This document provides assembly instructions for a product in 4 steps: glue the top and bottom shelves to vertical panels; glue shelves in place; slide and glue back panels into position. The required hardware includes PVA glue, a mallet, and clamps or ratchet straps to hold pieces together during drying.
This document provides assembly instructions for a product in 4 steps: glue the top and bottom shelves to vertical panels; glue shelves in place; slide and glue back panels into position. The required hardware includes PVA glue, a mallet, and clamps or ratchet straps to hold pieces together during drying.
This document provides assembly instructions for a product in 4 steps: glue the top and bottom shelves to vertical panels; glue shelves in place; slide and glue back panels into position. The required hardware includes PVA glue, a mallet, and clamps or ratchet straps to hold pieces together during drying.
This document provides assembly instructions for a product in 4 steps: glue the top and bottom shelves to vertical panels; glue shelves in place; slide and glue back panels into position. The required hardware includes PVA glue, a mallet, and clamps or ratchet straps to hold pieces together during drying.