COVER SHEET SITE ACCEPTANCE TEST
‘System Type
ent
Project
[Contractor
(Contract No.
|Contact Person at Site
Site
Site Office Address
Phone at Site
Fax at Site
| Supplier
Phone / Fax
——
[GUTOR Order No. __: 1110099001 Client Tag No. : 01-UPS-7101B
: PT. PERTA- SAMTAN GAS.
: SOUTH SUMATERA NGL PROJECT
: Mr. ADITYA WAHYU PRADANA,
: GUTOR Electronic Ltd.
1s includes E720,096—;
IGB: Cover sheet (this page) gw ‘9GB: Battery: Commiss. Charge sheet (.2 pages) [Z
12GB: General & Punch List sheet TOGB: Battery: Discharge test sheet(7 pages) Ed)
}3GB: Installation Check sheet NGB: Battery: Specific Gravity sheet ( pages)
}4GB: Charger test sheet (| pages ) 12GB: Battery Temperature (1 pages ) gy
'SGR: Battery test sheet ( 1 pages) 13GB: Options Test Sheet (1 pages) y
16GB: Inverter test sheet uy 14GB: UPS Alarm Test Sheet
[7GB: Bypass test sheet a fe, 13Gm Carp Alam ets pegs)
/8GB: Bypass Stabilizer test sheet 2a 16GB: UPS Function Test Sheet,
11GB: Charger Function Test Sheet a
PEW 1060-220/220-EAN-R,
PT. TRIPATRA
Hardstrasse 74
CH-5430 Wettingen / Switzerland
+441 56 437 3434 / +441 56 4373421
(Performed by:
Print: Pi A
Sign:
Date: December 19, 2011
FOSRV-O8 REV.0DGENERAL & PUNCH LIST
TRUeIGBT
[GUTOR Order No. :1110099001 Client Tag No. : O1-UPS-71018
28
Installation Check
Charger Test
DC Stabilizer Test
Inverter Test
Bypass Test
‘Bypass Stabilizer Test
Battery: Commissioning Charge
Battery: Discharge Test
Battery: Specific Gravity Test
Charger Options
Alarm Test
Functional Test
00,
joooo0o0ooooo!
ooosooo0ooo0oo
‘System commissioned according to checklist
‘System in Operation Without load []
Operation Instruction supplied to Contractor
‘Name
‘System handed over to Contractor / End User
System handed over without defects
‘The following outstanding items have to be corrected:
ae is,20nINSTALLATION CHECKS
[ enovesces |
[GUTOR Onder No. :1110099001 (Client Tag No. : 01-UPS-7101B
1. General
Material complete
‘Recommendation for system location observed
(Climatic recommendation observed
Electrical Data
2. Mechanical Checks
‘Transportation damages
Loose components/cards
Tightness check
Internal connections (inter cubicle connections)
Extemal connections (permanent / vessporery)—
‘Syotem earthing (permanent / teruporary)
‘Temporary Upstream Fuses / Breaker rating AAC
Permanent-pstream-Fuses / Breaker rating / 250 AAC
oOnmoo0o0o000 E
R
ber 19, 2011
Pagename: Installation Chocks PAGE: /