Professional Documents
Culture Documents
Api RP 4G
Api RP 4G
Masts/Derricks/Substructures
2007 Maxima
CAR FAX
Operators Interest in API RP 4G
Documentation
Documentation
Documentation
Objective of RP4G
• Category 1
• Category 2
• Category 3
• Category 4
Proper Handling, Storage
and Inspections
• Pad Eyes
• Load Area
• Wear
• Temperatures
Location Preparations
• Soil Integrity
g y (Load
( Bearing
g Capacity)
p y)
• Cellar Preparation
• Drainage
Inspection Forms
• List
Li t for
f Repair
R i or Replacement
R l t Limits
Li it (guideline)
Recap
Questions?
Answers?