Detail Borring HDD
Detail Borring HDD
2050.0000
12000.0000
12000.000018000.0000
12000.000018000.0000
4200.0000
9000.0000
12000.00009000.00006000.0000
140000.0000
STP KAWASAN
LIMBAH
SANITASI
PVC SW ∅300MM BOP.-1700 PVC SW ∅300MM BOP.-1700
BOP.-1700
Y=21767.18
X=20895.53
400000.0000
∅300MM
SW
PVC
PEMBAKARAN
SAMPAH
BOP.-1700
∅300MM
MESIN
SW
PVC
POMPA
TANGKI AIR
AIR
PVC SW
DARI TUNNEL
∅150MM
UTILITY
BOP.-1400
R50000.0000
PVC SW ∅150MM x5
BOP.-1900 RUMAH
GENSET
PVC SW
DARI BANGUNAN
∅150MM VVIP
BOP.-1900
TEPI DANAU
8.864
B9
Position)
Apron Sloped at 2.00%
(1st.
- 12.6/21.8
CIMC-TIANDA
CIMC-TIANDA
26000
26000
- 12.6/21.8
2.00%
at
(1st.
Sloped
Apron
Position)
Position)
TPS A
(1st.
- 12.6/21.8
CIMC-TIANDA
CIMC-TIANDA
26000
3 26000
- 12.6/21.8
2.00%
at
(1st.
Sloped
W=1500
Apron
Position)
Position)
PAGAR TEMPORARY
(1st.
- 12.6/21.8
CIMC-TIANDA
CIMC-TIANDA
26000
26000
- 12.6/21.8
2.00%
at
(1st.
Sloped
Apron
Position)
KETERANGAN :
PIER 1 : Jalur Truck Dump sampah (masuk)
Position)
Apron Sloped at 2.00%
(1st.
TPS B
- 12.6/21.8
: Jalur Truck Dump Sampah (keluar)
EXISTING STP KAWASAN
CIMC-TIANDA
CIMC-TIANDA
26000
PIER 2
- 12.6/21.8
PVC SW ∅300MM BOP.-1700 PVC SW ∅300MM BOP.-1700 LIMBAH
2.00%
: Jalur Mobil & Mixer (keluar)
at
Sloped
(1st.
Apron
3
Position)
BOP.-1700
X=20895.53
∅300MM
SW
PVC
PEMBAKARAN
SAMPAH
Position)
(1st.
- 12.6/21.8
PAGAR TEMPORARY
CIMC-TIANDA
26000
218
2.00%
at
Sloped
Apron
8.947 TAPPERING
09 B10
Position)
X=
18916.842
(1st.
- 12.6/21.8
Y=21650.134
CIMC-TIANDA
26000
BOP.-1700
2.00%
at
Sloped
Apron
∅300MM
MESIN
Z=10.005
SW
PVC
POMPA
40000
RED COUNTINUOUS LINE
TANGKI AIR
3
SCURITY LINE
AIR
Position)
TP 9
3 3
(1st.
- 12.6/21.8
tunnel utilitas
PVC SW ∅150MM BOP.-1400
tunnel utilitas
DARI TUNNEL UTILITY
CIMC-TIANDA
26000
ADHIMIX CONVEYOR
0+725
0+750
0+775
0+800
0+825
0+850
0+875
0+900
0+925
0+950
0+975
PVC SW ∅150MM x5
BOP.-1900 RUMAH
2.00%
90° 90° 70... 90° 90° 90° 90° 90° 90°
1+000
1+025
1+050
1+070
at
Sloped
GENSET
Apron
90° 90° 70... 70... 70... 70...
90° 90° 70... 70... 70... 70...
90° 90° 70... 70... 70...
90° 90° 90° 90° 90° 90° 90° 90° 90°
70... 1+070'
131.7468
70... 90° 30° 90° 90° 30°
70...
90° 70...
90° 90° 70... 70... 30° 70... X=20333.09 X=20337.49 LAMPU
90°
90° 70...
90° 70... 70... 90° 90° 90° 70... 70...
90° 90° 90° 90° 90° 90° 90° 30°
90°
90° 90°90°
6000
4000
TRAFO 70... 70...
90° 70... 70...
90° 90° 90° 6000
TRAFO Y=21605.32 Y=21605.32
15000
TRAFO 450 450 450 700
1300
950 450 450 450 450 450 TRAFO ∅200 ∅150 PVC
DOP
∅200
∅300
1300
2600 2600 2600 2600 2600 2600 2700 2700 2700 41...
1900
450
8.7°
950
1600 2700 2700 2700 2600 2600 2600 2700 2700 5675
41..2.
41..1.
1500 PVC SW
DARI BANGUNAN
∅150MM VVIP
BOP.-1900 1+100
42..1.
1500
1500
42..1.
42..1.
1500
42..1.
1500
1500
42..1.
41..1.
1500
41...
1500
31..1.
1500
31..1.
1500
240
42..2.
1300 1300 42..2. 42..2.
1300 42..2.
1300 1300 42..2. 41..2.
1300 41..2.
41..1.
1300
1500 41..2.
41..1.
1300
1500 1500
1300 41..1.
41..2. 2300
950 32..2.
32..1.
1500
1300 32..2.
32..1.
1300
1500 32..2.
32..1.
1500
1300 1300 31..2.
1300 31..2.
1300 1500
1300 31..1.
31..2. 31..2.
31..1.
1300
1500
GALIAN KABEL
2500
2500
2500
2500
2500
2500
2500
2500
2500
-15° -15° -15° -15° -15° -15° 2500
-15° 2500
-15° -15° 2500
-15° 2600 -15° 2500 2500
-15° -15° 2500 -15° -15° -15° 2500
-15° 2500
-15°
42...
950 950 42... 42...
950 42...
950 950 42... 41...
950 950 950 950 41... 41...
1250
950 950 950 950 950 31...
950 31...
950 950 950 GUDANG & KANTOR 11 GALIAN KABEL Y=21590.31
X=20334.31 Y=21585.66
X=20338.96 PINTU MASUK PINTU MASUK
∅300
∅150 PVC
DOP
∅200 ∅200
10000000
41...
950 32...
950 AREA BATHCING PLAN
41002.89m
RUANG PVC SW ∅150MM BOP.-1900 1+125
17 FINISH LANTAI ±0.0 90°
950 90° 90°
2500 90° 90°
950 90° 90°
2500 90° 90°
1350
2600 90° 90°
1800 90° 90° 1200 90° 90°
1650 90° 90°
2500 90° 90°
2450 2450 90° 90°
2500 90° 90°
2500 90° 90°
2750 90° DARI BANGUNAN VVIP
1900
1900
1950
ES 42...
1600
1500 1500 42...
ES
1600 ES 42...
1600
1500
2850 ES ES 42...
1600
1500 1500
1600 42...
ES ES 41...
1600
1500
2850 ES ES 41...
1600
1500 41...
1600
1500 ES ES
1500 41...
1600 41...
750
1500 ES ES 32...
1500
1550 2900 ES
2900 32...
1550
1500 ES ES
2900 32...
1500
ES
1550 1500
1550
ES 31...
1550
1500 ES ES
2900 31...
1550
1500 ES ES 1500
1550
2900 31...
ES ES 31...
1550
1500 ES
14
14.9° 14.9° 14.9° 14.9° 14.9° 14.94° 14.91° 14.91° 14.91° 14.97° 14.97° 14.97° 14.97° 14.97° 14.97° 14.97° 14.97°
14.91°
1750
1850
1850
1900
1850
1850
1900
1850
1850
2300
2300
2300
2300
2300
42...
900
1500
1200
950 42...
1200
1500 42...
1200
1500
950
900 42...
900
1500
1200 42...
1500
950
1200 42...
900
1500
1200
950 42...
900
1500
1200 42...
1200
1500
950 41..2.
41...
900
1500
1200 1500
950
1200 41...
900
1500
1200
950 41...
900
1500
1200 41...
1500
950 41...
1500
1200
950 41...
900
1200 41...
1300
900
1500
950
450 1200
1500 32...
1500
800
950 32...
900
1500
1200 32...
900
1500
1200 32..2.
800
1500
950 32..2.
32...
800
900
1500
950
1200 31...
900
1500
1200
950 31..2.
31...
900
1500
950
1200 1500
1200 31..2.
31...
900
1500
950
1200 800
1500 31...
900
1500
1200 31...
31..2.
800
1500
950 31..2.
31...
900
1500
950
1200 1750
1500
1+150
1300
1300
1250
1300
1300
1400
1300
1300
1300
1300
1300
1300
1300
1300
1300
1300
1300
1200
ES ES
31..1.
90° 90°
2750 1750
1 9 10
42...
41..1.
41...
41...
32..1.
32..1.
32..1.
31..1.
31..1.
31..1.
ES
42...
90° ES
90°
950
ES
2500
90° ES
90°
ES
42...
90° ES
90°
950
ES
90° 2500 ES
90°
ES
90° 1350
2600 ES
90°
ES
90° 90°
1800 ES
ES
90° 90°
1200 ES
ES
90° 1650 ES
90°
ES
2500
90° ES
90°
ES
90°
2450 90°
2450 ES
ES
90° 90°
2500 ES
ES
2500
90° ES
90°
PARKIR 1 PARKIR 2
IN 1+175
OUT
-0.020
1 2 1+200
BARAK PEKERJA
3
14081,17
3
15931,81
5500.0000
2 3 4
3 3
6000.0000
Parkir Menginap KOLAM 1+225
4000.0000
4000.0000
TPS 1 TPS 2
6000.0000
Parkir Menginap
4500.0000
Tiang Listrik Tiang Listrik LIMITED PRIVATE CAR STAND BAMBU
R10000.0000
AKHIR KONSTRUKSI 1
DUCTING UTILITY T2 DAN
SUBKON
Y=21401771.70
8
MK & PIU 5000 3000 5000 2000 5000
3000 16000 2000 5600 400 42300 3000 6000
4000
2500 2500 3000
4000 4000 4000 4000 2000
1400 1400 2000 14000 4000 4000 18300 ± 0,00 3000 1200
1800 1200
R20000.0000R24500.0000
6000
STA 0+469
FLY DCP 1+300
6500
1200
6000
1600
3000 2800 3000 4000
X=17933.0138
Y=21347.0341 Y=21386885.23
X=20056247.47 OVER muat
Bongkar
barang
2
Mobil Area
Karyawan
Parkir
20000 6000 4000
7 5
13000
KWHP 16000 4000 32000
15 3 1 Parkir
Area
saluran
6000 4000 BAK
1+325
KARYA
PAGAR
ADHI
BM19
8000
X = 21378.459
Y 19734.737 14 4.1 5
3
PAGAR
Z = 9.196 m
6500
KARYA
ADHI
Jalan JALAN
Existing EXISTING
X=20231277.75 1+350
Y=21337520.68 Y=21337520.68
X=20267277.75
1.3
JALAN COR
BETON
BM20 C1
+0.10 ±0.00
Akses C2
+0.10 ±0.00
Akses C3
+0.10 ±0.00
Akses C4
+0.10 ±0.00
Akses C5
+0.10 MPS
X = 19815.789 20 KV
2.2
Satpam
Pos
Y = 21331.827 1
1.2 4.3
X=20231277.75 Y=21320520.68
X=20267277.75
HOLE
MAN
13
LOCKER 1+438
WANITA
R.GANTI
WC BM3A KKOP-BM3
5100
5100
SHOWER X = 18904.728 X = 18925.334
Y = 21204.594
Z 10.618 m Y = 21204.619
Z 10.909 m FIBER
OPTIK
X = 21243.9105
NAIK
X = 21243.9105
Bandara
Y = 21195.6639
Halte OPTIK
FIBER
0+000
HORISONTAL BORING
AWAL KONSTRUKSI
Saluran Terbuka
+14.923
RENCANA PANEL HK
0+025
EXISTING
+14.927
LT GH 126
+LANTAI
1.00 DASAR
PENAMBAHAN PANEL
RENCANA RUANGAN
JARLIS
2.dwg
PS
Perlengkapanya
Dan
KABEL\2015-12-29\KOP\PS2\Layout
INSTALASI
DETAIL
KABEL\ELEKTRICAL\NKA-JLS-GEN-ELC-DG-007
INSTALASI
DETAIL
KABEL\NKA-JLS-GEN-ELC-DG-007
JALUR
PROGRES\KABEL\DED
Kerjaan\KERJAAN
D:\Kerjaan\File
Xref
2.dwg
PS
Perlengkapanya
Dan
KABEL\2015-12-29\KOP\PS2\Layout
INSTALASI
DETAIL
KABEL\ELEKTRICAL\NKA-JLS-GEN-ELC-DG-007
INSTALASI
DETAIL
KABEL\NKA-JLS-GEN-ELC-DG-007
JALUR
PROGRES\KABEL\DED
Kerjaan\KERJAAN
D:\Kerjaan\File
Xref
1100
0+050
STA 0+000
14.129 PAGAR
saluran
13.899
13.340
11.680
11.667
13.280
13.817
13.330
TEBING
11.820
TEBING
11.756 saluran
14.042
X = 21243.9105
13.993
14.004
+14.605
13.967 14.074
13.424
13.901
+14.717 13.856 0+075
Y = 21145.7211
13.896
X=17583.7371
Y=21063.2541
0+100
Apron 1
0+125
Apron 1
0+150
PLN
F L2 F L1
2199 m2 2195 m2 0+175
0+200
CG 0+225
LAKE 2
0+250
0+275
PG 4
LAKE 1 0+300
PR
G L2
610,200 m2
-2,045
-2,255
18 ER 2A PINTU MASUK
ER 2B PINTU MASUK
1.dwg
Lantai
PS
KABEL\2015-12-29\KOP\PS2\Master
INSTALASI
DETAIL
KABEL\ELEKTRICAL\NKA-JLS-GEN-ELC-DG-007
INSTALASI
DETAIL
KABEL\NKA-JLS-GEN-ELC-DG-007
JALUR
PROGRES\KABEL\DED
Kerjaan\KERJAAN
D:\Kerjaan\File
Xref
10
9
LAKE 3
17
K. Pel.
C. M.
633
15 16 5
14 1
POS
Jalan F1
SKY CITY
73
A 51
Gardu
12
8 2
13
11
7
6
POS
SP 1
GRAPHIC SCALE
( IN METERS )
0
1 :000
A
A
SHOP DRAWING
36000 70000 28000 REVISI TANGGAL URAIAN
TAXIWAY
142,82
7000
1200
TANAH ASLI
NAMA PROYEK :
PEMILIK PROYEK :
A
A
POTONGAN MEMANJANG BORRING
SKALA 1:500
PT. ANGKASA PURA II (Persero)
PUGUH KRISHBUDIHARDJO
CHIEF OF PIU UTILITAS DAN JARINGAN
MANAJEMEN KONSTRUKSI :
PT. RAYAKONSULT
Jalan Babakan Jeruk II No.34 - Bandung 40163
1 x PIPA 6"
7000
RACHMAT MULYADI
TEAM LEADER
KONTRAKTOR PELAKSANA :
138 138
MV95
248 248
NINDYA - ARIA, JOINT OPERATION
Jalan Letjend. Haryono MT. Kav. 22 - Jakarta 13630
PERENCANAAN NAMA TTD TGL
DIGAMBAR LOUNZEIN
SITE MANAGER
CONST MANAGER
KONTRAKTOR
DIPERIKSA NURBAQIN
DISETUJUI SETIAWAN
JUDUL GAMBAR
HALAMAN : -
SKALA GAMBAR : NTS
NOMOR/KODE GAMBAR : NKA-JLS-GEN-ELC-DG-003B
TANGGAL GAMBAR : 20 MARET 2017