LEVEL  3  SCHEDULE

Month1 Month 2 month 3 month 4


weeks 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Site and Soil Investigation
Mobilization Equipment,personal etc
Setting Out,Site Clearing and Leveling
Excavation and Trenching
Concrete works , Drill Pad etc
Road works
Laydown Area
Fence work 
Drainage work
Gate house  , Utility Structures etc
Demobilization, Closeout and lessons learnt 