Definition
The counterfactual
Counterfactual analysis is also called with versus without (see Annex A for a
glossary). This is not the same as before versus after, as the situation before may
differ in respects other than the intervention. There are, however, some cases in
which before versus after is sufficient to establish impact, this being cases in which
no other factor could plausibly have caused any observed change in outcomes (e.g.
reductions in time spent fetching water following the installation of water pumps).
A properly designed impact evaluation can answer the question of whether the
program is working or not, and hence assist in decisions about scaling up. However,
care must be taken about generalizing from a specific context. A well-designed
1
“The central objective of quantitative impact evaluation is to estimate… unobserved
counterfactual outcomes” Impact Evaluation: methodological and operational issues, Asian
Development Bank, September 2006; and “determining the counterfactual is at the core of
evaluation design”, Judy Baker Evaluating the Impact of Development Projects on Poverty,
World Bank, 2000.
2
See the DAC Evaluation Network report, Evaluation Feedback for Effective Learning and
Accountability Report No 5, OECD Evaluation and Effectiveness Series, OECD (2001) for a
fuller discussion of these functions of evaluation.
1
impact evaluation can also answer questions about program design: which bits work
and which bits don’t, and so provide policy-relevant information for redesign and the
design of future programs. We want to know why and how a program works, not just
if it does.
It is not feasible to conduct impact evaluations for all interventions. The need is to
build a strong evidence base for all sectors in a variety of contexts to provide
guidance for policy-makers.
The following are examples of the types of intervention when impact evaluation
would be useful:
• Innovative schemes
• Interventions for which there is scant solid evidence of impact in the given
context
3
See the report for the DAC Evaluation Network Results-Based Management in Development
Co-Operation Agencies: a review of experience (2000), for a discussion of the relationship
between evaluation and results-based management (RBM). The UNEG Task Force on
Evaluation and Results Based Management is currently examining this relationship in further
detail.
4
This list is adapted from Baker op. cit.
2
Establishing the program theory
The program theory documents the causal (or results) chain from inputs to
outcomes.5 The theory is an expression of the log frame, but with a more explicit
analysis of the assumptions underlying the theory. Alternative causal paths may also
be identified. The theory must also allow for the major external factors influencing
outcomes.
A theory-based evaluation design tests the validity of the assumptions. The various
links in the chain are analyzed using a variety of methods, building up an argument
as to whether the theory has been realized in practice.
Using the theory-based approach avoids ‘black box’ impact evaluations. Black box
evaluations are those which give a finding on impact, but no indication as to why the
intervention is or is not doing. Answering the why question requires looking inside the
box, or along the results chain.
A major concern in selecting the evaluation approach is the way in which the problem
of selection bias will be addressed. How this will be done depends on an
understanding of how such biases may be generated, which requires a good
understanding of how the beneficiaries are identified by the program.
Figure 1 (Annex B) shows a decision tree for selecting an evaluation approach. The
basic steps in this decision tree are as follows:6
5
Chaper 3 of Carol Weiss (1998), Evaluation, gives an exposition of program theory. Both the
IFAD and AfDB impact evaluation guidelines strongly espouse a theory-based approach.
6
The various approaches are discussed in a number of sources, including the ADB booklet,
Impact Evaluation, Baker op cit, and Martin Ravallion (1999) The Mystery of the Vanishing
Benefits: Ms Speedy Analyst’s Introduction to Evaluation, World Bank Policy Research
Working Paper 2153.
3
Designing the baseline survey
Ideally a baseline survey will be available so that double difference estimates can be
made. Important principles in designing the survey are:
Evaluations are often conducted ex post, and there is no baseline available. Under
these circumstances the following options can be considered:8
1. If treatment and comparison groups are drawn from the same population
and some means is found to address selection bias (which will have to be
quasi-experimental, since randomization is ruled out unless the treatment
had been randomized, but if the program designers had thought of that
they will have thought of a baseline also), then a single difference
estimate is in principle valid.
7
Baker, op cit., allows nine months from survey design to obtaining cleaned data.
8
Partly based on the discussion in the IFAD impact evaluation guidelines.
4
they were), so it is useful to refer to some widely known event as a time
benchmark for recall questions.
4. If all the above fail, then the study was make build a strong analysis of the
causal chain (program theory). Often a relatively descriptive analysis can
identify breaks in the chain and so very plausibly argue there was low
impact.
Sometimes secondary data can be used to carry out the whole impact study,9 this is
especially true when evaluating national or sector-wide interventions. More usually
secondary data can be used to buttress other data. For example, a project data set
could be used for the treatment group and a national data set used to establish the
control, preferably using a matching method. Or different national data sets might be
joined to enable a rigorous regression-based approach to be employed.
Many evaluations under-exploit qualitative methods, both in the techniques they use
and the way in which analysis is undertaken. It is all too common to restrict data
collection to key informant interviews and perhaps a few focus groups. But there are
a far greater range of qualitative data collection methods, which can often produce
more robust findings than can quantitative methods. Field experience by members of
the core evaluation team (i.e. the people responsible for design and writing the final
report) is an invaluable source of qualitative data which should not be overlooked..
And field experience means literally the field, not only meetings with government and
project officials. It is very desirable to get such exposure very early on in the study so
it can help inform the evaluation design. Return trips are also advisable to help
elucidate the findings.
Triangulation
Evaluation findings are strengthened when several pieces of evidence point in the
same direction. Often a single data set will allow a variety of impact assessments to
be made. Better still if different data sets and approaches can be used and come to
broadly the same conclusion. Qualitative information can also reinforce findings and
add depth to them. Where a rigorous approach has not been possible then
9
For further discussion see Michael Bamberger Conducting Quality Impact Evaluations under
Time and Budget Constraints, 2006, World Bank.
10
For further discussion see Michael Bamberger (2000) Integrating Quantitative and
Qualitative Methods in Development Research, World Bank and Weiss op. cit.
5
triangulation is all the more necessary to build a case based on plausible
association.11
Terms of reference
The ToR for an impact evaluation should also stress the need for a credible
counterfactual analysis. Proposals or concept notes should make clear how this
issue will be addressed, being explicit about the evaluation approach. The evaluation
team need include personnel with the technical competence to implement these
methods.
Data sources
Good quality data are essential to good impact evaluation. The evaluation design
must be clear on the sources of data and realistic about how long it will take to collect
and analyze primary data.
The time required for an impact evaluation depends on whether primary data
collection is involved. If so, 18 months is a reasonable estimate from inception to final
report. If there is no primary data collection then 12 months may be feasible.
The survey is largest cost component of an impact evaluation. If primary data are
being collected then the total cost of a survey is approximately US$ 100 per
household in Africa and Latin America, US$ 40-60 in East Asia and US$ 25-40 in
South Asia. Analysis time is 3-4 months of professional level inputs.
Peer review
11
This is the approach advocated in the AfDB impact evaluation guidelines.
6
ANNEX A GLOSSARY
With versus without: ‘with‘ refers to the outputs and outcomes with the intervention
(the factual), which are compared with the outputs and outcomes ‘without’ the
intervention (the counterfactual) to determine the impact of the intervention, though
single or double difference estimates.
Single difference: the difference in the output or outcome either (1) before versus
after the intervention, or (2) between project and comparison groups. Before versus
after is not a good impact measure as it fails to control for other factors. The single
difference project versus comparison groups fails to allow for differences between the
two groups which may have existed prior to the intervention. The double difference
takes care of these two problems.
7
Annex B Decision Tree for Selecting Evaluation Design to Deal with Selection Bias
Implement an ex
ante randomized
Yes
experimental
design
Is a Implement a
randomized suitable quasi-
Yes Yes
design experimental
feasible? design
Is evaluation
Is selection Use panel
being
No based on Yes data based
designed ex
observables? design
ante?
Are the
No No unobservables
time invariant?
Is selection
based on No
observables?
Use the
pipeline Yes Yes
approach