Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 1

AS-BUILT

2 29/06/09 Final Issue HMJ QM RVM


Added Actuators for
1 26/11/08 HMJ QM RVM
Compressor Package
0 19/10/08 For Approval HMJ QM RVM
REV DATE DESCRIPTION PREPARED CHECKED APPROVED

THE AUTHOR/ UNDERSIGNED CONFIRM BY THEIR SIGNATURE THAT THIS DRAWING/ DOCUMENT IS MADE AND CHECKED
AND APPROVED FULLY IN ACCORDANCE TO THE REQUIREMENTS OF THE CONTRACT AND HAS PASSED CONTRACTOR'S
QA/ QC PROCEDURES.

CLIENT

HPC - HAYAN PETROLEUM COMPANY


PROJECT

JIHAR STAGE 2 - SURFACE PRODUCTION FACILIITIES

ENGINEER

TECHNIP KTI

CONTRACTOR

INTEGRATED TECHNICAL SERVICES LTD


SUB CONTRACTOR

CONTRACTOR DOCUMENT CODE SUB CONTRACTOR DWG No.

A3101 1206KJ501
TITLE

Actuated Valves Data Sheet

SIZE SCALE SHEETS OF

A4 N/A 1 1 of 6

REVISION

You might also like