ERLTurkey Projets Business of Easun Reyalle has etensve KEV PROJECTS EXECUTED
experience with a wide variety and size of projects among utilities
and industries ranging from 11KV to 220KV levels, with the EHV Substation Projects
capability to carry out projects up to 400kV.Working through well
We offer complete Turnkey services for Design, Manufacture,
Supply, Construction, Installation, Servicing, Testing &
Commissioning of Projects through 2 Single Window Contact,
established, ISO 9001 accredited project management
procedures, we are able to ensure the efficient execution and
successful delivery of the project. The division has also carried out
transmission line projects up to 220kV voltage levels 66KV Substation For ISRO Layout/ Huttur/
Wellcast Steel For KPTCL In Bangalore
The scope of work included establishing of 2 x 20 MVA, 66/1 1KV
Substation with 12 nos. of L1KV Outgoing feeders and
construction of two Incomer 664V Transmission line
> The Turkey Projects Business of ERL pursues in-depth
knowledge in substations design and construction
> Customers’ benefit includes receiving the most economic
application fulfilling their requirements on delivery, time and
quality
> The strength of the business is complimented by its in-house
manufactured products like HT Switchgear and Vacuum
Interrupters through superior technology and higher market
acceptability
> The well accepted protection system of Easun Reyrolle along,
with Substation Automation System further strengthens the
visibility of the project execution
TURNKEY PROJECTS
Qualified Project Management Team
The project management tear is well experienced in taking full 66/11 KV Switchyard Well Cast
control of all aspects of the project from Concept to Stee! Sub Station
Commissioning. This includes Project Feasibility study, Design &
Engineering, Manufacturing and Procurement
Committed Construction Management Team
We have a well established field quality compliant Construction
Team carrying out Installation, Testing & Commissioning
G6KV Side of 66/11 KV Switebyard at
Huttur Sub Station, Kolarite
220kV Substation at Vrishabhavathy Valley for Transmission Line Projects
KPTCL at Bangalore The Turnkey Projects Business has experience in executing up to
20 kV level ‘sion Line projects as well. This includes
The scope of work included construction of 2x 100 MVA, 220/66
Pe carrying out Route Survey, Supply of Tower Parts and
kV and 2 x 31.50 MVA, 66/11 KV Sub Station at Vrishabhavathy
Line Accessories, Erection and Line Charging.
Valley in. Bangalore and construction of 220 kV associated
transmission line.
in the Control Room of
shabhavathy Substation
Panel Arrange’