DETAILS OF MEASUREMENT AND CALCULATION OF QUANTITIES

BOUNDARY WALLS
ITEM NO Description of work NO. L(m) B(m) H(m)
1 Earthwork in excavation 61.94 1 1.1
2 P.C.C in foundation 61.94 1 0.1
3 Brick work foundation
First step 61.94 0.69 0.3
Second step 61.94 0.46 0.3
Third step upto plinth level 61.94 0.23 0.9
4 Wall between DPC and FFL 61.94 0.23 0.04
5 DPC 61.94 0.23
Deduction
Main Gate 2.7 0.23
Total
6 Brick work in superstructure 61.94 0.23 3.1
Deduction
Main Gate 2.7 0.23 3.1
Total
Bath,Store,Kitchen,Room1
=(1.5x2.1x2.4x3.6+4x0.230)x2+3x3+3x0.230+4.8+4.8+2x0.230=40.79m
ITEM NO Description of work NO. L(m) B(m) H(m)
1 Earthwork in excavation 37.79 1 1.1
2 P.C.C in foundation 37.9 1 0.1
3 Brick work foundation
First step 38.72 0.69 0.3
Second step 39.41 0.46 0.3
Third step upto plinth level 40.1 0.23 0.9
4 Wall between DPC and FFL 40.1 0.23 0.04
5 DPC 40.1 0.23
Deduction
Door openings
D1 2 0.9 0.23 2.1
D2 1 0.75 0.23 2.1
D3 1 1.2 0.23 2.1

Total
6 Brick work in superstructure 40.1 0.23 3.1
Deduction
Door
D1 2 0.9 0.23 2.1
D2 1 0.75 0.23 2.1
D3 1 1.2 0.23 2.1

Windows &Ventilators
0.6 0.23 1.9
0.9 0.23 1.4
1.05 0.23 1.4
2.75 0.23 1.4

Total
Room2,Room3,Room4,Washing Area,Bath
Total length of centre line =3.6+3.6+10x0.230+0.230/2+3.45+1.5+1.5+2.78+3.6+5.7+3.6+3.6+2.1+2.1=35.945m

ITEM NO Description of work NO. L(m) B(m) H(m)


1 Earthwork in excavation 31.02 1 1.1
2 P.C.C in foundation 31.02 1 0.1
3 Brick work foundation
First step 32.725 0.69 0.3
Second step 33.99 0.46 0.3
Third step upto plinth level 34.805 0.23 0.9
4 Wall between DPC and FFL 34.805 0.23 0.04
5 DPC 34.805 0.23
Deduction
Door openings
D1 5 0.9 0.23
D2 2 0.75 0.23

Total
6 Brick work in superstructure 34.805 0.23 3.1
Deduction
Door
D1 0.9 0.23 2.1
D2 0.75 0.23 2.1

Windows &Ventilators
1.5 0.23 1.4
0.9 0.23 1.4
0.975 0.23 1.4
1.2 0.23 1.4
0.9 0.23 1.4
0.675 0.23 1.4

Total

BOUNDARY WALLS
ITEM NO Description of work NO. L(m) B(m) H(m)
Plastering
Outer 62.86 3.1
Deduction
Main Gate 2.1 3.1
Wall Junction 3 0.23 3.1
Total
Internal 61.02 3.1
Deduction
Main Gate 2.1 3.1
Wall Junction 3 0.23 3.1
Total
White Washing same as plastering
Plastering same as plastering
All Rooms Bathroom WC etc
ITEM NO Description of work NO. L(m) B(m) H(m)
1 Plastering
Inner 104.56 3.1
Deduction
Doors
D1 0.9 2.1
D2 0.75 2.1
D3 1.2 2.1
Windows
1.5 1.4
0.975 1.4
0.9 1.4
1.2 1.4
0.9 1.4
0.675 1.4
0.675 1.4
1.725 1.4
2.75 1.4
1.05 1.4
0.6 1.4
Ventilators
0.6 0.5
0.9 0.5
Total
Outer 56.54 3.1
Deduction
Doors
D1 0.9 2.1
D2 0.75 2.1
D3 1.2 2.1
Windows
1.5 1.4
0.975 1.4
0.9 1.4
1.2 1.4
0.9 1.4
1.725 1.4
2.75 1.4
1.05 1.4
0.6 1.4
Ventilators
0.6 0.5
0.9 0.5
Total
2 White Washing same as plastering
3 Painting same as plastering
4 Flooring
Room1 3.6 4.8
Room2 4.5 3.6
Room3 2.78 3.6
Room4 3.6 3.6
Bath cum WC 1.5 3
Store 2.1 3
Kitchen 2.4 3
Washing Area 1.27 2.1
Bath cum WC 1.5 2.1
Space 1 5.33 2.7
Space 2 3.67 1.25
Space 3 1.725 4.8
Space4 13.96 2.4
Space5 8.18 1.575
Space6 3 7.95
Space7 3.45 5.7
5 Sand Filling Flooring Areax0.1
6 PCC Flooring Areax0.075
7 Columns 24 0.225 0.225 3.1
2 0.325 0.325 3.1

Steel=4% of volume of column 1/100x4.42x7850=1387.88kg


8 Slab
Chajja Projection 23.78 0.45 0.1
Room1 3.945 5.145 0.1
Room2 4.845 3.83 0.1
Room3 3.01 3.945 0.1
Room4 3.945 3.945 0.1
Washing Area 1.845 2.445 0.1
Bath 1.845 2.33 0.1
Kitchen 2.63 3.345 0.1
Store 2.33 3.345 0.1
Bath cum W/C 1.845 3.345 0.1
Open Space 1 3.785 1.595 0.1
Open Space 2 3 7.95 0.1
Open Space 3 3.68 6.045 0.1
Open Space 4 4.405 1.43 0.1

Steel=1%of volume of slab 1/100x17.01x7850=1335.29kg


Ceiling
9 Earth Work Filling Filling from bottom of foundation to DPC+(Earthwork in Excavation -Brick i
Total Centre Line=136.84
Brick Work In superstructure upto GL
First Step
Second Step
Third Step Upto GL 136.84 0.23 0.4
PCC in foundation
Earth work in excavation
Filling from GL to DPC 62.8 55.25 0.5
Earth Work Filling
OF QUANTITIES

QUANTITY REMARKS
68.134 L=2x(15.3+16.3)-4(0.230)
6.194

12.82158
8.54772
12.82158
0.569848
14.2462

0.621
13.62
44.16322

1.9251
42.23

QUANTITY REMARKS
41.569 L=40.79-6(1/2)
3.79 L=40.79-6(1/2)

8.01504 L=40.79-6(0.690/2)
5.43858 L=40.79-6(0.460/2)
8.3007 L=40.79-6(0.230/2)
0.36892
9.223

0.4347
0.36225
0.5796
1.37655
8.57
28.5913

0.4347
0.36225
0.5796
1.37655
0.2622
0.2898
0.3381
0.8855
1.7756
25.45

3.6+2.1+2.1=35.945m

QUANTITY REMARKS
34.122 L=35.945-6(1/2)-5((1-0.23)/2)
3.102

6.774075 L=35.945-6(0.690/2)-5((0.690-0.23)/2)
4.69062 L=35.945-6(0.460/2)-5((0.460-0.23)/2)
7.204635 L=35.945-6(0.230/2)
0.320206
8.00515

1.035
0.345
1.38
6.62
24.815965

0.4347
0.36225
0.79695

0.483
0.2898
0.31395
0.3864
0.2898
0.21735
1.9803
22.13

UNDARY WALLS
QUANTITY REMARKS

194.866
6.51
2.139
186.22
189.162

6.51
2.139
180.51
369.67
369.67

QUANTITY REMARKS

324.136

1.89
1.575
2.52

2.1
1.365
1.26
1.68
1.26
0.945
0.945
2.415
3.85
1.47
0.84

0.3
0.45
280.99
175.274

1.89
1.575
2.52

2.1
1.365
1.26
1.68
1.26
2.415
3.85
1.47
0.84

0.3
0.45
142.875
423.865
423.865

17.28
16.2
10.01
12.96
4.5
6.3
7.2
2.667
3.15
14.391
4.58
8.28
3.35
12.88
23.85
19.665
16.726
12.54
3.7665
0.654875
4.421375
7850=1387.88kg

1.1
2.1
1.86
1.19
1.6
0.46
0.44
0.91
0.79
0.62
0.61
2.4
2.3
0.63
17.01
x7850=1335.29kg
170.1
DPC+(Earthwork in Excavation -Brick in Superstructure upto GL -PCC in Foundation) +filling from GL to DPC

27.6
18.68
12.59
13.086
143.825
1734.85
1806.88