Professional Documents
Culture Documents
Issue Record: Key Plan
Issue Record: Key Plan
KEY PLAN
ISSUE RECORD
GOOD FOR CONST PRELIMINARY DESIGN
DESIGN DEVELOPMENT TENDER DRAWINGS
REFERENCE DRAWING :-
LEGENDS : ABBREVIATIONS
REVISION CONTROL
MANAGER (DC)
PROJECT NAME :
CONTRACT ID : MEGA/DDC/DEPOT/N-S/1
DRAWING NAME/TITLE :
DRAWING NO. :
REV. SHEET NO. :
1 OF 2
G-GD-S-11-03
SCALE : AS SHOWN R0 DATE : 17.02.2017
IT IS CERTIFIED THAT DETAILED DESIGN PREPARED IS COMPLIED WITH THE TERM & CONDITION OF
CONTRACT AND WE OWN FULL RESPONSIBILITY FOR DESIGN, ADEQUACY & MEETING FUNCTIONAL,
PERFORMANCE AND OPERATIONAL REQUIREMENTS INCLUDING CONSIDERATION FOR INTERFACE
REQUIREMENT OF OTHER CONCERNED DESIGNER/ CONTRACTOR AND COMPLIANCE TO STANDARDS,
NORMS, SAFETY AND STATUTORY RULES & REGULATIONS.