DAFTAR PERMINTAAN TOOLS DAN MATERIAL

PERSIAPAN PEKERJAAN DI UNIT 2

No. Tools & Material Permintaan Keterangan Peruntukan


1 Kunci Ring Pas 8 2 bh Hilang Install turbin, generator & Aux
2 Kunci Ring Pas 10 2 bh Hilang Install turbin, generator & Aux
3 Kunci Ring Pas 11 2 bh Hilang Install turbin, generator & Aux
4 Kunci Ring Pas 12 2 bh Hilang Install turbin, generator & Aux
5 Kunci Ring Pas 13 2 bh Hilang Install turbin, generator & Aux
6 Kunci Ring Pas 14 2 bh Hilang Install turbin, generator & Aux
7 Stang Kunci Shock pendek 2 bh Rusak Install turbin, generator & Aux
8 Kunci Ring Shock Panjang 1 set Belum diadakan Install turbin, generator & Aux
9 Dongkrak 10 Ton 2 bh 2 bh rusak Install turbin, generator & Aux
10 Fuller Panjang 0.01-1 mm 2 bh Belum diadakan Clearence Bearing Bearing
11 Obeng Ketok 2 bh Mata obeng + & - rusak Install turbin, generator & Aux
12 Tang Buaya 2 bh Rusak Install turbin, generator & Aux
13 Palu 5 kg gagang pendek 1 bh Hilang Install turbin, generator & Aux
14 Kikir 1 set Rusak Scrap Bearing
15 Tang spi 1 bh Belum diadakan Install turbin, generator & Aux
16 Pisau Scrap 1 set Belum diadakan Scrap Bearing
17 Mata gurinda potong 4 '' 2 dos Sisa 1 dos Install turbin, generator & Aux
18 Cat hijau merk ENVI 3 klg Habis Body generator
19 Baut & mur Uk. 24, panjang 10-15 cm 70 bh Belum diadakan Modifikasi duplex strainer
20 Baut & mur Uk. 30, panjang 10-15 cm 48 bh Belum diadakan Modifikasi duplex strainer
21 Flange 3'' (8 lubang baut) 4 bh Belum diadakan Modifikasi duplex strainer
22 Stop Kran 2'' 2 bh Belum diadakan Modifikasi duplex strainer
23 Cat Biru merk ENVI 2 klg Belum diadakan Modifikasi duplex strainer