Download as pdf or txt
Download as pdf or txt
You are on page 1of 120

Chilca

800 491
800 493

Documentation

Mechanical Engineering

MB
Gas Turbine

This information must be read prior to the performance of any activity related to modification, operation, mainte-
nance or repair. If the contents should appear unclear or incomplete to the reader, Siemens Power Generation
(PG) must be contacted prior to the performance of any such activity, and clarification must be obtained in writing.
Revisions to the documentation may only be made in writing by personnel duty authorized by the Power Genera-
tion (PG). These documents do not claime to constitute a complete description of all system or component details
or to cover all conceivable operating conditions in connection with modifications, operation, maintenance or re-
pair. Such activities must therefore only be planned or performed in strict compliance with these documents. Non-
observance of this requirement can result in damage to property or in personal injury. Use of a system or compo-
nent together with products supplied by other companies that do not comprise part of the system or component
requires the express prior approval of the Power Generation (PG).

You might also like