Professional Documents
Culture Documents
Madhya Pradesh Laghu Udyog Nigam LTD (M.P. Government Undertaking) First Floor, Panchanan Bhavan, Malviya Nagar, Bhopal
Madhya Pradesh Laghu Udyog Nigam LTD (M.P. Government Undertaking) First Floor, Panchanan Bhavan, Malviya Nagar, Bhopal
EXPRESSION OF INTEREST
M.P. Laghu Udyog Nigam Limited (M.P. Government Undertaking), is in the process of
implementing ERP Solution in Head Office, Bhopal and its Branch Offices. Applications
are invited from organisation or individual person(s) having desired experience and team
of professionals up to 3.00 p.m. on 15/09/09. The detailed eligibility criteria, terms and
conditions etc. can be obtained from office of Chief General Manager (Mktg), MPLUN,
1st Floor, Panchanan Bhavan, Malviya Nagar, Bhopal. This can also be downloaded from
website https://mpeprocurement.com.
MANAGING DIRECTOR
MADHYA PRADESH LAGHU UDYOG NIGAM LTD
(M.P. Government Undertaking)
FIRST FLOOR, PANCHANAN BHAVAN, MALVIYA NAGAR, BHOPAL
EXPRESSION OF INTEREST
1. Purpose:
• The consultant will conduct a detailed system requirement study and provide a
system requirement specification (SRS) manual which shall include technology
and all functional requirement of the Nigam. The vendor is also expected to carry
out and document a detailed current assessment study for all business activities of
functional area of the Nigam's existing business and operations.
The following main activities will be covered under the Scope of Work:-
39642223.doc 2
• To-be-Process - After analyzing performance of the "To-be-Process " consultant
shall conduct a comparative analysis of each functionality / process with the best
practices of ERP.
• Gap analysis reports
• Customization requirement report
• Acceptance test procedure document.
b. Design network (LAN/WAN) among the Users and recommending requisite
hardware and software for the same, taking into consideration of existing
Hardware & Software.
c. Recommend suitable ERP package considering core business process of MPLUN
d. Help in scrutinizing offers received or the ERP implementation on the basis of
qualification criteria and technical merits on the basis of this study.
e. Supervisions at various implementation stages and take responsibility till the
system is successfully commissioned (go live) upto 3 months of Hand holding
with the selected vendor.
3. Submission of Proposals : Proposals are to be submitted in Two Bid
System by 15.9.09 (3.00 p.m.)
Managing Director, MPLUN
First Floor, Panchanan Bhavan,
Malviya Nagar, Bhopal
(The envelopes containing proposal should be dropped in drop box situated at MPLUN,
2nd Floor, Panchanan Bhawan, Bhopal, upto 3.00 p.m. dated 15.9.09.
Part-A : Technical Bid - details about the firm, Key persons / Professionals
alongwith their qualification and experience mentioning the team
likely to be engaged if selected for the consultancy. Details of
methodology to be adopted in the study and broad basis of
recommendations of ERP. Time frame for the study, reference list /
credentials of similar work done by the firm alongwith in details of
assignment, time taken and comment on outcome. Current
assignment in Hand, copy of Income Tax, PAN, financial status, any
other information, which Bidder feels relevant in support of its bid
Qualifying Criteria:
a. Consultants who have executed at least two similar work or have experience of ERP
package implementation or conducted Business Process Re-engineering
with the aim of ERP, implementation with large engineering
39642223.doc 3
manufacturing organization. Preference will be given to those who have
executed ERP implementation in Semi Govt. / Govt. Sector.
b. Should have experience in handling E-commerce, Finance, HR, Pay-roll, Materials
Management, Maintenance, Inventory Management, Procurement etc.
c. Experience in handling large organization with multifarious activities, such as
government procurement, raw material depot, construction, testing labs
and handicraft / handloom emporia (retail outlets).
i.
Consultancy work for selecting ERP package.
ii.
Experience in business process re-engineering
iii.
Experience in implementation of ERP package.
iv.
Experience in dealing with large organization with multifarious activities,
such as government procurement, raw material distribution, construction
activities, testing labs and (retail outlets). (Certificates should be
enclosed).
Payment terms: 25% on preparation of FRP remaining payments, as per
implementation phases of FRP (% wise) maximum up to 50%. Final
payment of remaining 50% amount will be made after 6th month of hand
holding.
The selected consultant have to do the agreement with MPLUN Ltd. on Rs. 100/- stamp
paper before assigning the work.
For any clarification representatives of the Bidders may visit office of MPLUN
(MADHYA PRADESH LAGHU UDYOG NIGAM) at the above address and can
get in touch with Chief General Manager(Mkt.) / (BDC) and General Manager
(BDC).
39642223.doc 4