CALCULATION OF SHEATH DUCT FOR ONE GIRDER

VIA DUCT CH:57+850 Km TO CH:58+000


1-General Information :
Girder ID = MBT-1-1 *Total No of Girders = 18
Girder Length = 29.5 m
2-
. Calculation for Round Duct Length :
Profile Length Duct Diameter STD Duct Length No of Ducts
Tendon No
(mm) (mm) (mm) Required
T#1 29510.83 85 4000 8
T#2 29510.83 85 4000 8
T#3 29583.48 90 4000 8
3- Calculation for Couplers Length :
Coupler
Standard coupler No of Couplers Length of Coupler
Tendon No Diameter
Length (mm) Required (mm)
(mm)
T#1 400 88 7 2800
T#2 400 88 7 2800
T#3 400 93 7 2800
4- Round Duct required for one beam :
*
Total Length of Duct :
85 mm Duct Length for T1&T2 = 66.24 m
90 mm Duct Length for T3 = 33.12 m
*
Total Length of Couplers:
88mm Coupler Length for T1&T2 = 5.80 m
93mm Coupler Length for T3 = 2.90 m
5- Calculation for Flat Duct Length :

Profile Length Duct Diameter STD Duct Length No of Ducts


Tendon No
(mm) (mm) (mm) Required
T#1 5275 90x23 4000 2
T#2 5275 90x23 4000 2
T#3 8775 90x23 4000 3
T#4 8775 90x23 4000 3
6- Calculation for Couplers Length :
Coupler
Standard coupler No of Couplers Length of Coupler
Tendon No Diameter
Length (mm) Required (mm)
(mm)
T#1 400 93x26 1 400
T#2 400 93x26 1 400
T#3 400 93x26 2 800
T#4 400 93x26 2 800
7- Flat Duct required for one beam :
*
Total Length of Duct :
90x23 mm Duct Length for T1&T2 = 16.56 m
90x23 mm Duct Length for T3&T4 = 24.84 m
*
Total Length of Couplers:
93x26mm Coupler Length for T1&T2 = 0.83 m
93x26mm Coupler Length for T3&T4 = 1.66 m
* Including wastage