Construction of Perimeter Fence & Drainage System
Construction of Perimeter Fence & Drainage System
LOCATION:
PROPONENT:
ESTIMATED BUDGET:
DURATION:
CODE
C0B01001
C0B01002
C0J00027
C0C01001
C0C01006
C0C01009
C0C01007
C0C2014
C0C2015
C2I20006
C0C01001
C0C01003
C0C06002
A. GENERAL REQUIREMENTS
Mobilization, Permits, Temfacil, Site Preparation, PPE's & Restoration of damages incured
during construction.
As-built documentation (end to end) services. SITE
Mobilization, prelimenaries & demobilization services for greenfield sites SITE
B. CONSTRUCTION OF PERIMETER FENCE
B.1 DEMOLITION/CHIPPING WORKS
Clearing works, Chipping works, Demolition works, Seggragation & Disposal.
Concrete/Masonry CU.M
B.2 EXCAVATION WORKS
Includes bracing, compaction of disturbed soil & disposal of unsuitable materials. CU.M
B.3 REBAR WORKS
Grade 33 Reinforcing steel bars. KG
B.4 CONCRETE WORKS (3000 psi)
3000 psi including formworks.
Concreting works for other civil works CU.M
Formworks SQ.M
B.5 MASONRY WORKS
5" CHB including rebars & plastering (2" x 1/2" joint plastered finish).
100mm thick CHB works SQ.M
Plastering Works SQ.M
B.6 METAL WORKS
Fabrication & Installation of angle bar (Tower parts, NGCP Supplied) support w/ barbed wire
including 1 coat epoxy primer & 2 coat epoxy enamel.
Perimeter fence barbed wire works (SMART Spec.) LM
C. CONSTRUCTION OF DRAINAGE SYSTEM
C.1 EXCAVATION WORKS
Includes bracing, compaction of disturbed soil & disposal of unsuitable materials. CU.M
C.2 SLOPE CUTTING & BACKFILLING
Slope Cutting of driveway (6m width, 10% Max. Slope with 100% Max. Side Slope including
disposal.
Excavation works for Soil CU.M
C.3 STONE MASONRY
Installation of Stone Masonry canals including construction of 1-set Concrete Manhole
Gabion works CU.M
Prepared by:
A. GENERAL REQUIRE
Mobilizatio
B. CONSTRUCTION OF
B.1 DEMOLITION/CHI
Clearing w
B.2 EXCAVATION WOR
C0C01001 Includes br
B.3 REBAR WORKS
C0C01006 Grade 33 Re
B.4 CONCRETE WORK
3000 psi i
B.5 MASONRY WORK
5" CHB incl
-
1.00 ₱ 9,759.00 ₱ 9,759.00
1.00 ₱ 108,662.00 ₱ 108,662.00
-
3.30 ₱ 1,011.00 ₱ 3,336.30
Demolition Works
Length of Wall (m) 3.00
Width of Wall (m) 0.13
Depth of Wall (m) 4.15
Volume for Demolition (cu.m) = L
xWxD 3.16
Width
Gravel Bedding Length (m) (m) Depth (m)
L W D
Column Footing (100mm THK) 1.00 1.00 0.10
Wall Footing (50mm THK) 3.20 0.40 0.05
Width
Form Works Length (m) Depth (m)
(m)
L W D
Column 0.30 0.30 3.40
Footing Slab 1.00 1.00 0.25
Wall Footing 3.20 0.40 0.20
Tie Beam 2.70 0.20 0.30
Lintel Beam 2.70 0.35 0.15
TOTAL AREA:
Std.
Diameter (mm) & Spacing
Rebar Works Weight
Commercial Length (m) (m) (kg)
D S SW
Column
RSB 16mm φ @ 6m length - 9.47
Lateral Ties 10mm φ @ 6m length 0.10 3.70
Footing Slab
RSB (x-axis) 16mm φ @ 6m length 0.15 9.47
RSB (y-axis) 16mm φ @ 6m length 0.15 9.47
Wall Footing
Longitudinal Bars 12mm φ @ 6m length - 5.33
Cross Bars 10mm φ @ 6m length 0.40 3.70
Tie Beam
RSB 12mm φ @ 6m length - 5.33
Stirrups 10mm φ @ 6m length 0.10 3.70
Lintel Beam
RSB 12mm φ @ 6m length - 5.33
Stirrups 10mm φ @ 6m length 0.10 3.70
TOTAL WEIGHT:
Std.
Diameter (mm) & Spacing
Rebar Works Weight
Commercial Length (m) (m) (kg)
D S SW
CHB rebars
Vertical Bars 10mm φ @ 6m length 0.60 3.70
Every 3
Horizontal Bars 10mm φ @ 6m length 3.70
Layers
Width
Concrete Works (3000psi) Length (m) Depth (m)
(m)
L W D
Column 0.30 0.30 3.40
Footing Slab 1.00 1.00 0.25
Wall Footing 3.20 0.40 0.20
Tie Beam 2.70 0.20 0.30
Lintel Beam 2.70 0.35 0.15
TOTAL VOLUME:
Width of Depth of
Masonry Works Length of wall (m) wall (m) wall (m)
L W D
2.70 0.13 2.50
5" Concrete Hollow Block 2.70 0.13 2.20
2.70 0.13 0.90
TOTAL QUANTITY:
Width
Masonry Works Length (m) Thickness/
(m) Depth (m)
L W D
Mortar in between 2.700 0.127 0.012
Mortar in Hollow Cores 0.200 0.400 0.127
Plastering 2.700 0.050 2.500
TOTAL VOLUME:
Backfill
Quantity
(pc/s) Volume (cu. m) Remarks
Q V=LxWxDxQ
66.00 6.60
4.00 0.26
L U = SW / L TL Q TW = U x TL x Q
L U = SW / L TL Q TW = U x TL x Q
LC = D/0.2 QC = L/0.4 TQ = LC x QC x Q
13.0 7.0 5,369.00
11.0 7.0 308.00
5.0 7.0 2,205.00
7,882.00
Q V=LxWxDxQ
7,882.00 421.627
31,528.00 1,281.298
7,882.00 5,320.350
7,023.28
118.65
Quantity Volume (cu. m)
(pc/s)
Q V=LxWxDxQ
66.00 3.56
66.00 16.50
4.00 1.02
97.56
Width Depth Quantity
Concrete Works Length (m) (m) (m) (pc/s)
L W D Q
Concrete Manhole Cover 0.75 0.75 0.10 1.00
Concrete Manhole 1.40 1.40 1.70 1.00
Headwall 0.85 0.75 0.10 1.00
Std.
Diameter (mm) & Spacing Length
Rebar Works Weight
Commercial Length (m) (m) (m)
(kg)
D S SW L
Concrete Manhole Cover
RSB (X-axis) 12mm φ @ 6m length - 5.33 6.00
RSB (Y-axis) 12mm φ @ 6m length - 5.33 6.00
RSB Handle Bar 16mm φ @ 6m length - 9.47 6.00
Concrete Manhole
RSB (X-axis) 12mm φ @ 6m length - 5.33 6.00
RSB (Y-axis) 12mm φ @ 6m length - 5.33 6.00
RSB Handle Bar 16mm φ @ 6m length - 9.47 6.00
TOTAL WEIGHT:
Volume (cu. m)
V=LxWxDxQ
0.06
3.33
0.06
Total
Unit Weight Quantity Total Weight (kg) Remarks
Length
(kg/m) (pc/s)
(m)
U = SW / L TL Q TW = U x TL x Q