FOI REQUESTS
Personal Other Total
1998–1999 1999–2000 1998–1999 1999–2000 1998–1999 1999–2000
New (including transferred in) 59 44 227 450 286 494
Brought forward 10 5 21 11 31 16
(incomplete requests from previous year)
Total to process 69 49 248 461 317 510
Complete 63 39 227 439 290 478
Transferred out 0 10 0 1 0 2
Withdrawn 1 2 11 16 12 18
Total processed 64 42 238 456 302 498
Unfinished (carried forward) 5 6 10 2 15 8

RESULTS OF FOI REQUESTS


Personal Other
1998–1999 1999–2000 1998–1999 1999–2000
Grant in full 32 17 164 331
Grant in part 13 7 22 15
Refused 18 15 40 93
Deferred 0 0 1 0
Completed 63 39 227 439

(172) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 173

APPENDIX 12 (Continued)
Freedom of Information

BASIS OF DISALLOWING OR RESTRICTING ACCESS


Personal Other
1998–1999 1999–2000 1998–1999 1999–2000
Section 19 (application incomplete, wrongly directed) 0 0 0 0
Section 22 (deposit not paid) 1 1 6 23
Section 25 (1) (a1) (Unreasonable diversion of resources) 0 0 0 1
Section 25 (1) (a) (exempt) 14 12 27 21
Section 25 (1) (b), (b1), (c), (d) (otherwise available) 8 6 4 7
Section 28 (1) (b) (documents not held) 10 2 27 53
Section 24 (2) (deemed refused, over 21 days) 0 1 0 2
Section 31 (4) (released to medical practitioner) 0 0 0 1
Totals 33 22 64 108

DAYS TO PROCESS
1997/98 and 1998/99 Personal Other
1998–1999 1999–2000 1998–1999 1999–2000
0–21 41 20 157 234
22–35 10 3 34 51
Over 35 12 16 36 152
Over 21 (Out of time) 0 0 0 0
Over 35 (Out of time) 0 0 0 0
Totals 63 39 227 437

HOURS TO PROCESS
Personal Other
1998–1999 1999–2000 1998–1999 1999–2000
0–10 61 35 220 430
11–20 2 2 6 2
21–40 0 3 1 3
Over 40 0 1 0 2
Totals 63 39 227 437

TYPE OF DISCOUNT ALLOWED ON FEES CHARGED


Personal Other
1998–1999 1999–2000 1998–1999 1999–2000
Public interest 1 0 3 10
Financial hardship – Pensioner/Child 13 6 15 16
Financial hardship – Non profit organisation 0 1 5 12
Totals 14 7 23 38
Significant correction of personal records 0 0 3 0

GROUNDS ON WHICH INTERNAL REVIEW REQUESTED


Personal Other
Upheld Varied Upheld Varied
1998–1999 1999–2000 1998–1999 1999–2000 1998–1999 1999–2000 1998–1999 1999–2000
Access refused 1 0 0 0 3 0 0 0
Deferred release 0 0 0 0 0 0 0 0
Exempt matter 2 2 0 0 3 7 1 1
Unreasonable estimate of charges 0 0 0 0 0 0 0 0
Charges unreasonably incurred 0 0 0 0 0 0 0 0
Amendment
Totals 3 2 0 0 6 7 1 1

(173) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 174

APPENDIX 12 (Continued)
Freedom of Information

Ombudsman – a complaint from a woman who had her motor vehicle transferred
The Ombudsman referred twenty-two complaints to the RTA compared from her name without her approval. The RTA contacted the new
to eight the previous year. Complaints were received on the following registered owner and asked him to ‘show cause’ why the RTA should
matters: not restore the registration to the name of the previous owner. All
– a complaint from a man who had incurred a fine for late payment of documentation was forwarded to the Ombudsman for further
transfer on his motor vehicle and the RTA’s policy on rounding off the investigation
charges. The RTA contacted the Ombudsman and provided – a further complaint from a woman who had received fines recorded
information over the telephone. The Ombudsman was satisfied with against her motor dealership but allegedly incurred by a former
the response and did not require a written reply employee in a previous dealership. The RTA advised that the
– a complaint from a company that it had been excluded from tendering complainant should contact the Department of Fair Trading
for the supply and planting of native seeds along the Pacific Highway, – a complaint from a company that it had been excluded from
Coolongolook. The RTA advised the Ombudsman that it had already tendering for the supply and planting of viro-tubes and viro cells as
responded to the complaint and advised that it had obtained three part of landscaping works on a State Highway. The RTA advised that
quotes from specialist companies. It had also given an undertaking that it had decided not to proceed with the tender. The RTA would use its
it would call public tenders in future own workforce.
– a complaint from a man who alleged that there had been a serious – a complaint from a woman that the RTA had lost a file relating to an
waste of public monies by the RTA. The Audit Office was investigating investigation of allegations that an Authorised Inspection Station had
the first issue raised and the Ombudsman stated that, therefore, it passed a motor vehicle that was not roadworthy. The RTA provided
would be inappropriate for the Ombudsman to duplicate the details of the investigation and the circumstances relating to the loss
of the file. The right to inspect vehicles had already been taken away
investigation. The Ombudsman declined to investigate the second
from the Station for a previous offence
allegation as the alleged incident had occurred 12 years ago
– a complaint from a man concerning delays in responding to his
– a complaint from a man concerning proposed changes to Moore Park
request for information on a number of issues relating to the Eastern
Road and surrounding streets. The RTA explained the extensive public
Distributor. The RTA provided details on efforts made to contact the
consultation process involved in the planning for the area
complainant and also responded to each of the points concerning the
– a complaint from a man who had his driver’s licence cancelled. The
Eastern Distributor
RTA advised the Ombudsman that the complainant had lodged an
– a complaint from a woman that her motor vehicle had been defected
appeal to the NSW local court and that the matter was now in the
for not complying with regulations. The complainant stated that an
hands of the court. No further action could be taken until the court
engineer’s certificate had already been obtained for the vehicle. The
had made a determination
complainant agreed to obtain a new engineer’s certificate for a non-
– a complaint from a woman who had received fines recorded against
standard engine that had been fitted after the issue of the original
her motor dealership but allegedly incurred by a former employee in a
certificate
previous dealership. The RTA advised that the name of the
– a complaint from a man concerning alleged deficiencies in the RTA’s
complainant’s dealership had been changed, following her request. The
1996 investigation on the Alternative Inner and Outer Selection Route
RTA also advised the procedures for advising the Department of Fair
Albury/
Trading over the misuse of a trading name and confirmed
Wodonga Project. The RTA advised the Ombudsman that this matter
arrangements for the dealership to process notices of vehicle disposals
had been investigated by ICAC approximately two years previously
– a complaint from a man that his wife had incurred a fine for late
– further enquiries on behalf of a solicitor and his client who had
payment of transfer on his motor vehicle. The RTA confirmed the late
purchased a motor vehicle in NSW. The Ombudsman requested
fee was payable but waived the fee
details of policies and procedures in place at the time the vehicle was
– a complaint from a solicitor on behalf of a client who had purchased
registered. On receipt of the RTA’s reply the Ombudsman determined
a motor vehicle in NSW. The vehicle was confiscated as stolen when he
to take no further action, and
tried to register it in Queensland. The RTA advised that the complainant
– a complaint from a man concerning the level of customer service at an
did not try to register the vehicle in NSW prior to returning to
RTA motor registry. The RTA apologised for the delays experienced by
Queensland. The vehicle was not recorded as stolen in NSW
the complainant and undertook to examine the resources to ensure that
– a complaint from a man who had his driver’s licence cancelled. The
in future there would be sufficient staff available to meet peak demands.
Ombudsman asked a number of questions concerning the legislation
and RTA policies relating to the cancellation of drivers’ licences Thirteen of the complaints were referred by the Ombudsman to the
– a complaint from a man concerning his dissatisfaction with speed RTA for investigation and eight were referred for consideration and
signs in a number of roads in the Moorebank area. The RTA response direct to the complainants in the first instance.
responded to the complainant’s eleven suggestions. The RTA agreed
to three of the suggestions and provided reasons as to why the other Most matters were responded to by 30 June 2000.
suggestions were not practical In addition, an enquiry was received from the Queensland
– a complaint from a man who claimed that the RTA had not addressed Ombudsman’s Office concerning the policies and practices associated
a number of issues in relation to the wearing of bicycle helmets. In with registering motor vehicles arriving from interstate.
particular the complainant raised the question of the consideration of
a specific report. The RTA considered the report and advised the
complainant that it contained no information relevant to the wearing
of bicycle helmets
– a complaint from a man that he had incurred a fine for late payment
of transfer on his motor vehicle. The Ombudsman raised a number of
questions concerning the policies associated with the transfer of
motor vehicles
– a complaint from a man who had his driver’s licence cancelled for
fines incurred for parking fines on number plates he had reported as
being stolen. The RTA investigated the matter and, after consultation
with the Police Service and the SDRO, restored the complainant’s
driver’s licence

(174) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 175

APPENDIX 13
Legal Change

LEGAL CHANGE The Road Transport (Heavy Vehicles Registration Charges)


Amendment Bill 2000 was passed by Parliament in late June 2000.
New Acts
The Bill will, once assented to, amend the Road Transport (Heavy
The Road Transport (General) Act 1999 was assented to on 1 July Vehicles Registration Charges) Act 1995 and the Road Transport
1999 and commenced on 1 December 1999. This Act provides for the (Heavy Vehicles Registration Charges) Regulation 1996 and will:
administration and enforcement of road transport legislation. It also – revise the charges payable for registration and renewal of registration
makes provision with respect to written off and wrecked vehicles, of heavy vehicles (in line with the charges developed by the National
review of decisions made under road transport legislation, and the Road Transport Commission); and
use of vehicles on roads and road related areas. – provide for the indexation of those charges and heavy vehicle permit
charges in line with determinations, based on the Consumer Price
The Road Transport (Safety and Traffic Management) Act 1999
Index, of the Australian Transport Council, but so as to enable the
was assented to on 1 July 1999 and commenced on 1 December 1999.
Minister to determine a lesser rate of increase.
This Act facilitates the adoption of nationally consistent road rules
(the Australian Road Rules) in New South Wales as well as providing New Regulations
for matters concerning safety and traffic management on roads and
road related areas. The Motor Traffic Amendment (Fees, Charges and Penalties
Imposed by Penalty Notices) Regulation 1999 increased as from
The Road Transport Legislation Amendment Act 1999 was assented
1 July, 1999 fees and charges payable in connection with, as well as
to on 1 July 1999 and commenced on 1 December 1999 and it repeals
certain penalties imposed by penalty notices issued under, the now
the Traffic Act 1909 and related legislation as well as amending other
repealed Traffic Act 1909.
legislation consequent on those repeals and the enactment of the Road
Transport (General) Act 1999 and the Road Transport (Safety and The Recreation Vehicles (General) Amendment (Fees) Regulation
Traffic Management) Act 1999. 1999 increased as from 1 July, 1999 fees on 3 types of applications
under the Recreation Vehicles Act 1983.
The Road Transport (Safety and Traffic Management) Amendment
(Camera Devices) Act 1999 was assented to on 3 December 1999 The Driving Instructors Amendment (Fees) Regulation 1999
and commenced on 24 December 1999. It amends the Road Transport increased as from 1 July, 1999 licence related fees.
(Safety and Traffic Management) Act 1999 and makes further provision The Roads (General) Amendment (Penalties Imposed by Penalty
for the use and inspection of certain devices in connection with the Notices) Regulation 1999 increased as from 1 July, 1999 penalties
recording of speeding and traffic light offences as well as making imposed by penalty notices for offences prescribed by the Roads
consequential amendments and an amendment of the Crimes Act 1900 (General) Regulation 1994.
relating to evidentiary certificates.
The Motor Traffic Amendment (Penalty Notices and Short
The Road Improvement (Special Funding) Amendment Act 1998 Descriptions) Regulation 1999 prescribed short descriptions for
commenced on 30 July 1999. This Act permitted the continuation of offences in the now repealed Motor Traffic Regulations 1935 and
special funding arrangements for road improvement, road safety and provided for the issue of penalty notices for offences under the now
road related public transport infrastructure under the ‘‘3x3 Program’’. repealed Traffic Act 1909.
The Roads Amendment (Transitways) Act 1999 was assented to on The Road Transport (Safety and Traffic Management) (Road Rules)
7 July 1999 and its provisions commenced on 16 July 1999 and Regulation 1999 incorporates the Australian Road Rules into the law of
1 December 1999. The Act amends the Roads Act 1993 and enables NSW and as well as additional NSW road rules. The Regulation also
certain roads to be classified as transitways and makes provision with provides for parking schemes and miscellaneous other matters relating
respect to roads so classified. to the use of roads and road related areas by vehicles.
The Road Transport (Driver Licensing) Amendment Act 1999 The Road Transport (Safety and Traffic Management) (Road Rules)
was assented to on 24 November 1999 and fully commenced on Amendment (Digital Security Indicators) Regulation 1999 prescribes
11 February 2000. The Act amends the Road Transport (Driver a security indicator for digital images taken by any approved digital
Licensing) Act 1998 setting out the circumstances in which the RTA speed camera.
may retain and use photographs of applicants who have applied for
driver licences, ‘‘proof of age’’ cards or certain other licences. Schedule The Road Transport (Safety and Traffic Management) (Road Rules)
2, which commenced on 1 December 1999, to the Act provides for Amendment (Testing of Speed Measuring Devices) Regulation 2000
the cancellation and suspension of a driver licence for some empowers the RTA (in addition to the Police Commissioner) to approve
speeding offences. the manufacturer’s recommended calibration method for the purpose
of testing for accuracy and functional requirements of certain non-radar
Uncommenced Acts based speed measuring devices used by the RTA.
The Roads Amendment (Tolls) Act 1999 was assented to on The Road Transport (Safety and Traffic Management) (Driver
3 December 1999 and is expected to commence later in 2000. Fatigue) Regulation 1999 contains provisions designed to minimise
The Act amends the Roads Act 1993 to provide a substantially uniform the number of road accidents involving heavy trucks and commercial
enforcement regime for the collection of both government and private buses that arise from driver fatigue. The Regulation deals with:
tolls on tollways. – the regulation of driving hours,
– the keeping of driving records,
The Statute Law (Miscellaneous Provisions) Act 2000 which – the creation of offences in relation to acts that induce contraventions
commenced on 1 July 2000 includes provisions clarifying the operation of the requirements of the Regulation,
of section 25A of the Road Transport (Driver Licensing) Act 1998 and – the issuing of logbooks,
correcting cross-references not reproduced when section 7A of the now – the administration of the transitional fatigue management scheme, and
repealed Traffic Act 1909 was re-enacted as section 25A. – the granting of exemptions from certain requirements of the
Regulation.

(175) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 176

APPENDIX 13 (Continued)
Legal Change

The Road Transport (General) Regulation 1999 makes provision with – exempts self-propelled elevating work platforms from the operation
respect to: of the Road Transport (Vehicle Registration) Act 1997, and
– information concerning written off and wrecked motor vehicles, – makes other amendments that are consequential from the enactment
– special service requirements for notices and documents, of the Road Transport (Safety and Traffic Management) Act 1999 and
– fees in respect of the impounding of vehicles, and the Road Transport (General) Act 1999.
– matters relating to the maintenance by the RTA of a database of
The Road Transport (Vehicle Registration) Amendment (Vehicle
certain types of declarations and orders.
Standards) Regulation 1999 adopts uniform national motor vehicle
The Road Transport (General) Amendment (Saving of Breath standards applicable to registrable vehicles.
Testing Devices) Regulation 1999 provides for the continued validity
The Road Transport (Vehicle Registration) Further Amendment
of those breath analysing instruments and breath testing devices that
(Fees) Regulation 1999 increases certain fees as from 1 July, 1999.
were approved under the now repealed Traffic Act 1909.
The Roads (General) Amendment (Short Descriptions) Regulation
The Road Transport (General) Amendment (Registration Appeals)
1999 prescribes short descriptions for offences for the purposes of
Regulation 2000 enables appeals to be made to a Local Court against
section 145B of the Justices Act 1902, including certain offences under
a decision of the RTA to refuse to grant or renew, or to vary the
the Roads (General) Regulation 1994.
conditions of, suspend or cancel, the registration of a vehicle.
The Road Transport (Mass, Loading and Access) Amendment (Road
The Road Transport (General) (Short Descriptions and Penalty
Trains and Other Vehicles) Regulation 1999 transfers certain
Notice Offences) Regulation 1999 prescribes:
provisions from the repealed Motor Traffic Regulations 1935 to the
– certain offences as penalty notice offences,
Road Transport (Mass, Loading and Access) Regulation 1996 as a
– short descriptions for such offences,
consequence of the replacement of the Motor Traffic Regulations 1935
– the authorised officers who may serve penalty notices for such
by the Road Transport (Safety and Traffic Management) (Road Rules)
offences, and
Regulation 1999.
– the penalties payable for such offences if dealt with by way of penalty
notice. The Road Transport (Mass, Loading and Access) Amendment (Rear
Overhang) Regulation 1999 exempts the rear overhang of a heavy
The Road Transport (Driver Licensing) Amendment (Law Revision)
vehicle complying with Regulation 118 of the now repealed Motor
Regulation 1999 exempts certain drivers from licensing requirements
Traffic Regulations 1935 from rear overhang requirements. This
and makes consequential amendments as a result of the enactment of
Regulation will expire on 1 July 2005 and applies to heavy vehicles that
the Road Transport (Safety and Traffic Management) Act 1999 and the
have been continuously registered on and from 1 July 1996 and the
Road Transport (General) Act 1999.
registered operator of which has been the same since the
The Road Transport (Driver Licensing) Amendment (Cancellation of commencement of this amendment.
Licences) Regulation 1999 deals with the power of the RTA to cancel
The Road Transport (Mass, Loading and Access) Amendment
or suspend driver licences for certain serious speeding offences.
(Vehicle Checks and Fees) Regulation 1999 allows:
The Road Transport (Driver Licensing) Amendment (Double – an authorised officer to direct the driver of a light vehicle (being a
Demerit Points) Regulation 1999 expands the definition of ‘over a vehicle with a gross vehicle mass, or a combination with a gross
long weekend’ for the purposes of calculating double demerit points to combination mass, not exceeding 4.5 tonnes) to stop for mass checks
include public holidays declared on Tuesdays and Thursdays and public where the officer is of the opinion that the vehicle is being used for
holidays declared for part of a day and to include 29 December 1999. business or commercial purposes, and
– the RTA to exempt persons from certain application fees for permits.
The Road Transport (Driver Licensing) Amendment (Fees)
Regulation 1999 increases from 1 July 1999 certain fees payable in The Road Transport (Mass, Loading and Access) Amendment (Axle
connection with the administration of the Road Transport (Driver Spacing and Exemptions) Regulation 2000:
Licensing) Act 1998 and by effecting law revision concerning demerit – enables the RTA to exempt a person or class of persons from the
points offences and penalties. operation of any of the provisions of clause 55 (1) of the Road
Transport (Mass, Loading and Access) Regulation 1996 relating to the
The Road Transport (Vehicle Registration) Amendment
projection of loading or equipment of vehicles,
(Miscellaneous) Regulation 1999:
– provides for the payment, waiver or refund of fees for permits
– provides that a registration charge must be paid before a registrable
exempting persons from the operation of any of the provisions of
vehicle can be registered,
clause 55 (1), and
– makes further provision in respect of the display of registration labels
– modifies the total mass limit for combinations of a particular axle
on trailers and caravans,
spacing.
– enables the RTA to alter the distinguishing number of a registrable
vehicle if its number-plates were issued in error, The Transport Administration (General) Amendment (Traffic
– enables the RTA to require the registered operator of a vehicle to Control Facilities) Regulation 2000 prescribes certain signs, markings,
return number-plates issued in respect of a vehicle with expired structures and other devices containing or relating to requirements or
registration, directions the contravention of which are offences under the road
– specifies the place in which the holders of trader’s plates are to transport legislation, as traffic control facilities in the context of Part 6
keep records concerning the plates, of the Transport Administration Act 1988.
– enables the RTA to waive and postpone payment of fees for
number-plates,
– makes it clear that it is an offence for a person to cause or permit an
unregistered vehicle to be used on a road or road related area,
– makes it an offence for the driver of a registrable vehicle to use the
vehicle with an incorrectly affixed registration label,
– enables police officers to seize number-plates from certain vehicles
driven while unregistered,

(176) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 177

APPENDIX 13 (Continued)
Legal Change

Uncommenced Regulations JUDICIAL DECISIONS AFFECTING THE RTA


The following regulations were gazetted on 30 June 2000 to take effect Thredbo Coronial Inquiry
on 1 July 2000 increasing road transport fees, charges and fixed
The Coroner handed down his findings on the Thredbo Landslide on
penalties generally in line with the anticipated inflation rate of
29 June 2000. The Coroner found the causes of the landslide that led
2000–2001 and including 10% GST:
to the deaths of 18 people were:
– Driving Instructors Amendment (Fees) Regulation 2000,
– The failure of any government authority responsible for the care,
– Roads (General) Amendment (Penalty Notices) Regulation 2000,
control and management of the Kosciusko National Park and the
– Road Transport (Mass, Loading and Access) Amendment (Fees)
maintenance of the Alpine Way to take any steps throughout the
Regulation 2000,
relevant period to ensure that the village was rendered safe from
– Road Transport (Vehicle Registration) Amendment (Fees) Regulation
exposure to the marginally stable embankment
2000,
– The approval and construction of a water main constructed of
– Road Transport (Driver Licensing) Amendment (Fees) Regulation
materials which could not withstand the movement which was taking
2000,
place in the marginally stable Alpine Way embankment into which it
– Road Transport (General) Amendment (Fees) Regulation 2000,
was laid, and
– Road Transport (General) (Short Descriptions and Penalty Notice
– Leakage from the water main leading to the saturation of the
Offences) Amendment Regulation 2000,
marginally stable Alpine Way fill embankment.
– Road Transport (Safety and Traffic Management) (Driver Fatigue)
Amendment (Fees) Regulation 2000, and The Coroner also noted the history of landslides along the Alpine Way
– Road Transport (Safety and Traffic Management) (Road Rules) was well known although not recorded in any systematic fashion. He
Amendment (Tow-away Charge) Regulation 2000. also stated that despite the propensity of the Alpine Way to landsliding
which was known to relevant authorities throughout the period, no
The following regulations were also gazetted on 30 June, 2000 to
specific recommendation was ever made to those directly responsible
commence on 1 July, 2000:
for the road that would have led to the reconstruction of the road
– Road Transport (Driver Licensing) Amendment (Graduated Licensing)
above the village. In this regard the Coroner expressed grave concern
Regulation 2000,
that the principal road maintenance authority, now the RTA, previously
– Road Transport (Driver Licensing) Amendment (Miscellaneous)
the DMR, never expressly advised NPWS of the need to reconstruct the
Regulation 2000,
road adjacent to the village to avoid the risk of death or injury due to
– Road Transport (General) (Short Descriptions and Penalty Notice
the landslide.
Offences) Amendment (Graduated Licensing) Regulation 2000,
– Road Transport (Safety and Traffic Management) (Road Rules) The Coroner also expressed concern that despite a representative of the
Amendment (Graduated Licensing) Regulation 2000, RTA inspecting the Alpine Way between 1991/1996 no recommendation
– Road Transport (Safety and Traffic Management) (Road Rules) was ever made that the road above the village should be reconstructed.
Amendment (Miscellaneous) Regulation 2000, and In this regard the Coroner was critical that although the RTA had then
– Road Transport (Vehicle Registration) Amendment (Miscellaneous) developed a Slope Risk Assessment system, it was not used during this
Regulation 2000. period in assessing the Alpine Way.

Subordinate Legislation Act 1989 WorkCover (Insp. Hannah –v– RTA)


There were no departures from the Subordinate Legislation Act 1989. On 11 February 1997 an RTA employee was standing in the bucket of a
skid steer loader operated by another RTA employee. The operator had
his hands on the controls of the loader at the time and although the
engine was switched off, the controls still operated the hydraulics. The
employee’s foot was caught in the bucket, causing crush injuries. He
was wearing safety boots at the time. WorkCover proceeded against
the RTA for a breach of section 15(1) of the Occupational Health and
Safety Act for failure to have a safe system of work, to which the RTA
pleaded guilty.
The maximum penalty which could have been payable was $55,000.
A fine of $35,000 was imposed. The magistrate was of the view that it
was appropriate to award a penalty in the higher range of the scale.

WorkCover (Insp. Tyler –v– RTA)


On Thursday 21 March 1996 the RTA was undertaking roadworks on
Miller and Bank Streets Pyrmont associated with the Glebe Island
Bridge Project.
At approximately 11.00 am a mechanical excavator was being used to
dig a trench in sandstone for stormwater pipes when its rock breaker
attachment struck a 5 kV low voltage underground power line. The
resulting flash burnt an RTA worker who was involved in guiding the
excavator. He was standing on the roadway adjacent to the excavated
area. His clothes caught fire and he suffered serious burns to 45% of
his body.
Following the accident WorkCover prosecuted the RTA alleging breaches
of section 15 of the Occupational Health and Safety Act. The RTA entered
a plea of guilty and the matter was heard before Kavanagh J in the
Industrial Court of NSW on 24 February 1999 and 15 March 1999.

(177) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 178

APPENDIX 13 (Continued) APPENDIX 14


Legal Change Land Disposal

In her judgment Kavanagh J found this offence to be of a serious The RTA owns property for administrative purposes and acquires
nature. In making this finding Her Honour referred to the fact that the property for road construction.
RTA was aware of the existence of the cable within the vicinity of the
Properties that are surplus to requirements are disposed of in
excavation works yet it did not ensure that prior to excavation
accordance with Government policy.
adequate steps were taken to ensure that the cable was either located
or de-energised. The Court also referred to the failure to provide the During 1999/2000 contracts were brought to account for the sale
RTA’s employee with the usual induction training prior to carrying out of 159 properties for a total value of $38.736 million. Of these,
his duties. The RTA also had a record of eight prior breaches. 26 properties were valued over $0.5 million each, with a total value
of $23.001 million.
In considering penalty the Court had regard to the serious nature of
the offence and also mitigating factors put forward by the RTA. These No properties valued greater than $5 million were sold.
included the RTA’s early plea of guilty, its dedicated commitment to a No properties were sold to people with family or business connections
safe working environment, its full co-operation with the WorkCover between the purchaser and the person responsible for approving
Authority in its investigation of the accident and the regard it has had the disposal.
to improvement of the already established RTA safety procedures.
Proceeds from property sales are returned to the Roads program.
The Court applied section 51A of the Occupational Health and Safety
Act which provides that an additional penalty may be imposed where All documents relating to the disposal of properties are available under
a Defendant has previously offended against the Act. The relevant the Freedom of Information (FOI) Act.
maximum penalty in this case was $750,000.
A penalty of $200,000 was imposed on the RTA in this matter.

RTA –v– Scroop and others


These proceedings arose out of a motor vehicle accident on the Hume
Highway while roadworks were being carried out by a contractor to the
RTA. The RTA had appealed the original findings that it was negligent
and that it had in certain circumstances a non-delegable duty of care
towards users of the road, and argued that it was entitled to be
indemnified by the contractor.
The Court of Appeal dismissed the RTA’s appeal and held that in the
circumstances the RTA had a non-delegable duty of care towards
highway users. The RTA filed an application for leave to appeal to the
High Court on the grounds that it does not owe a non-delegable duty
of care to road users where roadworks are carried out by a contractor
to it and that the RTA had not breached such a duty of care.
The High Court held that there was sufficient basis for a finding that
the RTA was negligent independently of any act or omission on the
part of its contractor (which finding was made by the trial Judge and
not upset by the Court of Appeal). Thus the Court considered that this
case was not a suitable vehicle to determine any question of general
principle with respect to a non-delegable duty of care.
Accordingly special leave to appeal to the High Court was refused.

RTA –v– Lonaport Pty Limited AND Chris Riley


Lonaport Pty Limited was the proprietor of a service station and was
authorised to conduct inspections of motor vehicles pursuant to the
Road Transport (Vehicle Registration) Regulations. Following show
cause letters being sent to this Company and to the authorised
examiner, a recommendation was made to the Committee of Review
provided for in the Regulations and the authorities of each were
cancelled on the grounds set out in the initial notice. The authorised
examiner and proprietor appealed to a Local Court. The Magistrate
conducted the appeal in the nature of judicial review of administrative
action and, based upon evidence of the authorised examiner and
authorised proprietor that they had not received the show cause letters
allowed the appeal. The RTA appealed to the Supreme Court which
held that the appeal provisions under the Road Transport (Vehicle
Registration) Regulation concerning decisions by the RTA to suspend or
cancel the relevant authorities is a hearing de novo. The jurisdiction of
the Local Court is to determine whether the authorities should be
cancelled in light of material before the Court whether or not that
material was before the RTA at the time the administrative action was
taken. On this basis the Supreme Court held that the Magistrate
misapprehended the nature of the jurisdiction and referred the matter
back to the Court for consideration accordingly.

(178) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 179

APPENDIX 15 APPENDIX 16
Year 2000 Millennium Bug Control Publications

The RTA’s Year 2000 Program ran for over 2 years, from September The RTA produces a wide range of publications to assist customers,
1997 until January 2000. It involved numerous people across all areas to promote road safety and new technology and to fulfil statutory
and at all levels of the organisation. requirements under annual reporting, environmental and freedom
of information legislation.
While the total cost of the Program at some $13 million was small
compared with many other projects tackled by the RTA, the extent, Publications on driver licensing, vehicle registration and road safety
depth and length of the Program made it one of the largest and most are available free from motor registries.
complex ever undertaken by the organisation.
Technical and Austroads publications are available for sale from the RTA
A Final Project Summary was produced which aims to summarise what Library at 52 Rothschild Avenue, Rosebery, Sydney, (tel 02 9662 5065).
was done, how it was managed, and the lessons learned, so as to The Library’s collection of books, journals and CD-ROMs include
provide a record and enable the learning to be applied to future large extensive coverage in the areas of road and bridge engineering, road
projects and programs. safety, environment and management.
The overall objective of the RTA’s systems to continue to operate The following new or substantially revised titles were issued during
normally during and after the changeover from 1999 to 2000 was 1999/2000.
achieved. Four minor problems occurred in programs in internal
corporate systems all of which were corrected very quickly. February 29
(leap year) was also overcome apart from another minor concern and Bicycles
other significant milestones remaining include 30 June and the roll over – Sydney Cycleways Map – Homebush Bay
from 2000 to 2001. However, all indications are that these will also be
successfully negotiated.
Bridges
As well as achieving a Y2K compliant environment the Year 2000 – Hume Highway – South Gundagai Interchange
Project was the catalyst for the delivery of other benefits to the RTA
including the: – Great Western Highway – Medlow Bath Bridge Replacement
– establishment of an inventory of IT systems and other items including
corporate and regional which will be useful for other post Y2K
Construction
activities
– Coopernook to Moorland EIS Summary
– opportunity was taken to rationalise the environment, removing old
– Cross City Tunnel Environment Assessment
and/or superfluous systems
– Cross City Tunnel – Release of EIS
– efficiency gains should be realised in some systems with the
– Upgrading the Pacific Highway – Progress to Date
consolidation of multiple machines into single units, and
– Yelgun to Chinderah Freeway brochure
– creation of business contingency plans which can be activated when
– Deviation of Illalong Creek on the Burley Griffin Way
interruptions to service occur as a result of a problem other than Y2K.
– All weather sealing of the Cobb Highway between Booligal and
Finally and overall, major areas of the organisation have been upgraded Ivanhoe
and improved where necessary to ensure a current and standard – Great Western Highway – Soldiers Pinch
operating environment. These include: – Route Development Study for The Entrance Road
– IT Infrastructure such as the central data centre, total desktop
environment and building systems
– All corporate applications such as DRIVES, Human Resource and Community newsletters
Financial systems – Barton Highway – Murrumbateman
– Road network facilities such as traffic lights and bridge and tunnels – Barton Highway Route Selection
systems – City West Link Road Section 3: Balmain Road, Leichhardt to
– Interfaces with external organisations, and Boomerang Street, Haberfield
– Several internal systems and items of equipment. – Coleman’s Bridge Study
– Coonabarabran Bypass Selection Study
– Country Timber Bridge Program: Bruxner Highway
– Country Timber Bridge Program: Summerland Way
– Dourrigans Gap Project Update
– Extension of Northern Distributor – Bellambi Lane to Princes Highway
– Five Islands Road Project
– Lidsdale Project (Castlereagh Highway)
– Moree Bypass
– Northern Distributor
– Proposed Bridge Replacement over Long Gully Creek
– Proposed Bridge Replacement over Morongila Creek (MR 56)
– Robinvale–Euston Bridge Replacement
– West Charlestown Bypass
– Wiangaree Project
– New crossing of the Murray River between Robinvale and Euston
– Great Western Highway – Shell Corner Realignment
– Mona Vale Road Upgrade
– Five Ways Roundabout, Miranda, Traffic Study
– Great Western Highway – Faulconbridge

(179) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 180

APPENDIX 16 (Continued)
Publications

Upgrading the Pacific Highway Road safety


– Bonville Deviation – Road Safety 2010
– Bray Street to Arthur Street, Coffs Harbour – 1999 Kids & Traffic Gazette
– Bulahdelah to Coolongolook Freeway – 1999/2000 RTA and Police Road Safety and Traffic Management
– Bulahdelah Upgrade of the Pacific Highway Action Planner
– Bundacree Creek to Possum Brush – 50 km/h Urban Street Limit Evaluation: interim report (October 1999)
– Coolongolook to Wang Wauk – Buyer’s Guide for Child Restraints
– Ewingsdale – Motorised Wheelchairs (Information for Motorised Wheelchair Safety)
– Halfway Creek – Pedestrian Crossings
– Proposed Duplication of Brunswick Heads Bypass & Upgrade – Preventing Driver Fatigue
Brunswick Heads to Yelgun – Puzzle Information Sheet (for inclusion with Early Childhood Road
– Raymond Terrace to Karuah Safety Jigsaw Puzzles)
– Tandys Lane – Research Report: Youth Road Safety in NSW – A Discussion Paper
– Road Safety for Overseas Visitors
– Safety Door Parent Note
Corporate – Tertiary resource folder
– 1999 Annual Report: 2,000 copies at a unit production cost of – The NSW Road Safety Education Program Catalogue: Early Childhood
$27.41. 2000 Annual Report: 2,500 copies are estimated to have a for Principals and Teachers
unit production cost of $30.85. – The NSW Road Safety Education Program Catalogue: Primary for
– Information Package for Volunteer Participation in NSW Interlock Trial Principals and Teachers
– FMI Learning Activities Guide – Their Safety in Our Hands
– Travelling the Pacific Highway – Taking a Break
– Annual Activity Report for Local Government Road Safety Officer
Driver licensing Projects – 1997/98
– New Driver’s Handbook – MR92 – Road Design, Nowra to Nerriga
– Mobility Parking Scheme – Beyond Nerriga – Route Options
– Points and Your Licence brochure – Move Ahead with Street Sense
– Road Users Handbook – Research Report: Working Together No 2 – Local Government Road
– Learner Driver Logbook Safety Program Activity Report
– Penalties – Serious Traffic Offence Penalties

Technology
Environment – RTA Guide to Maintenance of Concrete Pavements
– 1999 RTA Environment Report
– Parramatta ... a heritage of roads and transport
– Parramatta Heritage Fun Run 2000 Traffic management
– Roadside Management Guidelines Book 5: State Highway 27, – A step-by-step guide to roundabouts
The Golden Highway, Belford–Merriwa–Dunedoo–Dubbo – Australian Road Rules flyer
– Roadside Management Guidelines Book 6: Main Road 54, – New Road Rules for NSW booklet & brochure
Abercrombie River–Bathurst–Sofala–Ilford
– State Highway 6 – Bathurst to Marsden – Environmental Guidelines
for Road Construction & Maintenance Workers Vehicle registration
– State Highway 1 – Milton to Ulladulla Overtaking Lanes – Review of – 1998 NSW Driver & Vehicle Statistics Report
Environmental Factors – 4.6 Metre High Truck Routes and Loading Requirements
– Great Western Highway – Shell Corner Realignment – Review of – Check Your Vehicle’s Health
Environmental Factors – Registration Charges: National Heavy Vehicle Reform – Changes to
– Mona Vale Road Upgrade – Review of Environmental Factors Special Purpose Vehicles
– Great Western Highway – Linden Section 3 – Supplementary Review – Registration Charges: National Heavy Vehicle Reform – Questions &
of Environmental Factors Answers for Operators of Heavy Vehicles
– Great Western Highway – Linden Section 5, Review of Environmental – Registration – Stolen Vehicle Scams
Factors – Show Your Support for the Sydney 2000 Games

Freedom of Information
– Customer Information Directory 2000/2001
– Inside the RTA 2000/2001
– Interim Procedures for Dealing with Privacy Complaints and Reviews
of Conduct and Freedom of Information Internal Reviews
– Interim Procedures for Handling Applications for Information and to
Adjust Personal Information under FOI and Privacy Legislation

(180) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 181

APPENDIX 17
Details of payments to Consultants

Details of the amounts paid to consultants in 1999/2000 are provided below.

Project Consultant $
Information technology benchmarking services Compass Analysis 209,900
Road network and traffic analysis in respect of the
Sydney metropolitan road network Maunsell McIntyre Pty Ltd 77,490
Review and provide advice regarding the RTA’s
e-mail system and related services Compaq Computer Australia Pty Ltd 46,670
Road network and traffic analysis in respect of
the Sydney metropolitan road network Masson Wilson Twiney Pty Ltd 42,104
Consultants Costing $30,000 or less 5 62,870
Total 439,034

The RTA also engages numerous contractors for professional services not classified as consultancies,
including valuation, legal services, road and bridge design, investigation, construction supervision,
preparation of environmental impact statements, as well as contract agency services and personnel.

(181) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 182

APPENDIX 18
Account Payment Performance

Outstanding Accounts at 30 June 2000


Period Number of Claims Value
Current (within Due Date) 4,135 $38,193,312
< 30 Days Overdue 16 $22,808
31 – 60 Days Overdue 0 0
61 – 90 Days Overdue 0 0
> 90 Days Overdue 9 $2,090

For Past 12 Months Value


Percentage of Accounts Paid on Time 86.33%
Value of Accounts Paid on Time $2,004,898,072
Value of Accounts Paid $2,154,061,183

Details of any payment under clause 18 of the Public Finance and Audit Act.
This clause deals with interest payable to a supplier of goods and/or services where payment of the account is
not made within the determined time. The RTA’s financial system records indicate that there have been no
penalties for late payments during 1999/00.
During the financial year the RTA has continued to encourage its customers to utilise Electronic Funds Transfer
facilities to further improve payment performance throughout the RTA.

APPENDIX 19
Funds Granted to Non Government Community Organisations

Event/Sponsorship Description Organisation Cost Performance Area


Walk to Work day Encourage walking to work as part Pedestrian Council $25,000 Traffic and Transport
1/10/1999 of a transport strategy of Australia Directorate
Pedestrian Summit 1999 Conference to promote walking as a Pedestrian Council $10,000 Traffic and Transport
legitimate means of transport of Australia Directorate
RTA Big Bike Ride Promotion of safe cycling as part of Bicycle New South $141,000 Traffic and Transport
(From Tweed Heads to Sydney) Share the road with Bicycles Wales Directorate
Australian Hotels Association – Promotion of responsible service of Australian Hotels $5,000 Road Safety and Road
Patron Transport Safety Award alcohol and alternative transport with Association User Management
the aim of reducing road related injury Directorate
involving alcohol
1999 Engineering Excellence Awards Community and Environment Award Institute of Engineers $10,000 Corporate Services
Directorate
Angel II Cycle Classic Support for BikePlan 2010 by Westpac Rescue $10,000 Traffic and Transport
encouraging cycling as a viable Helicopter Service in Directorate
transport alternative and promoting the Hunter area
safe cycling
Australian Institute of Traffic Promotion of technical development Australian Institute of $3,000 Finance Directorate
Planning and Management and skills in Traffic Planning Traffic Planning and (Corporate Strategy)
and Management Management
ITS World Congress Support for Intelligent Transport Intelligent Transport $220,000 Strategic Projects
Systems World Congress to be held Systems Australia Directorate/Traffic and
in Sydney Transport Directorate

(182) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 183

APPENDIX 20
Driver and Vehicle Statistics and Heavy Vehicle Infringements

Figure 19 – NSW Licensed Drivers and Riders by Gender Year of Manufacture Total
Pre-1960 8,715
1960 to 1964 12,085
1965 to 1969 27,497
1970 to 1974 102,107
1975 to 1979 239,763

Male 53% Female 47%


1980 to 1984 532,349
2,191,153 licences 1,950,665 licences 1985 to 1989 823,047
1990 to 1994 984,697
1995 240,210
1996 235,607
1997 275,713
1998 316,331
1999 298,243
Figure 20 – NSW Licensed Drivers and Riders by Age Group 2000 108,376
Unknown 83,805
Total 4,288,545

16 & under 1.1% 40-49 20.5% Vehicle Usage Total


17 1.6% 50-59 15.8% Private 2,814,711
Pensioner Concession 554,925
18-25 13.7% 60-69 9.6%
Primary Producer Concession 103,746
26-29 8.5% 70-79 6.2% Business 673,125
Taxi 5,608
30-39 21.7% 80 & over 1.3%
Public Bus and Coach 6,437
FIRS 1,716
Other Vehicle Usages 128,277
Total 4,288,545
Figure 21 – NSW Licensed Drivers and Riders on issue as at end June 2000

Vehicle Type Total


Passenger Vehicles 2,705,526
Class HC 3% Class MC 0.3% Utilities and Vans 588,122
Trailers 624,389
Class HR 5.3% Class R 8.6%
Motorcycles 84,639
Class MR 2.2% Class C 79% Rigid Trucks 237,950
Buses 12,779
Class LR 1.5%
Plant 20,914
Prime Movers 14,226
Total 4,288,545

Offence numbers by Region, 1999/2000

Item Northern Hunter Southern Western South West Sydney Total


Defect notices (includes HVIS activities) 5,470 7,916 10,378 8,139 3,911 20,003 55,817
Traffic Infringement Notices 1,190 2,390 2,140 1,780 1,769 1,621 10,890
Breaches (weight and long hand) 193 1,616 3,903 1,020 232 759 7,723

(183) Roads and Traffic Authority Annual Report 2000


RTA FINANCIALS MELINDA 14.11 4/12/00 12:42 PM Page 184

INDEX

Aborigines – 47, 63, 167, 168


Advisory bodies – 158
Annual report costs – 180
Assets – 94–100, 109
Auditor-General’s report – 73
Chief Executive performance statement – 160
Code of conduct – 70
Consultants – 181
Customer service – 3, 13, 40
Disability plan – 63
Driver and vehicle statistics – 58
Eastern Distributor – 25, 58, 120, 124
Environment – 64, 124, 154
Equal employment opportunity – 167
Ethnic affairs – 63
Ethnic affairs priorities statement – 63
Financial statements – 14, 71
Freedom of information – 171
Funds granted to non-government community organisations – 182
Human resources – 166
Land disposal – 178
Legal change – 175
Major projects – 120, 127
Management structure – 6
Occupational health and safety – 62
Ombudsman – 171, 175
Overseas visits – 170
Payment of accounts – 182
Publications – 179
Recycling – 69
Research and development – 55, 69
Risk management and insurance – 164
Senior executive performance statements – 160
Staff numbers – 166, 168
Women’s strategy – 62
Year 2000 millennium bug – 109, 179

(184) Roads and Traffic Authority Annual Report 2000


RTA A_Report NEW GUTTER 30/11/00 10:00 AM Page 72

WHERE TO FIND US Northern Region Newcastle Major


31 Victoria Street Projects Office
Internet Grafton 2460 47 Darby Street
http://www.rta.nsw.gov.au PO Box 576 Newcastle 2300
Grafton 2460 Locked Bag 30
Head Office DX 7610 Grafton Newcastle 2300
Centennial Plaza Telephone 131 782 DX 7813 Newcastle
260 Elizabeth Street Facsimile 02 6640 1301 Telephone 131 782
Surry Hills 2010 Monday-Friday Facsimile 02 4929 5271
PO Box K198 8.30am–5.00pm Monday-Friday
Haymarket 1238 8.30am–5.00pm
DX 13 Sydney Southern Region
Telephone 131 782 71-77 Kembla Street Grafton Major
Facsimile 02 9218 6227 Wollongong 2500 Projects Office
PO Box 477 21 Prince Street
Motor Registries Wollongong East 2520 Grafton 2460
For information on vehicle DX 5178 Wollongong PO Box 546
registrations, drivers licences, Telephone 131 782 Grafton 2460
motor registry locations and Facsimile 02 4227 3705 DX 7610 Grafton
opening hours call 13 22 13 from Monday-Friday Telephone 131 782
anywhere in NSW. 8.30am–5.00 pm Facsimile 02 6640 1003
Monday-Friday
For all Regional offices, South Western Region 8.30am–5.00pm
call 131 782 from anywhere 1 Simmons Street
in NSW. Wagga Wagga 2650 Pacific Highway
PO Box 484 Development Office
Sydney Region Wagga Wagga 2650 21 Prince Street
Ground Floor DX 5407 Wagga Wagga Grafton 2460
83 Flushcombe Road Telephone 131 782 PO Box 546
Blacktown 2148 Facsimile 02 6938 1183 Grafton 2460
PO Box 558 Monday-Friday DX 7610 Grafton
Blacktown 2148 8.30am–5.00pm Telephone 131 782
DX 8120 Blacktown Facsimile 02 6640 1001
Telephone 131 782 Western Region Monday-Friday
Facsimile 02 9831 0926 51-55 Currajong Street 8.30am–5.00pm
Monday-Friday Parkes 2870
8.30am–5.00pm PO Box 334 Transport Management
Parkes 2870 Centre
Hunter Region DX 20256 Parkes 25 Garden Street
59 Darby Street Telephone 131 782 Eveleigh 1430
Newcastle 2300 Facsimile 02 6861 1414 PO Box 1625
Locked Bag 30 Monday-Friday Strawberry Hills 2012
Newcastle 2300 8.30am–5.00pm Telephone 131 782
DX 7813 Newcastle Facsimile 02 8396 1425
Telephone 131 782 Goulburn Major Monday-Friday
Facsimile 02 4924 0344 Projects Office 8.30am–5.00pm
Monday-Friday 211 Bourke Street To report traffic incidents
8.30am–5.00pm Goulburn 2580 131 700 (24 hours)
PO Box 183,
Goulburn 2580
Design and Production: Spatchurst

DX 5362 Goulburn
Telephone 131 782
Facsimile 02 4827 3744
Monday-Friday
8.30am–5.00pm
ROADS AND TRAFFIC AUTHORITY ANNUAL REPORT 2000
Page 2
1:04 PM
30/11/00
RTA A_Report Cover

You might also like