Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

PENAWARAN HARGA PENGADAAN PARKIR PADANG

SPESIFIKASI TEKNIS 1 POS IN 1 POS OUT (MOBIL + MOTOR) MANLESS

HRG/
NO SPESIFIKASI BARANG UNIT QTY JUMLAH
UNIT
A INSTALASI JARINGAN DAN JASA
1 Setup Manless + Loop Coil Lot 1,500,000 1 1,500,000
2 Setup Barrier gate + Loop Coil Unit 1,500,000 2 3,000,000
Sub Jumlah A 4,500,000

B HARDWARE I
1 PC POS + LCD 16" [ POS KELUAR ] Unit 4,500,000 1 4,500,000
2 PC SERVER + LCD 16" Unit 6,500,000 1 6,500,000
3 PC ADMIN + LCD 16" Unit 4,500,000 1 4,500,000

Sub Jumlah B 15,500,000

C ACCESSORIES

1 Switch 8 Port UTP 10/100 Mbps Unit 450,000 3 1,350,000

2 Pinter Epson TM-T88iv Unit 3,950,000 2 7,900,000

3 UPS 600 Watt - APC Unit 750,000 4 3,000,000

5 Printer LX 300+ ESC Unit 2,000,000 1 2,000,000


Sub Jumlah C 14,250,000
0
D HARDWARE II 0
1 Interface Barrier Gate Unit 1,000,000 2 2,000,000

2 Barrier Gate MX50 15,500,000 2 31,000,000


3 Arm Gate MX50 Unit 2,250,000 1 2,250,000

Hexa@Tech Dispencer Ticket (+


4 20,000,000 1 20,000,000
Thermal Printer + Camera)

Sub Jumlah D 55,250,000


0
E PROGRAM SISTEM PARKIR 0
1 Sofware Parkir Hexa Manless Lot 20,000,000 1 20,000,000
Sub Jumlah E 20,000,000
0
F KAMERA 0

1 Camera (IP Camera) Set 1,750,000 1 1,750,000

2 Housing + Kabel Set 1,000,000 1 1,000,000

Sub Jumlah F 2,750,000

Total Investasi 112,250,000


Discont 10% 11,225,000
NETT 101,025,000
By Kirim 5,000,000

Total 106,025,000
Catatan
Jika ada kekurangan material akan dibahas lebih lanjut
Barang dikirim dua minggu setelah DP diterima.

Pembayaran
Termin 1
- 50 % pada saat PO diterima untuk Software dan Hardware
- 100 % untuk biaya kirim

Termin 2
- 50 % untuk barang setelah barang diterima.
- 50 % setelah program berjalan dengan baik. ( untuk software parking system )

You might also like