TAPE

BASEPL - --- BASE PL

GROUT
-I-E:ti~~V ·~FDN.
GROUT

--~i.I.18
, A. BOLT
=>.~-

A. BOLTC-.-----'.--\ --T.O. ROUGH l$l\....---+-- A.BOLT SLEEVE


CONCRETE . --/-------r '":'
:/2' J~t~
FDN.
TAPE_

NOTE: STRETCHING LENGTH ~ THAT PORTION OF ANCHOR BOLT


ALLOWED TO FREELY STRETCH.

Figure 4.3: Anchor Bolt Stretch Length

4.3.5 Tightening Sequence

Anchor bolts should be tightened in two stages:

a. First stage should apply 50% of full pre-tension load to all bolts.

b. Second stage should apply full pre-tension load to all bolts.

Bolts should be tightened in a criss-cross pattern. (See Figure 4.4 for circular
bolt pattern sequence.)

;1
12 ...___- ~ __ . 5
8 /" . .,:
f
4L \ c EQUIPMENT
\ ~
10\ /~
\~T/'11
TIGHTENING SEQUENCE

Figure 4.4: Anchor Bolt Tightening Sequence

4-6