Professional Documents
Culture Documents
16 Apr 2017
16 Apr 2017
TANK ULLAGE ULLAGE VOLUME VOLUME FREE WATER OIL VOL V.C.F. OIL VOLUME W.C.F
CORRECTED T.O.V. T.O.V. Interface Int. Cor'ed Volume G.O.V. TEMP TEMP API 60 F TABLE 6 @ 60ºF TABLE 11
NO. m.cm m.cm CU.M. BBLS m.cm m.cm CU.M. VOL.(BBLS) BBLS C F G.S.V. G.S.V. N.S.V.
1C Nil 0 Nil 0 0 0
2C 13.46 13.184 1,672 10,514 17.852 17.574 103.50 651 9,863 32.1 89.8 44.6 0.98513 9,717 24.292 9,692 0.12544
3C 1.52 1.244 6,512 40,957 Nil 40,957 30.5 86.9 44.6 0.98658 40,407 101.017 40,306 0.12544
4C 17.95 17.673 85 537 Nil 537 32.6 90.7 44.6 0.98468 528 1.321 527 0.12544
5C Nil 0 Nil 0 0 0
6C 17.20 16.924 370 2,329 18.225 17.953 0.00 0 2,329 32.0 89.6 44.6 0.98523 2,294 5.74 2,289 0.12544
7C 3.31 3.035 5,982 37,628 18.157 17.881 13.92 88 37,541 30.6 87.1 44.5 0.98650 37,034 92.585 36,942 0.12551
8C 3.25 2.977 5,345 33,617 18.270 17.998 44 277 33,340 30.6 87.1 44.6 0.98648 32,890 82.224 32,807 0.12544
SL.P 7.56 7.262 352 2,213 9.111 8.813 302 1,899 314 32.0 89.6 44.6 0.98523 309 0.773 308 0.12544
SL.S 7.43 7.124 352 2,217 12.000 11.695 206 1,298 919 32.0 89.6 44.6 0.98523 905 2.264 903 0.12544
TOTAL
TOTAL 20,670 130,011 670 4,212 125,799 124,084 123,774
REMARKS: 863 47 815 802 800
PRODUCTION LOADING IN TO 2C
24.00Lt : Change over tank Production COT 2C In to 6 C
Gross Volume :(T.O.V.) 130,011 Oil Volume @ 60 F :(N.S.V.) 123,774 DRAFT FWD 8.60 m AFT
Less Free Water : 4,212 Less OBQ/ROB :
Oil Volume :(G.O.V.) 125,799 Overall Loaded Vol @ 60 F:
Oil Volume @60F:(G.S.V.) 124,084 Long tons/Metric tons :
Long Tons/Metric Tons : 15,568 15,817 Vessel Experience Factor :
API 60 F : 44.6 Adjusted Volum @ 60 F : Capt. Juanda Pardede
B.S & W. % Vol :. 0.25 Long Tons/Metric Tons : CARGO INSPECTOR
BERTH: OYONG
PORT: OYONG OILFIELD
DATE: 16-Apr-17
0 0
1,219 0.12745 1238.383
5,068.647 0.12745 5149.865
66.277 0.12745 67.339
0 0
287.790 0.12745 292.402
4,648.157 0.12752 4722.596
4,125.663 0.12745 4191.771
38.771 0.12745 39.393
113.577 0.12745 115.397
15,568 15,817
Capt.Ihwan Asrul
MASTER
OYONG OPERATORS DAILY REPORT
FSO SURYA PUTRA JAYA 16-Apr-17 @ 2400 HRS
Staff
Surya Putra Jaya Master Capt. Ihwan Asrul Santos Rep. Capt. Juanda Parde
Water Offtake
PFW PH 0
Note: : PRODUCTION LOADING INTO COT 2C
OIW Average (mg/I) 10 Continue free Gas COT 1 C & 5 C
24.00Lt : Change over tank Production COT 2C In to
OIW Peak (mg/I) 0
Regulated Waste
Category Vol (m3) Kg Comments
Biological Waste 0 0
Note :
OYONG OPERATORS DAILY REPORT
Fuel
FSO-MFO FSO-MDO Service Vessel
MDO
Remarks :
Meetings
Incidents
Drills
Type Time Comment
1. Oil Spill On To The Sea 07.30 - 09.30 Carried out drill with satisfact
19-Dec-16
141,460
deg C
deg C
NTO COT 2C
&5C
Production COT 2C In to 6 C
10748 / 123696
e Vessel
Comment
ss
crew
SPKK
sea good
pt. activity
ss
on
Comment
out drill with satisfactory
FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT
Bunkering/Debunkering :
ENGINE :
1. EHS and Security reinduction to all crew
2. Reviewed the workplace inspection / SPKK
3. Table top drill oil spill on to the sea
4. Safety meeting & safety sharing at sea good
9. EHS AUDIT/INSPECTION
TOTAL
4047
4045
TRANS ROB
0 192.77
0 61.87
ROB `
81
305
ROB
200
POB
36
28-Nov-13
NIL
NIL
NIL
MDO
26
27
28
29
30
FUEL STATUS REPORT
MFO
Opening Closing
Receive Transfer Consumption Adjusment
Date Balance Balance Remarks
( Kl ) ( Kl ) ( Kl ) ( Kl ) ( Kl ) ( Kl )
01 203.77 0 0 0 0 203.77
02 203.77 0 0 0 0 203.77
03 203.77 0 0 3.50 0 200.27 Tank Cleaning COT 5C
04 200.27 0 0 0 0 200.27
05 200.27 0 0 0 0 200.27
06 200.27 0 0 0 0 200.27
07 200.27 0 0 0 0 200.27
08 200.27 0 0 0 0 200.27
09 200.27 0 0 0 0 200.27
10 200.27 0 0 3.50 0 196.77 Heating cargo oil
11 196.77 0 0 4.00 0 192.77 Internal cargo transferred
12 192.77 0 0 0 0 192.77
13 192.77 0 0 0 0 192.77
14 192.77 0 0 0 0 192.77
15 192.77 0 0 0 0 192.77
16 192.77 0 0 0 0 192.77
17
18
19
20
21
22
23
24
25
26
27
28
29
30
LOG SHEET DOMESTIC & SANITARY WASTE WATER
Average/
Day 4,970 4,973 4,966 2,652 0 0 0 0 0 0 0 0
LOG SHEET RESERVOIR OSMOSIS WASTE WATER
Crew mess
3 ANDI AHMAD UNIT 2/O room
Weekly tested blood pressure all crew Done Positive 1
Crew mess
5 JULY MANGIRI C/E room
Attended oil spill on to the sea drill Done Positive 1
Crew mess
6 ACO AKBAR 2/E room
Attended oil spill on to the sea drill Done Positive 1
Crew mess
7 RATNO SITUMORANG 3/E room
Attended oil spill on to the sea drill Done Positive 1
Crew mess
9 NIKO ARIYO E/E room
Attended oil spill on to the sea drill Done Positive 1
Crew mess
10 AANG Bosun room
Attended oil spill on to the sea drill Done Positive 1
Crew mess
14 DEDI BIN WARNA OS room
Attended oil spill on to the sea drill Done Positive 1
Crew mess
15 ELIK BUDIANTO FTR room
Attended oil spill on to the sea drill Done Positive 1
Crew mess
16 KAREL PIETERSZ MTM room
Attended oil spill on to the sea drill Done Positive 1
Crew mess
17 SUAIB MTM room
Attended oil spill on to the sea drill Done Positive 1
Crew mess
18 UMAR SAID MTM room
Attended oil spill on to the sea drill Done Positive 1
Crew mess
19 SUMARDI WIPER room
Attended oil spill on to the sea drill Done Positive 1
21 MASRUDI 2ND/Cook Galley Daily house keeping at galley areas Done Positive 1
22 HARIANTO SULE TANAN STWD Deck C House keeping in visitor cabin Done Positive 1
23 BOBBY MANGONTO STWD Galley Daily house keeping at galley Done Positive 1
TOTAL 23
FSO.SURYA PUTRA JAYA
TANK CLEANING AND GAS FREE SEQUENCE
EQUIPMENT :
1. CARGO PUMP 4 SET
2. STRIPPING PUMP 1 SET
3. CARGO HEATER 1 SET
4. BUTTERWORTH 4 UNIT
5. TANK CLEANING HOSE 5 SET ( 25 MTRS)
6. FIX TANK CLEANING MACHINE IN COT
7. I.G.S FAN 2 SETS
8. PNEUMATIC DRIVEN FAN 4 SETS HEATING & INNERTING COT 1 C & 5 C
TIME
N0 ACTIIVITY DATE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
1 HEATING CARGO
COT 1C 13/Mar/17 RESULT O² : 6%
COT 5C 13/Mar/17 RESULT TEMPERATURE : 45°C
COT 1 C
3 Tank Pressure Released 14/Mar/17
4 BUTTERWORTHING COT 1C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 14/Mar/17
2ND STAGE ( 8 MTRS ) 14/Mar/17
1ST STAGE ( 12 MTRS ) 14/Mar/17
1ST STAGE ( 16 MTRS ) 14/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 1C TO SLOP P/S DURING BUTTERWORTHING
5 BUTTERWORTHING COT 1C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 15/Mar/17
2ND STAGE ( 8 MTRS ) 15/Mar/17
1ST STAGE ( 12 MTRS ) 15/Mar/17
1ST STAGE ( 16 MTRS ) 15/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 1C TO SLOP P/S DURING BUTTERWORTHING
12
10
10
40
OUTH AREA
11
11
61
22
22
22
22
22
22
193
FSO.SURYA PUTRA JAYA
TANK CLEANING AND GAS FREE SEQUENCE
EQUIPMENT :
1. CARGO PUMP 4 SET
2. STRIPPING PUMP 1 SET
3. CARGO HEATER 1 SET
4. BUTTERWORTH 4 PCS
5. TANK CLEANING HOSE 5 SET ( 25 MTRS)
6. MACHINE TANK CLEANING IN USE
7. FIX BLOWER FAN IG 2 SET
8. PORTABLE AIR DRIVE FAN 4 SET HEATING & INNERTING COT 1 C & 5 C : 9 HRS
TIME
N0 ACTIIVITY DATE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
1 HEATING CARGO
COT 1C 13/Mar/17 1 1 RESULT O² : 6%
COT 5C 13/Mar/17 1 1 RESULT TEMPERATURE : 45°C
COT 5 C
3 Tank Pressure Released 21/Mar/17
4 BUTTERWORTHING COT 5C ( COP NO. 2 ) 21/Mar/17
1ST STAGE ( 4 MTRS ) 21/Mar/17
2ND STAGE ( 8 MTRS ) 21/Mar/17
1ST STAGE ( 12 MTRS ) 21/Mar/17
1ST STAGE ( 16 MTRS ) 21/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 5C TO SLOP P/S DURING BUTTERWORTHING
5 BUTTERWORTHING COT 5C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 22/Mar/17
2ND STAGE ( 8 MTRS ) 22/Mar/17
1ST STAGE ( 12 MTRS ) 22/Mar/17
1ST STAGE ( 16 MTRS ) 22/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 5C TO SLOP P/S DURING BUTTERWORTHING
6 BUTTERWORTHING COT 5C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 23/Mar/17
2ND STAGE ( 8 MTRS ) 23/Mar/17
1ST STAGE ( 12 MTRS ) 23/Mar/17
1ST STAGE ( 16 MTRS ) 23/Mar/17
NOTE : 27TH MARCH 2017 COMPLETED I.G.S FAN AND CONTINUED GAS FREE BY PNEUMATIC AIR DRIVEN FAN
GAS FREE IN CARGO TANK WILL BE MAINTAINED ONLY BY USED PNEUMATIC AIR DRIVEN FANOPERATED ALL THE TIMES,
DUE TO REMAINING SLUDGE IN TANKS.
TTL HRS
24
10
10
10
46
UTH
5
8
59
8
4
%
21
0
8
5
%
21
15
15
15
112