Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

EPC-2 FLOWLINE, TRUNKLINE AND PIPELINE OF BLOCK A GAS DEVELOPMENT PROJECT ACEH PT.

KEL

GAUGING REPORT
Line Dia : Report No : Date :
Joint No : From to
Section : From KP to KP

Piggging Direction from : (KP) to (KP)

OD (Inch) Wall Thick (mm) ID (mm) Grade Length (KM)

Min : Min :

Max : Max :
Compressor : Pressure Gauge : Serial No.

Make : Location : Model : Output


: Max.Pressure :

Gauge Plate Start End Avg. Velocity


(Km/Hr)
Dia (mm) Thk (mm) Material Date Time Date Time

Enclosure: Photograph Of Gauge Plate Before & After Run


Details of Gauge Plate Damages If Any:

Remarks :
Prepared by: Endorse by: Review by: PT. KELSRI
PT. Medco E&P Malaka PJIT
Prepare by, Approved QA/QC Manager
/ Coordinator

Name: Name: Name: Name: Date : Date


Date : Date :
JECT ACEH PT. KELSRI

port No : Date :

Volume (m3)

Range Calibration Due

Pressure (Bar or Kg/cm2)


Min Max
PT. KELSRI

Name: Date : Date :

You might also like