Temporary Pipeline - Sludge From Existing Clarifier & PSB
Temporary Pipeline - Sludge From Existing Clarifier & PSB
+7.00
NO.1
NO.2
NO.3
NO.5
DN600:6.0
DN1200:5.2 +7.00
SLUDGE
RECEIVING
TANK
NO.6
NEW TEMPORARY SLUDGE
TRANSFER PUMP
WATER TOWER 0.6M³/MIN
DN1500:5.0
DN600:4.95
NO.7
.95
0:4
60
DN
DN600:6.0
DN300:5.7
DN200:6.3
NO.8
NO.10
DN400 PIPE FOR TRANSFERRING SLUDGE
SLUDGE
TO NEW SLUDGE RECEIVING TANK
RECEIVING
Parking TANK
NO.11
DN200:5.9
DN200:6.3
THICKENER
DN1200:5.0
DN600:5.5
ELECTRICAL
STATION
NO.12
BUILDING
PUMP
DN1200:7.0
DN600:7.7
FILTER
CLEAR WELL
DN400:10.7
NO.13
CLARIFIER
DN1000:6.6
NO.14
SP 100mm
+7.50
+7.0 (New Temporary pipe)
+10.0
+6.40
NEW SLUDGE
+5.40 RECEIVING TANK NEW PERMANENT SLUDGE DRY BED
EXISTING SLUDGE No. 16 ~ No. 23
DRAIN CHANNEL SP 400mm +2.90
+2.20 EXISTING PIPE
170000LX600WX600H (New
DN300mm
CLARIFIER (EXISTING) Temporary
pipe)
+1.0
NEW TEMPORARY SLUDGE
TRANSFER PUMP
0.6M³/MIN
LEGEND:
Temporary Pipeline
Permanent Pipeline