Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

KEY PLAN:

2050.0000
12000.0000
12000.000018000.0000
12000.000018000.0000
4200.0000
9000.0000
12000.00009000.00006000.0000
140000.0000
STP KAWASAN

LIMBAH
SANITASI
PVC SW ∅300MM BOP.-1700 PVC SW ∅300MM BOP.-1700

BOP.-1700
Y=21767.18
X=20895.53

400000.0000
∅300MM
SW
PVC
PEMBAKARAN
SAMPAH

BOP.-1700
∅300MM
MESIN

SW
PVC
POMPA
TANGKI AIR
AIR

PVC SW
DARI TUNNEL
∅150MM
UTILITY
BOP.-1400

CAT HITAM LEBAR 15 Cm CAT KUNING LEBAR 30 Cm CONVEYOR

R50000.0000
PVC SW ∅150MM x5
BOP.-1900 RUMAH
GENSET

X=20333.09 X=20337.49 LAMPU


PVC SW ∅150MM
Y=21605.32 Y=21605.32

∅200 ∅150 PVC


DOP
∅200
∅300

PVC SW ∅150MM BOP.-1900

DARI BANGUNAN VVIP

X=20338.96 ∅200 ∅300 PINTU MASUK


Y=21590.31
X=20334.31 Y=21585.66 ∅150 PVC
DOP
∅200 ∅200 BP. PIONER BETON PINTU MASUK
PVC SW ∅300MM BOP.-1700 PVC SW ∅300MM BOP.-1700 PVC SW ∅300MM BOP.-1700 PVC SW ∅300MM BOP.-1700 PVC SW ∅300MM BOP.-1700 PVC SW ∅300MM BOP.-1700 PVC SW ∅300MM BOP.-1700 BP. WASKITA PIPA

PVC SW
DARI BANGUNAN
∅150MM VVIP
BOP.-1900

TEPI DANAU

8.864
B9

Position)
Apron Sloped at 2.00%

(1st.
- 12.6/21.8
CIMC-TIANDA
CIMC-TIANDA
26000

26000

- 12.6/21.8

2.00%
at
(1st.

Sloped

Apron
Position)

Position)
TPS A

Apron Sloped at 2.00%

(1st.
- 12.6/21.8
CIMC-TIANDA
CIMC-TIANDA
26000

3 26000

- 12.6/21.8

2.00%
at
(1st.

Sloped
W=1500

Apron
Position)

Position)
PAGAR TEMPORARY

Apron Sloped at 2.00%

(1st.
- 12.6/21.8
CIMC-TIANDA
CIMC-TIANDA
26000

26000

- 12.6/21.8

2.00%
at
(1st.

Sloped

Apron
Position)
KETERANGAN :
PIER 1 : Jalur Truck Dump sampah (masuk)

Position)
Apron Sloped at 2.00%

(1st.
TPS B

- 12.6/21.8
: Jalur Truck Dump Sampah (keluar)
EXISTING STP KAWASAN

CIMC-TIANDA
CIMC-TIANDA
26000

: Jalur Mobil & Mixer (masuk) 26000 SANITASI

PIER 2

- 12.6/21.8
PVC SW ∅300MM BOP.-1700 PVC SW ∅300MM BOP.-1700 LIMBAH

2.00%
: Jalur Mobil & Mixer (keluar)

at
Sloped
(1st.

Apron
3

Position)

BOP.-1700
X=20895.53

: Tempat Pembuangan Sampah (TPS). Y=21767.18

Jarak TPS setiap 100m, dengan ukuran 4mx4m.

∅300MM
SW
PVC
PEMBAKARAN
SAMPAH

Position)
(1st.
- 12.6/21.8
PAGAR TEMPORARY

CIMC-TIANDA
26000

218

2.00%
at
Sloped
Apron
8.947 TAPPERING
09 B10

Position)
X=
18916.842

(1st.
- 12.6/21.8
Y=21650.134

CIMC-TIANDA
26000

BOP.-1700
2.00%
at

Sloped

Apron

∅300MM
MESIN
Z=10.005

SW
PVC
POMPA

40000
RED COUNTINUOUS LINE
TANGKI AIR
3

SCURITY LINE
AIR

GSE road JEMBATAN KABEL

Position)
TP 9
3 3

(1st.
- 12.6/21.8
tunnel utilitas
PVC SW ∅150MM BOP.-1400

tunnel utilitas
DARI TUNNEL UTILITY

CIMC-TIANDA
26000

ADHIMIX CONVEYOR

0+725

0+750

0+775

0+800

0+825

0+850

0+875

0+900

0+925

0+950

0+975
PVC SW ∅150MM x5
BOP.-1900 RUMAH

2.00%
90° 90° 70... 90° 90° 90° 90° 90° 90°

1+000

1+025

1+050

1+070
at
Sloped
GENSET

Apron
90° 90° 70... 70... 70... 70...
90° 90° 70... 70... 70... 70...
90° 90° 70... 70... 70...
90° 90° 90° 90° 90° 90° 90° 90° 90°

70... 1+070'

131.7468
70... 90° 30° 90° 90° 30°

70...
90° 70...
90° 90° 70... 70... 30° 70... X=20333.09 X=20337.49 LAMPU

90°
90° 70...
90° 70... 70... 90° 90° 90° 70... 70...
90° 90° 90° 90° 90° 90° 90° 30°

90°
90° 90°90°

6000
4000
TRAFO 70... 70...
90° 70... 70...
90° 90° 90° 6000
TRAFO Y=21605.32 Y=21605.32

12000 TRAFO TRAFO PVC SW ∅150MM

15000
TRAFO 450 450 450 700
1300
950 450 450 450 450 450 TRAFO ∅200 ∅150 PVC
DOP
∅200
∅300

1300
2600 2600 2600 2600 2600 2600 2700 2700 2700 41...
1900
450
8.7°
950
1600 2700 2700 2700 2600 2600 2600 2700 2700 5675

41..2.
41..1.
1500 PVC SW
DARI BANGUNAN
∅150MM VVIP
BOP.-1900 1+100

42..1.
1500

1500

42..1.

42..1.
1500

42..1.
1500

1500

42..1.

41..1.
1500

41...

1500

31..1.
1500

31..1.
1500
240
42..2.
1300 1300 42..2. 42..2.
1300 42..2.
1300 1300 42..2. 41..2.
1300 41..2.
41..1.
1300
1500 41..2.
41..1.
1300
1500 1500
1300 41..1.
41..2. 2300
950 32..2.
32..1.
1500
1300 32..2.
32..1.
1300
1500 32..2.
32..1.
1500
1300 1300 31..2.
1300 31..2.
1300 1500
1300 31..1.
31..2. 31..2.
31..1.
1300
1500

GALIAN KABEL

2500

2500

2500

2500

2500

2500

2500

2500

2500
-15° -15° -15° -15° -15° -15° 2500
-15° 2500
-15° -15° 2500
-15° 2600 -15° 2500 2500
-15° -15° 2500 -15° -15° -15° 2500
-15° 2500
-15°

42...
950 950 42... 42...
950 42...
950 950 42... 41...
950 950 950 950 41... 41...
1250
950 950 950 950 950 31...
950 31...
950 950 950 GUDANG & KANTOR 11 GALIAN KABEL Y=21590.31
X=20334.31 Y=21585.66
X=20338.96 PINTU MASUK PINTU MASUK

∅300
∅150 PVC
DOP
∅200 ∅200

1450 1450 1450 1450 1450 1450 41...


900 41...
900 900 41..1. 32..1. 32...
950 32...
950 32...
950 1500 1500 1500 950 31... 31...
950 PVC SW ∅300MM BOP.-1700 PVC SW ∅300MM BOP.-1700 PVC SW ∅300MM BOP.-1700 PVC SW ∅300MM BOP.-1700 PVC SW ∅300MM BOP.-1700 PVC SW ∅300MM BOP.-1700 PVC SW ∅300MM BOP.-1700 BP. PIONER BETON BP. WASKITA PIPA

10000000
41...
950 32...
950 AREA BATHCING PLAN

41002.89m
RUANG PVC SW ∅150MM BOP.-1900 1+125
17 FINISH LANTAI ±0.0 90°
950 90° 90°
2500 90° 90°
950 90° 90°
2500 90° 90°
1350
2600 90° 90°
1800 90° 90° 1200 90° 90°
1650 90° 90°
2500 90° 90°
2450 2450 90° 90°
2500 90° 90°
2500 90° 90°
2750 90° DARI BANGUNAN VVIP

KOLOM MIRING TYPE 4 OPRIT

1900

1900

1950
ES 42...
1600
1500 1500 42...
ES
1600 ES 42...
1600
1500
2850 ES ES 42...
1600
1500 1500
1600 42...
ES ES 41...
1600
1500
2850 ES ES 41...
1600
1500 41...
1600
1500 ES ES
1500 41...
1600 41...
750
1500 ES ES 32...
1500
1550 2900 ES
2900 32...
1550
1500 ES ES
2900 32...
1500
ES
1550 1500
1550
ES 31...
1550
1500 ES ES
2900 31...
1550
1500 ES ES 1500
1550
2900 31...
ES ES 31...
1550
1500 ES

14
14.9° 14.9° 14.9° 14.9° 14.9° 14.94° 14.91° 14.91° 14.91° 14.97° 14.97° 14.97° 14.97° 14.97° 14.97° 14.97° 14.97°

GALIAN KABEL TEPI DANAU

14.91°
1750

1850

1850

1900

1850

1850

1900

1850

1850

2300

2300

2300

2300

2300
42...
900
1500
1200
950 42...
1200
1500 42...
1200
1500
950
900 42...
900
1500
1200 42...
1500
950
1200 42...
900
1500
1200
950 42...
900
1500
1200 42...
1200
1500
950 41..2.
41...
900
1500
1200 1500
950
1200 41...
900
1500
1200
950 41...
900
1500
1200 41...
1500
950 41...
1500
1200
950 41...
900
1200 41...
1300
900
1500
950
450 1200
1500 32...
1500
800
950 32...
900
1500
1200 32...
900
1500
1200 32..2.
800
1500
950 32..2.
32...
800
900
1500
950
1200 31...
900
1500
1200
950 31..2.
31...
900
1500
950
1200 1500
1200 31..2.
31...
900
1500
950
1200 800
1500 31...
900
1500
1200 31...
31..2.
800
1500
950 31..2.
31...
900
1500
950
1200 1750
1500

1+150

1300

1300

1250

1300

1300

1400

1300

1300

1300

1300

1300

1300

1300

1300

1300

1300

1300

1200
ES ES

31..1.
90° 90°
2750 1750

1 9 10

42...

41..1.

41...

41...

32..1.

32..1.

32..1.

31..1.

31..1.

31..1.
ES

42...
90° ES
90°
950

ES
2500
90° ES
90°

ES

42...
90° ES
90°
950

ES
90° 2500 ES
90°

ES
90° 1350
2600 ES
90°

ES
90° 90°
1800 ES

ES
90° 90°
1200 ES

ES
90° 1650 ES
90°

ES
2500
90° ES
90°

ES
90°
2450 90°
2450 ES

ES
90° 90°
2500 ES

ES
2500
90° ES
90°

PARKIR 1 PARKIR 2
IN 1+175
OUT

-0.020

1 2 1+200
BARAK PEKERJA
3

14081,17
3

15931,81
5500.0000
2 3 4
3 3

6000.0000
Parkir Menginap KOLAM 1+225

4000.0000
4000.0000
TPS 1 TPS 2

6000.0000
Parkir Menginap

Restorant Tiang Listrik 5


Tiang Listrik GROUPSTAND
BUS TAXI STAND 6 LAKALANTAS
POS 1+250

4500.0000
Tiang Listrik Tiang Listrik LIMITED PRIVATE CAR STAND BAMBU

Tiang Listrik PAGAR


Tiang Listrik X=20065827.24 BATAS KWHP 7 8
Y=21425721.14 & SUBKON
3
1+275
PROYEK
PAGAR

KANTOR X=20162917.02 Area Parkir 9 KANTOR ADHI KARYA

R10000.0000
AKHIR KONSTRUKSI 1
DUCTING UTILITY T2 DAN
SUBKON
Y=21401771.70
8
MK & PIU 5000 3000 5000 2000 5000
3000 16000 2000 5600 400 42300 3000 6000

WORKSHOP Area Kontraktor


Sub. Kantor

4000
2500 2500 3000
4000 4000 4000 4000 2000
1400 1400 2000 14000 4000 4000 18300 ± 0,00 3000 1200
1800 1200

R20000.0000R24500.0000
6000
STA 0+469
FLY DCP 1+300

6500

1200

6000

1600
3000 2800 3000 4000

X=17933.0138
Y=21347.0341 Y=21386885.23
X=20056247.47 OVER muat
Bongkar

barang
2
Mobil Area
Karyawan
Parkir
20000 6000 4000

4000 ± 0,00 ± 0,00

7 5

13000
KWHP 16000 4000 32000

23800 8000 ± 0,00 3000

15 3 1 Parkir
Area

saluran
6000 4000 BAK

Jalan Cor Beton


13 VIP 4000 EXISTING
KONTROL

1+325

TYPE BORRING HDD


Y=21362935.79
X=20153337.24 Satpam
Pos 13000 SPBU

KARYA
PAGAR
ADHI
BM19

8000
X = 21378.459
Y 19734.737 14 4.1 5
3
PAGAR

Z = 9.196 m

6500
KARYA
ADHI

Jalan JALAN

Existing EXISTING

X=20231277.75 1+350
Y=21337520.68 Y=21337520.68
X=20267277.75

1.3
JALAN COR
BETON

BM20 C1
+0.10 ±0.00
Akses C2
+0.10 ±0.00
Akses C3
+0.10 ±0.00
Akses C4
+0.10 ±0.00
Akses C5
+0.10 MPS
X = 19815.789 20 KV
2.2
Satpam
Pos

Y = 21331.827 1
1.2 4.3
X=20231277.75 Y=21320520.68
X=20267277.75

Z = 10.174 m 1 1 Y=21320520.68 1 2.3 1+375


GUDANG SUB. TALANG
(8m x 15m)

RADAR ATC 1+400


3
NAIK NAIK KKOP-BM3
FIBER FIBER
XDA
PS2. XDE
XDD
XDC
XDB
PS2. XDH
XDG
XDF
PS2. XDK
XDJ
XDI
PS2. 20 KV
MPS OPTIK OPTIK
HOLE
MAN MSJ
PS2.
MSB
ER2A MCA
MSG
MSH
MSF
MSI
MSD
ER2A
PS2.
MSE MCB
MSC
MSA
MCF
ER2A
PS2.
MCC PS2.
XSk
ER1A XSj
XSi
XSh
XSg
XSf
XSe
ER1A
PS2. XSd
XSc
XSb
XSa
XCa
ER1A
PS2. 1+425
MSS
PS2.
MSK
ER2B MCD
MSO
MSM
MSR
MSQ
MSP
ER2B
PS2.
MSN MCE
MSL
MST
MCG
ER2B
PS2.
MCC PS2.
XSv
ER1B PS2.
XSu
XSt
XSs
XSr
XSq
XSp
ER1B XSo
XSn
XSm
XSl
XCb
ER1B
PS2.

HOLE
MAN

13
LOCKER 1+438
WANITA
R.GANTI
WC BM3A KKOP-BM3

5100
5100
SHOWER X = 18904.728 X = 18925.334
Y = 21204.594
Z 10.618 m Y = 21204.619
Z 10.909 m FIBER
OPTIK

X = 21243.9105
NAIK

JALUR PIPA HDD (3 X 2 BUNDLE)


PAC.P
PP.P Y = 21209.6466

X = 21243.9105
Bandara

Y = 21195.6639
Halte OPTIK
FIBER

Area Pengendapan taksi


Luas 4.600 m 2

0+000
HORISONTAL BORING
AWAL KONSTRUKSI

Saluran Terbuka
+14.923

RENCANA PANEL HK

0+025
EXISTING

+14.927
LT GH 126
+LANTAI
1.00 DASAR

DUCTING UTILITY PS3


X = 21243.9105
SOEWARNA Y = 21145.7211
SPITANK
14.348

PENAMBAHAN PANEL
RENCANA RUANGAN
JARLIS

2.dwg
PS
Perlengkapanya
Dan
KABEL\2015-12-29\KOP\PS2\Layout
INSTALASI
DETAIL
KABEL\ELEKTRICAL\NKA-JLS-GEN-ELC-DG-007
INSTALASI
DETAIL
KABEL\NKA-JLS-GEN-ELC-DG-007
JALUR
PROGRES\KABEL\DED
Kerjaan\KERJAAN
D:\Kerjaan\File
Xref
2.dwg
PS
Perlengkapanya
Dan
KABEL\2015-12-29\KOP\PS2\Layout
INSTALASI
DETAIL
KABEL\ELEKTRICAL\NKA-JLS-GEN-ELC-DG-007
INSTALASI
DETAIL
KABEL\NKA-JLS-GEN-ELC-DG-007
JALUR
PROGRES\KABEL\DED
Kerjaan\KERJAAN
D:\Kerjaan\File
Xref
1100

0+050
STA 0+000
14.129 PAGAR

saluran
13.899
13.340

11.680

11.667
13.280
13.817
13.330

TEBING
11.820

TEBING
11.756 saluran
14.042

X = 21243.9105
13.993
14.004
+14.605
13.967 14.074
13.424

13.901
+14.717 13.856 0+075
Y = 21145.7211
13.896

X=17583.7371
Y=21063.2541

0+100

Apron 1

0+125
Apron 1

0+150

PLN
F L2 F L1
2199 m2 2195 m2 0+175

0+200

CG 0+225

LAKE 2
0+250

0+275
PG 4

LAKE 1 0+300

PR

G L2
610,200 m2

-2,045

-2,255
18 ER 2A PINTU MASUK

ER 2B PINTU MASUK

1.dwg
Lantai
PS
KABEL\2015-12-29\KOP\PS2\Master
INSTALASI
DETAIL
KABEL\ELEKTRICAL\NKA-JLS-GEN-ELC-DG-007
INSTALASI
DETAIL
KABEL\NKA-JLS-GEN-ELC-DG-007
JALUR
PROGRES\KABEL\DED
Kerjaan\KERJAAN
D:\Kerjaan\File
Xref
10
9
LAKE 3

17

K. Pel.
C. M.

633
15 16 5

14 1

POS

Jalan F1
SKY CITY

73
A 51

Gardu
12
8 2

13
11

7
6

POS

SP 1

GRAPHIC SCALE
( IN METERS )
0

1 :000

A
A
SHOP DRAWING
36000 70000 28000 REVISI TANGGAL URAIAN

TAXIWAY

142,82
7000
1200

TANAH ASLI

NAMA PROYEK :

PENINGKATAN KAPASITAS DAN JARINGAN LISTRIK


BANDARA SOEKARNO - HATTA

PEMILIK PROYEK :
A

A
POTONGAN MEMANJANG BORRING
SKALA 1:500
PT. ANGKASA PURA II (Persero)

PUGUH KRISHBUDIHARDJO
CHIEF OF PIU UTILITAS DAN JARINGAN

MANAJEMEN KONSTRUKSI :

PT. RAYAKONSULT
Jalan Babakan Jeruk II No.34 - Bandung 40163

1 x PIPA 6"
7000

RACHMAT MULYADI
TEAM LEADER

KONTRAKTOR PELAKSANA :
138 138

MV95

248 248
NINDYA - ARIA, JOINT OPERATION
Jalan Letjend. Haryono MT. Kav. 22 - Jakarta 13630
PERENCANAAN NAMA TTD TGL
DIGAMBAR LOUNZEIN
SITE MANAGER
CONST MANAGER
KONTRAKTOR
DIPERIKSA NURBAQIN
DISETUJUI SETIAWAN
JUDUL GAMBAR

POTONGAN MELINTANG A - A DETAIL BORRING HDD


SKALA 1:30

HALAMAN : -
SKALA GAMBAR : NTS
NOMOR/KODE GAMBAR : NKA-JLS-GEN-ELC-DG-003B
TANGGAL GAMBAR : 20 MARET 2017

You might also like