Professional Documents
Culture Documents
CFRP Application Procedure
CFRP Application Procedure
Step 1
Step 2
Step 3
Mix primer part A and part B together. Stir well for 5 minutes.
Step 4
Apply primer on the steel surface using a brush in a particular direction. Let it air dry for 45
minutes.
Step 5
Step 6
Step 7
Step 8
Use ribbed roller starting from middle to the end until glue penetrates through CFRP layer.
Step 10
Apply adhesive on top of CFRP and use round roller and ribbed roller in fibre direction.