1.4Gk + 1.6Qk Gk + 1.4Wk 1.2(Gk+Qk+Wk) My v of col 397.9 213.0 336.2 My ^ of col 438.2 237.9 374.4 My < of col 270.8 144.9 229.4 My > of col 296.6 161.1 252.8
E-W STEEL BOTTOM TOP N-S STEELBOTTOM TOP
Ø16 Ø12 Ø16 Ø12 M = 296.6 0.0 M = 438.2 0.0 K' = 0.1558 b = 3300 3300 b = 2000 2000 min As = 0.13% d = 551.0 582.0 d = 567.0 594.0 K = 0.0085 0.0000 K = 0.0195 0.0000 z = 523.5 552.9 z = 538.7 564.3 As = 1293 0 As = 1857 0 Provide 2789 0 Provide 1857 0 No = 14 14 No = 10 10 As prov = 2815 1583 As prov = 2011 1131 fs = 141 14 T12 T2 fs = 283 10 T12 T1 Max clear S = 284.0 Max clear S = 284.0 Min clear S = 25.0 Min clear S = 25.0 Clear S = 227.4 Clear S = 191.1 14 T16 B2 10 T16 B1
BEAM SHEAR Critical section is 112.5 mm from pile centres
EW (NS plane) Ø10 links V = 624.4 v = 0.3434 As% = 0.155 . av = 537.5 vc 2d/av = 0.7783 (v - vc)b = 1320.0 No of legs = 14 Spacing = 350 14 Legs T10 @ 350 LINKS NS (EW plane) V = 417.3 v = 0.3680 As% = 0.177 . av = 1187.5 vc = 0.3972 (v - vc)b = 800.0 No of legs = 10 Spacing = 425 10 Legs T10 @ 425 LINKS
PUNCHING Column Face No other critical section
V= 1194.4 µ = 6504 d ave = 559 v= 1.257 v = 0.000 av = 537.5 v max = 4.733 ok vc 2d/av = 0.808 ok