Professional Documents
Culture Documents
18 Apr 2017
18 Apr 2017
18 Apr 2017
TANK ULLAGE ULLAGE VOLUME VOLUME FREE WATER OIL VOL V.C.F. OIL VOLUME W.C.F
CORRECTED T.O.V. T.O.V. Interface Int. Cor'ed Volume G.O.V. TEMP TEMP API 60 F TABLE 6 @ 60ºF TABLE 11
NO. m.cm m.cm CU.M. BBLS m.cm m.cm CU.M. VOL.(BBLS) BBLS C F G.S.V. G.S.V. N.S.V.
1C Nil 0 Nil 0 0 0
2C 17.90 17.641 82 515 18.220 17.962 0 0 515 31.4 88.5 44.6 0.98578 507 1.268 506 0.12544
3C 1.00 0.758 6,639 41,759 Nil 41,759 31.2 88.2 44.6 0.98593 41,172 102.929 41,069 0.12544
4C 17.24 16.993 343 2,160 Nil 2,160 31.4 88.5 44.6 0.98578 2,129 5.323 2,124 0.12544
5C Nil 0 Nil 0 0 0
6C 16.55 16.304 619 3,893 18.110 17.869 15 94 3,799 31.9 89.4 44.6 0.98533 3,743 9.36 3,734 0.12544
7C 1.00 0.759 6,651 41,835 18.157 17.903 6 39 41,796 30.2 86.4 44.5 0.98685 41,246 103.116 41,143 0.12551
8C 1.00 0.762 5,936 37,338 18.380 18.139 6 36 37,301 30.7 87.3 44.6 0.98638 36,793 91.983 36,701 0.12544
SL.P 5.50 5.221 417 2,625 5.535 5.256 416 2,618 7 32.0 89.6 44.6 0.98523 7 0.017 7 0.12544
SL.S 17.86 17.566 19 117 18.350 18.056 3 19 99 32.0 89.6 44.6 0.98523 97 0.243 97 0.12544
TOTAL
TOTAL 20,707 130,242 446 2,807 127,435 125,695 125,380
REMARKS: 869 47 822 808 806
PRODUCTION LOADING IN TO 6C
DECANTING PW : 1500 BBLS
DEBOTTOMING PW IN TO SLOP TANK
INTERNAL TRANSFER COT 2 C INTO TANK NOMINATION FOR OFFTAKE ( COT 3C, 7C & 8C )
24.00lt CHANGE OVER TANK PRODUCTION COT 6C IN TO 2C
Gross Volume :(T.O.V.) 130,242 Oil Volume @ 60 F :(N.S.V.) 125,380 DRAFT FWD 8.00 m AFT
Less Free Water : 2,807 Less OBQ/ROB :
Oil Volume :(G.O.V.) 127,435 Overall Loaded Vol @ 60 F:
Oil Volume @60F:(G.S.V.) 125,695 Long tons/Metric tons :
Long Tons/Metric Tons : 15,770 16,023 Vessel Experience Factor :
API 60 F : 44.6 Adjusted Volum @ 60 F : Capt. Juanda Pardede
B.S & W. % Vol :. 0.25 Long Tons/Metric Tons : CARGO INSPECTOR
BERTH: OYONG
PORT: OYONG OILFIELD
DATE: 18-Apr-17
0 0
64 0.12745 64.666
5,165 0.12745 5247.330
267 0.12745 271.346
0 0
470 0.12745 477.055
5,177 0.12752 5259.734
4,615 0.12745 4689.276
0.875 0.12745 0.889
12.177 0.12745 12.372
15,770 16,023
Staff
Surya Putra Jaya Master Capt. Ihwan Asrul Santos Rep. Capt. Juanda Parde
Water Offtake
PFW PH 0
Note: : PRODUCTION LOADING INTO COT 6C
OIW Average (mg/I) 10 Continue free Gas COT 1 C & 5 C
DECANTING PW : 1500 BBLS
OIW Peak (mg/I) 0 DEBOTTOMING PW IN TO SLOP TANK
INTERNAL TRANSFER COT 2 C INTO TANK NOMINATIO
24.00lt CHANGE OVER TANK PRODUCTION COT
Regulated Waste
Category Vol (m3) Kg Comments
Biological Waste 0 0
Note :
OYONG OPERATORS DAILY REPORT
Fuel
FSO-MFO FSO-MDO Service Vessel
MDO
Meetings
Incidents
Drills
Type Time Comment
S.T.O.P. Audit program
19-Dec-16
141,460
deg C
deg C
NTO COT 6C
&5C
SLOP TANK
C INTO TANK NOMINATION FOR OFFTAKE ( COT 3C, 7C & 8C )
NK PRODUCTION COT 6C IN TO 2C 3842 / 125396
e Vessel
Comment
ss
on
ump room
ballast pump for internal cargo transferred
pt. activity
ss
on
Comment
FSO SURYA PUTRA JAYA - DAILY ACTIVITY REPORT
Bunkering/Debunkering :
9. EHS AUDIT/INSPECTION
TOTAL
4060
4058
TRANS ROB
0 189.77
0 58.75
ROB `
81
325
ROB
200
POB
37
28-Nov-13
NIL
NIL
NIL
NIL
NIL
FUEL STATUS REPORT
MDO
19
20
21
22
23
24
25
26
27
28
29
30
FUEL STATUS REPORT
MFO
Opening Closing
Receive Transfer Consumption Adjusment
Date Balance Balance Remarks
( Kl ) ( Kl ) ( Kl ) ( Kl ) ( Kl ) ( Kl )
01 203.77 0 0 0 0 203.77
02 203.77 0 0 0 0 203.77
03 203.77 0 0 3.50 0 200.27 Tank Cleaning COT 5C
04 200.27 0 0 0 0 200.27
05 200.27 0 0 0 0 200.27
06 200.27 0 0 0 0 200.27
07 200.27 0 0 0 0 200.27
08 200.27 0 0 0 0 200.27
09 200.27 0 0 0 0 200.27
10 200.27 0 0 3.50 0 196.77 Heating cargo oil
11 196.77 0 0 4.00 0 192.77 Internal cargo transferred
12 192.77 0 0 0 0 192.77
13 192.77 0 0 0 0 192.77
14 192.77 0 0 0 0 192.77
15 192.77 0 0 0 0 192.77
16 192.77 0 0 0 0 192.77
17 192.77 0 0 0 0 192.77
18 192.77 0 0 3.00 0 189.77 Internal cargo transferred
19
20
21
22
23
24
25
26
27
28
29
30
LOG SHEET DOMESTIC & SANITARY WASTE WATER
Average/
Day 4,970 4,973 4,966 2,983 0 0 0 0 0 0 0 0
LOG SHEET RESERVOIR OSMOSIS WASTE WATER
2 IYYANG C/O CCR All in charged internal cargo transferred Done Positive 1
6 ACO AKBAR 2/E Engine Room Maintenance M.A.C No.1 & 2 Done Positive 1
18 UMAR SAID MTM Engine Room Assisted 2/E Maintenance M.A.C No.1 & 2 Done Positive 1
Emergency fire
19 SUMARDI WIPER pump room
House keeping in emergency fire pump room Done Positive 1
21 MASRUDI 2ND/Cook Galley Daily house keeping cooking equipment Done Positive 1
22 HARIANTO SULE TANAN STWD CCR House keeping in cargo control room area Done Positive 1
23 BOBBY MANGONTO STWD Galley Daily house keeping in galley Done Positive 1
TOTAL 23
FSO.SURYA PUTRA JAYA
TANK CLEANING AND GAS FREE SEQUENCE
EQUIPMENT :
1. CARGO PUMP 4 SET
2. STRIPPING PUMP 1 SET
3. CARGO HEATER 1 SET
4. BUTTERWORTH 4 UNIT
5. TANK CLEANING HOSE 5 SET ( 25 MTRS)
6. FIX TANK CLEANING MACHINE IN COT
7. I.G.S FAN 2 SETS
8. PNEUMATIC DRIVEN FAN 4 SETS HEATING & INNERTING COT 1 C & 5 C
TIME
N0 ACTIIVITY DATE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
1 HEATING CARGO
COT 1C 13/Mar/17 RESULT O² : 6%
COT 5C 13/Mar/17 RESULT TEMPERATURE : 45°C
COT 1 C
3 Tank Pressure Released 14/Mar/17
4 BUTTERWORTHING COT 1C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 14/Mar/17
2ND STAGE ( 8 MTRS ) 14/Mar/17
1ST STAGE ( 12 MTRS ) 14/Mar/17
1ST STAGE ( 16 MTRS ) 14/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 1C TO SLOP P/S DURING BUTTERWORTHING
5 BUTTERWORTHING COT 1C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 15/Mar/17
2ND STAGE ( 8 MTRS ) 15/Mar/17
1ST STAGE ( 12 MTRS ) 15/Mar/17
1ST STAGE ( 16 MTRS ) 15/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 1C TO SLOP P/S DURING BUTTERWORTHING
12
10
10
40
OUTH AREA
11
11
61
22
22
22
22
22
22
193
FSO.SURYA PUTRA JAYA
TANK CLEANING AND GAS FREE SEQUENCE
EQUIPMENT :
1. CARGO PUMP 4 SET
2. STRIPPING PUMP 1 SET
3. CARGO HEATER 1 SET
4. BUTTERWORTH 4 PCS
5. TANK CLEANING HOSE 5 SET ( 25 MTRS)
6. MACHINE TANK CLEANING IN USE
7. FIX BLOWER FAN IG 2 SET
8. PORTABLE AIR DRIVE FAN 4 SET HEATING & INNERTING COT 1 C & 5 C : 9 HRS
TIME
N0 ACTIIVITY DATE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
1 HEATING CARGO
COT 1C 13/Mar/17 1 1 RESULT O² : 6%
COT 5C 13/Mar/17 1 1 RESULT TEMPERATURE : 45°C
COT 5 C
3 Tank Pressure Released 21/Mar/17
4 BUTTERWORTHING COT 5C ( COP NO. 2 ) 21/Mar/17
1ST STAGE ( 4 MTRS ) 21/Mar/17
2ND STAGE ( 8 MTRS ) 21/Mar/17
1ST STAGE ( 12 MTRS ) 21/Mar/17
1ST STAGE ( 16 MTRS ) 21/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 5C TO SLOP P/S DURING BUTTERWORTHING
5 BUTTERWORTHING COT 5C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 22/Mar/17
2ND STAGE ( 8 MTRS ) 22/Mar/17
1ST STAGE ( 12 MTRS ) 22/Mar/17
1ST STAGE ( 16 MTRS ) 22/Mar/17
STRIPPING PUMP OPERATED, TRANSFER OILY WATER
FROM COT 5C TO SLOP P/S DURING BUTTERWORTHING
6 BUTTERWORTHING COT 5C ( COP NO. 2 )
1ST STAGE ( 4 MTRS ) 23/Mar/17
2ND STAGE ( 8 MTRS ) 23/Mar/17
1ST STAGE ( 12 MTRS ) 23/Mar/17
1ST STAGE ( 16 MTRS ) 23/Mar/17
NOTE : 27TH MARCH 2017 COMPLETED I.G.S FAN AND CONTINUED GAS FREE BY PNEUMATIC AIR DRIVEN FAN
GAS FREE IN CARGO TANK WILL BE MAINTAINED ONLY BY USED PNEUMATIC AIR DRIVEN FANOPERATED ALL THE TIMES,
DUE TO REMAINING SLUDGE IN TANKS.
TTL HRS
24
10
10
10
46
UTH
5
8
59
8
4
%
21
0
8
5
%
21
15
15
15
112