User1 :  Rahmat ullah |  Role : Contractor QC   | Change Password | Change Role | Logout  

Contractor Data Entry For Project {10-01810-0002} Initiated By (Rahmat ullah)

Project No: 10-01810-0002 Plant ID.: EW Eng. System ID::

Contractor RFI Reference: MGS-P1-ARK-WLD-4035B   Sub System ID.:

Mechanical-
Discipline: Eng. Index: W
Piping/Welding
SATIP Ref #: SATIP-W-012-01 Project Phase: INSTALLATION
SATIP Title: Welding of Pipelines
SAIC Ref #: SAIC-W-2048      
SAIC Title: Pre-Welding and Weld Joint Fit-up Inspection

Contractor Insp. Level: H Scheduled Insp. Date: 02/01/2018

Aramco Insp. Level: W/H Scheduled Insp. Time: 08:30 AM

Equipment ID/Description.: Pre-Welding and Weld Joint Fit-up Inspection (CRC)

Layout Drawing No.: XA-139712-119 Layout Drawing Rev. No: 00 Purchase Order No. N/A

Aramco Activity No.: 3.7        

Location
MGS PHASE II PACKAGE 1 AREA (B) KM. 197+500
Description:
RFI Description: Pre-Welding and Weld Joint Fit-up Inspection (CRC)

Exceptions:

RFI User Information


User ID Name User Type
AHMASX0J AHMASX0J Saudi Aramco PMT Engineer
KHANRS0E Rahmat ullah Contractor QC
TAUSMX0A Tausif, Muhammad Saudi Aramco Inspector

Contractor Replies
Date Replied By Reply
No Replies

  

PMT Replies
Date Replied By Reply
No Replies

   
User1 :  Rahmat ullah |  Role : Contractor QC   | Change Password | Change Role | Logout  

Contractor Data Entry For Project {10-01810-0002} Initiated By (Rahmat ullah)

Project No: 10-01810-0002 Plant ID.: EW Eng. System ID::

Contractor RFI Reference: MGS-P1-ARK-WLD-4036B   Sub System ID.:

Mechanical-
Discipline: Eng. Index: W
Piping/Welding
SATIP Ref #: SATIP-W-012-01 Project Phase: INSTALLATION
SATIP Title: Welding of Pipelines
SAIC Ref #: SAIC-W-2048      
SAIC Title: In-Process Weld Inspection

Contractor Insp. Level: W Scheduled Insp. Date: 02/01/2018

Aramco Insp. Level: S/W Scheduled Insp. Time: 09:30 AM

Equipment ID/Description.: In-Process Weld Inspection (CRC)

Layout Drawing No.: XA-139712-119 Layout Drawing Rev. No: 00 Purchase Order No. N/A

Aramco Activity No.: 3.8        

Location
MGS PHASE II PACKAGE 1 AREA (B) KM. 197+500
Description:
RFI Description: In-Process Weld Inspection (CRC)

Exceptions:

RFI User Information


User ID Name User Type
AHMASX0J AHMASX0J Saudi Aramco PMT Engineer
KHANRS0E Rahmat ullah Contractor QC
TAUSMX0A Tausif, Muhammad Saudi Aramco Inspector

Contractor Replies
Date Replied By Reply
No Replies

  

PMT Replies
Date Replied By Reply
No Replies

   
User1 :  Rahmat ullah |  Role : Contractor QC   | Change Password | Change Role | Logout  

Contractor Data Entry For Project {10-01810-0002} Initiated By (Rahmat ullah)

Project No: 10-01810-0002 Plant ID.: EW Eng. System ID::

Contractor RFI Reference: MGS-P1-ARK-WLD-4037B   Sub System ID.:

Mechanical-
Discipline: Eng. Index: W
Piping/Welding
SATIP Ref #: SATIP-W-012-01 Project Phase: INSTALLATION
SATIP Title: Welding of Pipelines
SAIC Ref #: SAIC-W-2048      
SAIC Title: Post-Welding Visual Inspection

Contractor Insp. Level: H Scheduled Insp. Date: 02/01/2018

Aramco Insp. Level: W Scheduled Insp. Time: 11:30 AM

Equipment ID/Description.: Post-Welding Visual Inspection

Layout Drawing No.: XA-139712-119 Layout Drawing Rev. No: 00 Purchase Order No. N/A

Aramco Activity No.: 3.9        

Location
MGS PHASE II PACKAGE 1 AREA (B) KM. 197+500
Description:
RFI Description: Post-Welding Visual Inspection(CRC)

Exceptions:

RFI User Information


User ID Name User Type
AHMASX0J AHMASX0J Saudi Aramco PMT Engineer
KHANRS0E Rahmat ullah Contractor QC
TAUSMX0A Tausif, Muhammad Saudi Aramco Inspector

Contractor Replies
Date Replied By Reply
No Replies

  

PMT Replies
Date Replied By Reply
No Replies

   
User1 :  Rahmat ullah |  Role : Contractor QC   | Change Password | Change Role | Logout  

Contractor Data Entry For Project {10-01810-0002} Initiated By (Rahmat ullah)

Project No: 10-01810-0002 Plant ID.: EW Eng. System ID::

Contractor RFI Reference: MGS-P1-ARK-WLD-4038B   Sub System ID.:

Mechanical-
Discipline: Eng. Index: W
Piping/Welding
SATIP Ref #: SATIP-W-012-01 Project Phase: INSTALLATION
SATIP Title: Welding of Pipelines
SAIC Ref #: SAIC-W-2048      
SAIC Title: Pre-Welding and Weld Joint Fit-up Inspection

Contractor Insp. Level: H Scheduled Insp. Date: 02/01/2018

Aramco Insp. Level: W/H Scheduled Insp. Time: 08:00 AM

Equipment ID/Description.: Pre-Welding and Weld Joint Fit-up Inspection (Serimax)

Layout Drawing No.: XA-139712-116 Layout Drawing Rev. No: 00 Purchase Order No. N/A

Aramco Activity No.: 3.7        

Location
MGS PHASE II PACKAGE 1 AREA (B) KM. 19208+700
Description:
RFI Description: Pre-Welding and Weld Joint Fit-up Inspection (Serimax)

Exceptions:

RFI User Information


User ID Name User Type
AHMASX0J AHMASX0J Saudi Aramco PMT Engineer
KHANRS0E Rahmat ullah Contractor QC
TAUSMX0A Tausif, Muhammad Saudi Aramco Inspector

Contractor Replies
Date Replied By Reply
1/31/2018 3:02:25 PM  Rahmat ullah CORRECTION: KM. 208+700 

  

PMT Replies
Date Replied By Reply
No Replies

   
User1 :  Rahmat ullah |  Role : Contractor QC   | Change Password | Change Role | Logout  

Contractor Data Entry For Project {10-01810-0002} Initiated By (Rahmat ullah)

Project No: 10-01810-0002 Plant ID.: EW Eng. System ID::

Contractor RFI Reference: MGS-P1-ARK-WLD-4039B   Sub System ID.:

Mechanical-
Discipline: Eng. Index: W
Piping/Welding
SATIP Ref #: SATIP-W-012-01 Project Phase: INSTALLATION
SATIP Title: Welding of Pipelines
SAIC Ref #: SAIC-W-2048      
SAIC Title: In-Process Weld Inspection

Contractor Insp. Level: W Scheduled Insp. Date: 02/01/2018

Aramco Insp. Level: S/W Scheduled Insp. Time: 09:00 AM

Equipment ID/Description.: In-Process Weld Inspection (Serimax)

Layout Drawing No.: XA-139712-116 Layout Drawing Rev. No: 00 Purchase Order No. N/A

Aramco Activity No.: 3.8        

Location
MGS PHASE II PACKAGE 1 AREA (B) KM. 19208+700
Description:
RFI Description: In-Process Weld Inspection (Serimax)

Exceptions:

RFI User Information


User ID Name User Type
AHMASX0J AHMASX0J Saudi Aramco PMT Engineer
KHANRS0E Rahmat ullah Contractor QC
TAUSMX0A Tausif, Muhammad Saudi Aramco Inspector

Contractor Replies
Date Replied By Reply
1/31/2018 3:02:03 PM  Rahmat ullah CORRECTION: KM. 208+700 

  

PMT Replies
Date Replied By Reply
No Replies

   
User1 :  Rahmat ullah |  Role : Contractor QC   | Change Password | Change Role | Logout  

Contractor Data Entry For Project {10-01810-0002} Initiated By (Rahmat ullah)

Project No: 10-01810-0002 Plant ID.: EW Eng. System ID::

Contractor RFI Reference: MGS-P1-ARK-WLD-4040B   Sub System ID.:

Mechanical-
Discipline: Eng. Index: W
Piping/Welding
SATIP Ref #: SATIP-W-012-01 Project Phase: INSTALLATION
SATIP Title: Welding of Pipelines
SAIC Ref #: SAIC-W-2048      
SAIC Title: Post-Welding Visual Inspection

Contractor Insp. Level: H Scheduled Insp. Date: 02/01/2018

Aramco Insp. Level: W Scheduled Insp. Time: 11:00 AM

Equipment ID/Description.: Post-Welding Visual Inspection(Serimax)

Layout Drawing No.: XA-139712-116 Layout Drawing Rev. No: 00 Purchase Order No. N/A

Aramco Activity No.: 3.9        

Location
MGS PHASE II PACKAGE 1 AREA (B) KM. 208+700
Description:
RFI Description: Post-Welding Visual Inspection (Serimax)

Exceptions:

RFI User Information


User ID Name User Type
AHMASX0J AHMASX0J Saudi Aramco PMT Engineer
KHANRS0E Rahmat ullah Contractor QC
TAUSMX0A Tausif, Muhammad Saudi Aramco Inspector

Contractor Replies
Date Replied By Reply
No Replies

  

PMT Replies
Date Replied By Reply
No Replies

   