Pdfs

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

NOTES

. All dimensions are shown in


mm unless otherwise stated
swimming .Drawings are not to be scaled
pool only figured dimensions to be
6000 X 4000
used
22.751
.The contractor must check all
8.802
0.501
4.075
0.415
7.725 0.873 1.276
0.247
dimensions on site before
1.703 2.500 2.299 1.800 1.118 1.800 1.157 1.800 1.904 1.800 1.806 0.873 0.766 0.263
commencement of any work

0.550
0.550
CONSTRUCTION
0.271

0.221 0.207

. All slabs at ground level to be


0.693 0.643

Bathroom 1.071

poured over a 1000 gauge


2.500
3.042

RG

Guest Room
polythene sheeting on 50mm
0.271

Dining Area RG
3.187
1.800

Kitchen
Store thick stone dust on hardcore.
0.688

.All soils under slab and all


Laundry

0.643 0.693
0.214 0.214

around external foundation to be


1.500

0.800 1.071

treated for termites.


0.800
1.167

WEST ELEVATION CIVIL


6.136

0.677
13.328

Entrance
.All soils on cut embarkment to
1.500

be stabilised and the slope not to


1.500

Lobby
16.628

exceed the natural angle of


4.450
1.281

0.983

Living
repose.
1.000

Store Bathroom Washroom STRUCTURAL


1

Room 2
0.625

0.290

.Depth of foundation to be
4
5
1.245
4.150

Bathroom
determined on site
2.500

18
17
16
15
14
13
12

10
11

9
8
7
6

Garage
.All walls less than 200mm thick
1.025

to be reinforced
2.500
5.500

Study room
.All adjacent RC works and
masonary walls to be reinforced
1.755

Maid`s room
with whoop iron at every
alternate course.
1.798 2.500 2.004 0.250 1.800
0.250
0.956 1.800 1.904 1.800 4.301 1.800 3.088 MECHANICAL
6.302 2.300 15.650
24.252
.Minimum slope in drain pipes to
be 1%.
.No cases will be allowed in the
EAST ELEVATION slab for pipe sleeves.
.No cutting of concrete without
22.751 approval of S.E
200 1.500
0.457
1.500
8.802
0.427
1.500 1.652 1.500
0.026
0.841
4.075
1.500 1.734
0.743
1.500 0.942
7.725
1.000
0.404
1.500
0.188
1.000
0.448
0.873 1.276
0.171
0.873 1.105 0.044
.All testing pipes must be
completed before plastering.
ELECTRICAL
0.550
0.550
0.405

0.331 0.037 0.084 0.143

.All conduits must be laid before


1.071

plastering.
1.049 0.844

Bathroom
1.500

Master
3.042

bedroom 1
Bathroom

bedroom REVISIONS
0.416 0.721

bedroom 2
3.187
1.169
1.084

0.039 0.068 0.601


Bathroom

0.800 1.071
0.769 0.800 0.964
1.234
1.500
13.328

0.800

1.500

16.628

Lobby
10.286

4.650
1.500

0.678

NORTH ELEVATION
0.068

Corridor

Washroom
1.500

Bathroom
1.500

Void
bedroom 3 PROJECT:
0.523 0.203

PROPOSED RESIDENTIAL VILLA


0.585

Bathroom
2.300
1.500
1.500

0.200 0.277

Bathroom
TITLE:
TV Room
ARCHITECTURAL DRAWINGS
0.200
0.854
0.515

1.500

bedroom 4
2.800

CLIENT:
0.446

0.405 1.500
0.309
1.500 0.948
0.139 0.490
1.500 1.500
0.310 0.363
1.500 0.863 1.500 1.001 1.500 1.223
0.190
1.500 0.660
DRAWN: DESIGNED:
6.302 2.300 7.950 2.350 K.B.M K.B.M
18.902

SCALE:
1:100

SCALE:
SOUTH ELEVATION
1:100

You might also like