Professional Documents
Culture Documents
SJ-20101208143956-015-ZXWN MSCS (V4.10.13) MSC Server Parts Replacement Guide
SJ-20101208143956-015-ZXWN MSCS (V4.10.13) MSC Server Parts Replacement Guide
SJ-20101208143956-015-ZXWN MSCS (V4.10.13) MSC Server Parts Replacement Guide
MSC Server
Parts Replacement Guide
Version: V4.10.13
ZTE CORPORATION
NO. 55, Hi-tech Road South, ShenZhen, P.R.China
Postcode: 518057
Tel: +86-755-26771900
Fax: +86-755-26770801
URL: http://ensupport.zte.com.cn
E-mail: support@zte.com.cn
LEGAL INFORMATION
Copyright © 2011 ZTE CORPORATION.
The contents of this document are protected by copyright laws and international treaties. Any reproduction or
distribution of this document or any portion of this document, in any form by any means, without the prior written
consent of ZTE CORPORATION is prohibited. Additionally, the contents of this document are protected by
contractual confidentiality obligations.
All company, brand and product names are trade or service marks, or registered trade or service marks, of ZTE
CORPORATION or of their respective owners.
This document is provided “as is”, and all express, implied, or statutory warranties, representations or conditions
are disclaimed, including without limitation any implied warranty of merchantability, fitness for a particular purpose,
title or non-infringement. ZTE CORPORATION and its licensors shall not be liable for damages resulting from the
use of or reliance on the information contained herein.
ZTE CORPORATION or its licensors may have current or pending intellectual property rights or applications
covering the subject matter of this document. Except as expressly provided in any written license between ZTE
CORPORATION and its licensee, the user of this document shall not acquire any license to the subject matter
herein.
ZTE CORPORATION reserves the right to upgrade or make technical change to this product without further notice.
Users may visit ZTE technical support website http://ensupport.zte.com.cn to inquire related information.
The ultimate right to interpret this product resides in ZTE CORPORATION.
Revision History
I
3.4 Replacing a NFCM ............................................................................................. 3-5
3.5 Replacing a Dustproof Screen............................................................................. 3-6
Figures............................................................................................................. I
Tables ............................................................................................................ III
Glossary .........................................................................................................V
II
About This Manual
Purpose
The purpose of this manual is to provide procedures and guidelines that support the parts
replacement of ZXWN MSCS.
Intended Audience
This manual is intended for the following person:
l The professional engineers who master the basic communication knowledge.
l The engineers who want to know component replacement of ZXWN MSCS.
Chapter Summary
Chapter 3, Shelf Component This chapter describes the detailed procedure for
Replacement replacing various shelf components.
Changes or modifications not expressly approved by the party responsible for compliance
could void the user's authority to operate the equipment.
I
Conventions
ZTE documents employ the following typographical conventions.
Typeface Meaning
Bold Menus, menu options, function names, input fields, radio button names, check boxes,
drop-down lists, dialog box names, window names.
CAPS Keys on the keyboard and buttons on screens and company name.
Tip: Indicates a suggestion or hint to make things easier or more productive for the
reader.
II
Declaration of RoHS
Compliance
To minimize environmental impacts and take more responsibilities to the earth we live
on, this document shall serve as a formal declaration that ZXWN MSCS manufactured
by ZTE CORPORATION is in compliance with the Directive 2002/95/EC of the European
Parliament - RoHS (Restriction of Hazardous Substances) with respect to the following
substances:
l Lead (Pb)
l Mercury (Hg)
l Cadmium (Cd)
l Hexavalent Chromium (Cr (VI))
l PolyBrominated Biphenyls (PBBs)
l PolyBrominated Diphenyl Ethers (PBDEs)
I
II
Chapter 1
Component Replacement
Overview
Table of Contents
Applied Situations ......................................................................................................1-1
Replacement Flow......................................................................................................1-1
Precautions ................................................................................................................1-4
l Hardware update
The engineer needs to update the hardware, such as to replace the chips when the
board is added with new functions. In such a case, the engineer needs to insert and
extract the board, and restore the running of board.
l Equipment Expansion
Some boards need to be replaced or inserted during the equipment expansion.
1-1
Flow Diagram
Figure 1-1 shows the basic operating flow.
à Get familiar with the function of various boards used in ZXWN MSCS.
à Understand basic operating flow of replacing boards.
1-2
prohibited to replace the board except that the risk is under control. Otherwise,
contact the local ZTE office as soon as possible for technical support.
Note:
The 14U shelf uses the GPBB0 and GPBX1, and the 13U shelf uses GPBA0GPBX0.
l Maintenance personnel must prepare some common tools, such as the multi-meter,
antistatic wrist straps, cross screwdrivers, flathead screwdrivers, sharp nose pliers,
thin nose bent pliers and so on.
1-3
component works normally. Otherwise, service personnel should contact local ZTE office
for technical support in time.
1.3 Precautions
Board replacement is a major operation for equipment maintenance. To guarantee
personal safety and equipment security, service personnel should carefully read the
precautions described in this topic.
1-4
l After taking out the board, do not touch the board with hands directly to avoid from
being scalded or injured by the parts on the board.
l If the board replacement is due to power fault, ask power service personnel to check
it. Inserting the power board directly is prohibited.
l Do not cause other damage to the equipment when replacing the board. For example,
the backplane connector is bent due to rough operation.
l Try best not to influence other boards and services working normally in the system
while replacing a board.
Precautions are as follows.
l Prohibit replacing boards with rough operations, that is, forcefully installing and
disassembling screws and boards.
l Prohibit replacing the board that possibly influences services at traffic peak. It is better
to replace the board when the traffic is the minimum, such as daybreak 2:00.
l Prohibit directly replacing the active board. Change over the active board to standby
mode first, and then replace this board.
Routine Check
During board installation, if the board cannot be pushed into the right position with its
extractors, withdraw it and check the following items:
l Check whether the board installation slot is consistent with the requirement.
l Check whether the board deviates from rails.
l Check whether backplane-connector pins are bent or damaged.
1-5
1-6
Flow
1. Put on an antistatic wrist strap.
2. If the board adopts mutual active/standby working mode, implement active/standby
changeover. Refer to 2.1.1 Performing an Active/Standby Changeover for a Board for
detailed procedure.
3. Extract the board to be replaced. Refer to 2.1.2 Extracting a Board for detailed
procedure.
4. Paste a label on malfunctioning board, and place it at the specified position.
5. Insert the new board. Refer to 2.1.3 Inserting a Board for detailed procedure.
6. When the board completes its startup process, its OK indicator flashes in green,
indicating that the board begins to work normally.
Verification
1. Perform an active/standby changeover to bring the new board into an active status.
2. Observe the system working status. If the board works normally, the replacement is
successful. Otherwise, power down the new board immediately, and bring the standby
board into active status.
3. Check all the configurations of the new board carefully. You may replace it again
by following the procedure mentioned above. If it still fails, observe and record
phenomena for further analysis.
2-1
Caution!
Active/standby board changeover is a risky maintenance operation. It is recommended to
select the time with the minimum traffic, such as 2:00 in the early morning.
Prerequisites
l The ID of the exchange to be configured is known.
l The status of the board to be replaced is queried on Rackchart Management tab
page of the OMM Daily Maintenance client.
Steps
1. In the MML Terminal window, execute the SET command, or select the required NE
in the Root tree to specify the exchange to be configured.
2. Type the SWP NORMAL command, and then IDs of the rack, shelf, and slot where
the board to be replaced is located, and CPU ID.
Note:
Board changeover is performed based on the CPU. For a board with multiple CPUs,
type the total number of its CPUs on the configuration window so as to complete board
changeover.
3. Execute the command and wait for the board changeover to complete.
– End of Steps –
Result
The active/standby board changeover is completed.
2-2
Prerequisites
l The physical position of the board to be replaced is decided.
l The potential consequences of board replacement are known.
Steps
1. Put on an antistatic wrist strap, and insert its ground terminal into the ESD jack on the
rack.
2. Loosen captive screws on the upper and lower extractors with a straight screwdriver
or cross screwdriver.
3. Press the locking buttons along the arrow direction on extractors to unlock extractors,
as shown in Figure 2-1.
4. When the “H/S” indicator on the board panel is blue, as shown in Figure 2-2 .
Rotate extractors outwards with both hands to make them completely leave the shelf
beam-slot, and then slowly pull out the board.
2-3
5. Draw out the board slowly along upper and lower rails of standard shelf until it is
completely off rails, as shown in Figure 2-3.
6. Pack the board with an antistatic bag, and then put it into a package.
– End of Steps –
Result
Board extraction conforms to the operation requirements, and the board is in good
condition.
2-4
Prerequisites
l The type and slot of the board to be inserted are correct.
l The physical data of the board are configured completely, and all the version files are
loaded normally.
Steps
1. Put on an antistatic wrist strap, and plug its ground terminal into the ESD jack on the
rack.
2. Unlock the upper and lower extractors on the board. Rotate them with both hands to
move them to a certain degree. Push slowly the board along the upper and lower rails
corresponded by board slot IDs into the standard shelf, as shown in Figure 2-4.
3. Push the board along the rails gently till the extractor bayonets enter the square troughs
beside upper and lower holders of the shelf.
4. After board connector contacts backplane connector, rotate extractors inward to move
the board forward to its right position. The KATA sound from extractors indicates that
they are locked in the right position and hung by pothooks.
5. Tighten captive screws on upper and lower extractors with a straight screwdriver or
cross screwdriver. The installation is completed, as shown in Figure 2-5.
2-5
– End of Steps –
Result
Board installation conforms to the operation requirements, and the board is in good
condition.
2-6
2-7
Prerequisites
l Select the minimum traffic time, such as 2:00 in the early morning.
l Prepare the spare GPBA0 board for the replacement. Pay attention that the type of
the spare must be consistent with that of the faulty.
l Prepare the tools required for the replacement, such as a screwdriver, serial port
cable, a notebook computer, and labels.
l Apply for the approval to the chief, and contact local ZTE office. Prevent any
emergency in advance.
Steps
1. Determine the slot where the GPBA0 to be replaced is located through the Rack Chart
Management tab page of the OMM Daily Maintenance client and Fault Management
window of the OMM Main Process client.
2. Find out the GPBA0 board to be replaced on the foreground rack, and mark it with a
label.
Note:
Do not directly replace the active board configured with the active/standby mode.
3. Right click the GPBA0 board to be replaced ,click Show CPU of the shortcut menu
and view the status of the GPBA0 board on the Rack Chart Management tab page
of the OMM Daily Maintenance client.
2-8
Note:
If the GPBA0 works in active status, switch it to the standby mode.
If the board to be replaced works in the standby mode, go the next step directly.
Note:
For detailed operation steps, refer to 2.1.2 Extracting a Board.
5. After the faulty board is unplugged, insert the spare board into the shelf.
Note:
For detailed operation steps, refer to 2.1.3 Inserting a Board.
6. Observe the “OK” indicator on the plugged GPBA0 board. It takes longer time to start
the GPBA0 board for the first time.
Note:
The GPBA0 board automatically downloads the version file from the active GPBA0
after startup. The “HD1/2” hard disk indicator constantly flashes, meanwhile, the “OK”
indicator flashes quickly. After the version file is loaded, the “OK” indicator begins to
flash slowly.
7. On the OMM Daily Maintenance client, execute the Data Transfer command in the
Data Maintenance > Data Transfer menu to transfer all tables to the No. 1 OMP
module on the foreground.
8. After the replaced faulty GPBA0 board is packed with a label, send it back to ZTE for
repair.
– End of Steps –
Follow-Up Action
To verify GPBA0 board, perform the following steps.
2-9
1. Switch the new GPBA0 board to active mode, the ACT indicator on the GPBA0 board
is constantly on.
2. On the OMM Main Process client, enter the MML Terminal window. In the MML
Commands tree of corresponding exchange, double-click Maintenance Management
> Dynamic Management > Adjacent Office > Show Adjacent Office Status (SHOW
OFCSTAT). Click Execute.
Note:
The status of each adjacent office can be returned normally.
3. Open the local maintenance tool, the link to the NE is shown as green in the “pinion”,
indicating that the link is normal.
4. Enter the Fail Observer window of the OMM Trace Tools client, the tasks of observing
failures are executed successfully.
5. Open the MML Terminal > Maintenance Management > Diagnostic Test > Board
Diagnostic Test tab page of the OMM Main Process client. Execute a board testing
task to check whether the test is successful.
6. Enter the Signaling Trace window of the OMM Trace Tools client to trace the signaling
configured in the system.
Note:
l Serious alarm appears in the fault management system. One or more signaling links
are interrupted, and adjacent office is unreachable.
l Partial or all system services are interrupted.
l The “OK” indicator on the SLB board flashes in red.
2-10
l Find out that signaling links are unavailable, and adjacent office is unreachable by
performing query on the Dynamic Management tab page of the OMM Main Process
client.
l Inter-office call is disrupted.
Prerequisites
l Select the minimum traffic time, such as 2:00 in the early morning.
l Prepare the spare board for the replacement. Pay attention that the type of the spare
SLB must be consistent with that of the faulty.
l Prepare the tools required for the replacement, such as a screwdriver, serial port cable
and labels.
l Apply for the approval to the chief, and contact local ZTE office for technical support
when any emergency occurs.
Steps
1. Determine the exact slot where the SLB to be replaced is located through the Rack
Chart Management tab page of the OMM Daily Maintenance client and Fault
Management window of the OMM Main Process client.
2. Find out the SLB board to be replaced on the foreground rack, and mark it with a label.
3. Check the configured data in the MML Terminal window of the OMM Main Process
client to determine the signaling link on this SLB board.
4. Enter the MML TerminalDynamic Management tab page of the OMM Main Process
client to check the status of the signaling links on this SLB, and the status of offices
homed by these signaling links.
5. If the office directions are reachable, and at least one signaling link homed to other
SLB is normal, go to the next step. If only the signaling links homed to this SLB are
normal, and the office direction is reachable, check the corresponding configuration,
and handle faults to ensure at least one signaling link homed to other SLB to this office
direction is normal.
Note:
7. After the faulty board was unplugged, insert the spare board into the shelf.
2-11
Note:
For detailed operation steps, refer to 2.1.3 Inserting a Board.
8. Observe the “OK” indicator on the new SLB board. The “OK” indicator flashes slowly
in a normal way.
9. After the replaced faulty SLB board is packed with a label, send it back to ZTE for
repair.
– End of Steps –
Follow-Up Action
To verify SLB board, perform the following steps.
1. On the OMM Main Process client, enter the MML Terminal window. In the MML
Commands tree of corresponding exchange, double-click Maintenance Management
> Dynamic Management > NO.7 Relative > Signaling Link > Show SMP Signaling
Link Status (SHOW SMPLNKSTAT). Click Execute.
Note:
The signaling links on this SLB should be in normal working status.
2. Perform a dial-up test. Ensure that the calls to each office are normal.
Prerequisites
l Select the minimum traffic time, such as 2:00 in the early morning.
l Prepare the spare SWBB0 board for the replacement. Pay attention that the type of
the spare must be consistent with that of the faulty.
2-12
l Prepare the tools required for the replacement, such as a screwdriver, serial port
cable, and labels.
l Apply for the approval to the chief, and contact local ZTE office for technical support
when any emergency occurs.
Steps
1. Determine the exact position of the SWBB0 to be replaced through the Rack Chart
Management tab page of the OMM Daily Maintenance client and Fault Management
window of the OMM Main Process client.
2. Find out the SWBB0 board to be replaced on the foreground rack, and mark it with a
label.
Note:
Do not directly replace the active board configured with the active/standby mode.
3. Right click the SWBB0 board to be replaced ,click Show CPU of the shortcut menu
and view the status of the SWBB0 board on the Rack Chart Management tab page
of the OMM Daily Maintenance client.
Note:
If the SWBB0 works in active status, switch it to the standby mode.
If the SWBB0 board to be replaced is in the standby mode, go the next step directly.
4. Unplug the board from the shelf.
Note:
For detailed operation steps, refer to 2.1.2 Extracting a Board.
5. After the faulty board is unplugged, insert the spare board into the shelf.
Note:
For detailed operation steps, refer to 2.1.3 Inserting a Board.
2-13
Note:
If the “OK” indicator normally flashes slowly, the SWBB0 board has already run
normally.
7. Check the status of each board inside the shelf on the foreground rack, which should
be normal.
8. After the replaced faulty SWBB0 board is packed with a label, send it back to ZTE for
repair.
– End of Steps –
Result
To verify SWBB0 board, perform the following steps.
1. The SWBB0 board indicator is normal.
2. In Fault management window of the OMM Main Process client, alarms of
communication faults between boards are eliminated.
Prerequisites
l Select the minimum traffic time, such as 2:00 in the early morning.
l A spare GPBX0 board for replacement is ready.
l The tools required for replacement are ready, such as a screwdriver, labels, display,
mouse, and keyboard.
l Apply to the chief for approval, contact local ZTE Corporation, and prepare for any
potential emergency.
2-14
Before the GPBX0 board is put in use, the hard disk RAID is set, Klinux operating system,
Oracle 10g database, OMM server and tool server are installed.
Before leaving the factory, the operating system and the database of the GPBX0 board are
installed. For the details, refer to ZXWN MSCS MSC Server Software Installation Guide.
Note:
l The operating system, database and OMM versions of the GPBX0 board server are
consistent with those the server in the existing network.
l The installation directories of the database and the OMM software are consistent with
those of the server in the existing network as far as possible.
Steps
1. Find the GPBX0 board on the foreground rack, and mark it with a label.
Caution!
Hot extracting/inserting is prohibited.
2. When the system is running, use one of the following methods to turn off the system.
Watch the panel to make sure that the operating system has turned off (The PWR
indicator turns off). After that, loose the latch.
l Log in to the operating system as a root user . Execute the init 0 command to
turn off the system.
l Touch the PWB key with a non-inductive screwdriver, the power is off
automatically.
3. Unplug the board from the shelf.
Note:
For detailed operation steps, refer to 2.1.2 Extracting a Board.
4. After the faulty board was unplugged, insert the spare board into the shelf.
Note:
For detailed operation steps, refer to 2.1.3 Inserting a Board.
2-15
5. Observe the “OK” indicator on the new GPBX0 board. The “OK” indicator flashes
slowly, indicating that the new board works properly.
6. After the replaced faulty GPBX0 board is packed with a label, send it back to ZTE for
repair.
– End of Steps –
Follow-Up Action
It is required to verify the board status after the GPBX0 is replaced.
1. Export the data from the existing network, and then import them to the server database
of the GPBX0 board.
2. On the OMM Main Process client, enter the MML Terminal window. In the MML
Commands tree of corresponding exchange, double-click Maintenance Management
> Dynamic Management > Adjacent Office > Show Adjacent Office Status (SHOW
OFCSTAT). Click Execute.
Note:
The status of each adjacent office can be returned normally.
3. Open the MML Terminal > Maintenance Management > Diagnostic Test > Board
Diagnostic Test tab page of the OMM Main Process client. Execute a board testing
task to check whether the test is successful.
4. Open the Signaling Trace window of the OMM Trace Tools client . Trace the signaling
already configured in the system. The system should display the traced real-time
signaling.
2-16
Prerequisites
l Prepare the NCMM to be replaced, and pay attention that its model should be
consistent with that of the using NCMM.
l Prepare the tools required for the replacement, including a screwdriver, labels, and
an antistatic wrist strap.
l Get approval for the replacement from your leaders, and contact ZTE local office for
technical support in case of emergency.
Steps
1. Confirm the installation location information such as the cabinet and the shelf where
the NCMM locates.
2. Stick the replacement label on the panel of the NCMM to be replaced so as to avoid
misoperation.
3. Confirm that another NCMM is properly running.
4. Wear the antistatic strap, and insert its grounding end into the ESD jack on the rack.
3-1
6. Hold the ejector lever of the NCMM, turn the ejector lever outwards to open it. The
indicator “H/S” flashes quickly, and the board applies for deactivation. After the
successful deactivation, the board prepares to power off; after the indicator “H/S” is
constantly on, the board is powered off.
7. Use the cross screwdrivers to loosen the captive screws at both ends of the NCMM in
the anticlockwise direction.
8. Use the left hand to hold the left side of the NCMM panel, and use the right hand to
turn the ejector lever of the NCMM outwards to make the angle between it and the
panel become 45 degree, so the NCMM connector separates from the backplane.
9. Hold the panel and ejector lever of the NCMM and pull the NCMM out along the rail.
10. Put the extracted NCMM into the antistatic packing bag.
11. According to the ESD protection regulations, take out the new NCMM from the
antistatic packing bag.
12. Use the left hand to hold the NCMM panel, and use the right hand to hold the ejector
lever on the NCMM, and turn the ejector lever outwards to open it completely.
13. Along the rail of the NCMM, slide and insert the NCMM smoothly.
14. Use the left hand to press the NCMM panel and push it hard inwards, and use the right
hand to turn the ejector lever to the direction of the panel, so as to push the NCMM
into the shelf, till the ejector lever of the NCMM contacts the panel.
15. Make sure that the ejector lever is buckled to the shelf, and use the screwdriver to
tighten the captive screws on the panel in the clockwise direction to fasten the NCMM.
16. Reconnect the cables to the panel.
– End of Steps –
Result
l After the NCMM is replaced, it can be properly started and logged in for configuration.
l The indicator “H/S” on the NCMM panel is off.
l The indicator “HOST” on the NCMM panel flashes in green, and the replaced NCMM
works properly.
Prerequisites
l Prepare the NCDM to be replaced, and pay attention that its model should be
consistent with that of the using NCDM.
3-2
l Prepare the tools required for the replacement, including a screwdriver, labels, and
an antistatic wrist strap.
l Get approval for the replacement from your leaders, and contact ZTE local office for
technical support in case of emergency.
Steps
1. Confirm the installation location information such as the cabinet and the shelf where
the NCDM locates.
2. Stick the replacement label on the panel of the NCDM to be replaced so as to avoid
misoperation.
3. Wear the antistatic wrist strap, and insert its grounding end into the ESD jack on the
rack.
4. Disconnect all cables connected to the NCDM panel.
5. Use the cross screwdriver to loosen the captive screws of the NCDM module in
anticlockwise direction.
6. Hold the panel of the NCDM module, and pull the NCDM module out steadily.
7. Put the extracted NCDM into the antistatic packing bag.
8. According to the ESD protection regulations, take the new NCDM from the antistatic
packing bag.
9. Along the rail of the NCDM, slide and insert the NCDM steadily.
10. Push the NCDM hard inwards, till the panel of the NCDM module contacts the shelf
closely.
11. Use the screwdriver to tighten the captive screws on the panel in clockwise direction
to fasten the NCDM.
12. Reconnect the cables to the panel.
– End of Steps –
Result
The indicator “OK” on the NCDM panel is on in green, and this indicates that the new
NCDM runs properly.
3-3
Prerequisites
l Prepare the standby NPEM.
l Prepare the tools required for the replacement, including a screwdriver and labels.
l Get approval for the replacement from your leaders, and contact ZTE local office for
technical support in case of emergency.
Steps
1. Confirm the installation location information such as the cabinet and the shelf where
the NPEM to be replaced locates.
2. Stick the replacement label on the panel of the NPEM to be replaced so as to avoid
misoperation.
3. Press the hot-swap button of the NPEM, the hot-swap indicator flashes, and the NPEM
applies for the deactivation. After the successful deactivation, the hot-swap indicator
is constantly on, and the NPEM is powered off.
4. Turn the power switch of the NPEM to the position “OFF”.
5. Turn off the power switch of the PDU connected to the NPEM to be replaced.
6. Remove the two combination screws on the NPEM protection cover, and remove the
protection cover.
7. Remove the screws of the connecting terminals “-48VA”, “-48VRTNA”, “-48VB”,
and “-48VRTNB” of the NPEM, and remove the power cables from the connecting
terminals.
8. Loosen the two captive screws at both ends of the NPEM.
9. Hold the handle of the NPEM with both hands, and pull the NPEM out horizontally and
slowly.
10. Insert the standby NPEM into the slot horizontally, till the power connectors on the
NPEM are inserted into the power socket on the backplane.
11. Tighten the two captive screws at both ends of the NPEM.
12. Connect the two groups of power cables to the corresponding connecting terminals of
the NPEM respectively, and tighten the fastening screws.
13. Use the combination screws to install the protection cover of the NPEM again.
14. After the installation, turn on the switches of the PDU and the NPEM orderly. The
hot-swap indicator flashes, and the NPEM applies for the activation. After the
successful activation, the NPEM is powered on, and the hot-swap indicator is off.
– End of Steps –
Result
The indicator “OK” on the NPEM panel flashes in green, and the replaced NPEM functions
properly.
3-4
Prerequisites
l Prepare the NFCM to be replaced, and pay attention that its model should be
consistent with that of the using NFCM.
l Prepare the tools required for the replacement, including a screwdriver, labels, and
an antistatic wrist strap.
l Get approval for the replacement from your leaders, and contact ZTE local office for
technical support in case of emergency.
Steps
1. Confirm the installation location information such as the cabinet and the shelf where
the NFCM locates.
2. Stick the replacement label on the panel of the NFCM to be replaced so as to avoid
misoperation.
3. Wear the antistatic wrist strap, and insert its grounding end into the ESD jack on the
rack.
4. Use the cross screwdriver to loosen the captive screws of the NFCM module in
anticlockwise direction.
5. Press the hot-swap button until the “H/S” indicator is always on in blue.
6. Hold the panel of the NFCM module, and pull the NFCM module out steadily.
7. Put the extracted NFCM into the antistatic packing bag.
8. According to the ESD protection regulations, take the new NFCM from the antistatic
packing bag.
9. Along the rail of the NFCM, slide and insert the NFCM steadily.
10. Push the NFCM hard inwards, till the panel of the NFCM module contacts the shelf
closely.
11. Use the screwdriver to tighten the captive screws on the panel in clockwise direction
to fasten the NFCM.
– End of Steps –
Result
The indicator “RUN” on the NFCM panel is on in green, and this indicates that the new
NFCM runs properly.
3-5
Prerequisites
l Prepare a spare dustproof screen of the cabinet.
l Prepare the screwdriver required for the replacement.
Steps
1. Unlock cabinet door lock and open the cabinet door.
2. According to the direction of the arrow as shown in Figure 3-1. press the movable
ejector lever on the plastic dustproof screen, till the bulge part on the movable ejector
lever separates from the bayonet on the cabinet door, and draw out the plastic
dustproof screen.
3. Place the spare dustproof screen to the corresponding position of the cabinet door,
and press the movable ejector lever of the plastic dustproof screen according to the
arrow direction as shown in Figure 3-1, and push the bulge part on the movable ejector
lever into the bayonet of the cabinet door.
3-6
3-7
3-8
I
Figures
III
Tables
OMP
- Operation & maintenance Main Processer
RMP
- Resource Main Processor
SAS
- Serial Attachment SCSI
SIPI
- Signaling IP bearer Interface
SMP
- Signal Main Processor