Single Pile Group ECC Rectification - Compensation Pile Date: 02/10/2017

Pile Group Z2-101


Size Capacity
Original Pile 400 Square 1800 kN
Compensation Pile 300 Square 1012.5 kN
Minimum Pile Distance,L 1000 mm

Design Load, P 1300 kN

Ecc X -100 mm
Ecc Y -50 mm
Distance of original pile from Origin 111.8 mm
L1 =SQRT(EccX^2+EccY^2)

Compensating distance on x -894 mm


Lx =L/L1*EccX
Compensating distance on y -447 mm
Ly =L/L1*EccY
Distance of Compensation Pile from Origin, L2 888.2 mm

Compensation Pile X 794 mm


=EccX-Lx
Compensation Pile Y 397 mm
=EccY-Ly

By Beam Theory
Beam Length = L 1000 mm
Point Load Acting at L1 111.8 mm

Reaction load at original Pile =P*L2/L 1155 kN


< 1800kN OK
Reaction load at CompensatingPile=P*L2/L 145 kN
< 1012.5kN OK

Max Moment = 129 kNm

By Beam Design
Proposed Width = 850 mm
Proposed Depth = 1100 mm
Assume Cover + Pile penetration =200
= 200 mm
d = 900 mm
Grade Concrete = 35 Mpa
K = 0.003586 <0.156 Tension Steel Only
Tension Steel Req = 330.21 mm2
Min steel Req(0.13%) = 1215.5 mm2
Prov steel = 4T20
= 1256 mm2

As load will be directly bear on Original Pile, Check Shear due to compensation pile
V = 0.189993 N/mm2
vc = 0.282579 N/mm2

2d/av = 2.026578
enhanced vc = 0.572669
No Shear Reinforcement Required