PROJECT: STONEWORKS

OWNER: MR. ERIC GUSTILLO


LOCATION: KAWAYAN COVE
SUBJECT: BILLING #4
DATE: FEB. 2, 2018

UNIT DESCRIPTION QUANTITY UNIT UNIT COST AMOUNT REMARKS


PERIMETER FENCE
1. LEFT SIDE 52.44 sq. m 800.00 41,952.00
2. REAR 75.00 sq. m 800.00 60,000.00
3. RIGTH SIDE 55.80 sq. m 800.00 44,640.00
ADDITIONAL RIPRAP
4. RIPRAP 2 67.74 sq. m 800.00 54,192.00
5. RIPRAP 3 71.45 sq. m 800.00 57,160.00
REAR
6. RIPRAP 2 54.00 sq. m 800.00 43,200.00
RIGHT SIDE
7. RIPRAP A 14.76 sq. m 800.00 11,200.00
8. RIPRAP B 7.92 sq. m 800.00 6,336.00
9. RIPRAP C 7.20 sq. m 800.00 5,760.00
10. RIPRAP D 5.40 sq. m 800.00 4,320.00
11. RIPRAP E 19.14 sq. m 800.00 15,312.00
12. RIPRAP F 12.60 sq. m 800.00 10,080.00
13. RIPRAF G 25.80 sq. m 800.00 20,640.00
14. RIPRAP H 19.71 sq. m 800.00 15,768.00
Sub-total 390,560.00
15. BOULDERS 22.00 cu. m 1,200.00 26,000.00
16. EXCAVATION 66.35 l. m 700.00 46,445.00
TOTAL AMOUNT 463,405.00
Less ret.10% 39,056.00
st
1 billing 11-4-17 25,272.00
2nd billing 11-18-17 51,120.00
Cash advance 12-9-17 40,000.00
3rd billing 12-16-17 143,108.00
Cash advance 1-13-18 40,000.00
Cash advance 1-27-18 40,000.00
Cash advance 2-03-18 40,000.00
TOTAL BILLING 44,849.00

PREPARED BY:

ROLLY E. LUMASOC