S@msung1te

Actual Cable Required-20m, 20m, 20m

Planned AGL-23m,Actual AGL-15m (8m AGL deviation),


Planned AZM-20,110,210 ; Actual AZM-330, 110,210 (50 deg AZM deviation in Alpha Sec),
Need additional Vertical support in existing Horizontal Cable tray,
Gamma Sec Pole touching directly to platform (need rectifications),
All Signage Boards are missing,
Lightening Arrester is not available

21.2699
74.74039

2m AGL deviation
30 deg AZM deviation in Beta Sec
Need additional Vertical support in existing Horizontal Cable tray,
Gamma Sec Pole touching directly to platform
All Signage Boards are missing,
Lightening Arrester is not available