Professional Documents
Culture Documents
Advanced Surveying (CEE211) : Assignment # 2
Advanced Surveying (CEE211) : Assignment # 2
Advanced Surveying (CEE211) : Assignment # 2
Assignment # 2
Q # 2: Traversing was done by using theodolite, the measured lengths and bearings of the sides of a
closed traverse ABCDE are tabulated below. Review the data and determine the omitted
measurements.