Carpenters Union 2015 Forest City Ratner Article

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

THE DISTRICT COUNCIL AND FOREST CITY RATNER

MAKING DOWNTOWN BROOKLYN AFFORDABLE

S o often, the fight to get Union Labor on an affordable housing


project can be a debilitating hurdle: Members picket, politicians
profess, the media picks sides, and the term affordable loses its
meaning. Developers and contractors often say that affordable
housing can’t be built affordably with Union labor because they
think that prevailing wages will drive any sort of frugality to building Brooklyn Navy Yard
Forest City Modular
out the window. Unions argue that the developments are never Modular building crew,
truly affordable because the people building them can’t afford to primarily staffed through
2790
live there.

It’s therefore refreshing step in the right direction. “It’s an and “affordable housing” get put Incorporated into this running, Forest City was one of Average Median Income (AMI). A
to work with Forest City Ratner, 8 year project, to the tune of about together. “We’re hoping that this shared goal though is a give and the first companies to take on portion will be strictly market rate,
a developer with a history of $3.4 billion, so we locked it all in,” can act as a model to help local take on both sides. When Forest provisional workers at its sites. but you’ll have a mid-AMI building,
Union labor, a history of building says McInnis. The fact that Forest politicians to understand that the City Ratner needed help pushing There are currently two sites with maybe a low-AMI building, maybe
affordable housing, and a future City is willing to do it all Union, and Union can provide the living wage, their projects through, “we put in partial provisional work, while the a blend building. It’s all about how
that enjoins the two without to really push affordable housing the hiring from the community, that a lot of time and a lot of people, plan is to incorporate it more and the units are divvied up.”
making any excuses. “He’s always percentages up is very important. we’re satisfying all those needs,” lots of Members doing picket duty more as the future sites begin
In the end, this offers an
built Union,” says District Council As Business Agent Ken Bluhm says Area Standards Representative at these rallies,” to try and help construction.
example of finding a compromise
President Stephen McInnis. “We notes, “considering the current Carlisle Paul. “This is a model Forest City achieve their goals,
The District Council that works for both parties. “We
had to preserve that relationship building boom in Brooklyn, Forest that we want to spread. The CEO notes McInnis. Another thing that
also wants to ensure that the can try and bang a square peg
during a very difficult time where City is a responsible developer that of Forest City Ratner wishes she is working for both sides is the
local community is a part of the into a round hole, but unless
contractors were walking away, but is making a substantial commitment could develop into Queens and the Provisional Carpenter Program.
development process, and Forest we’re able to work on these
there are still companies out there to affordable housing. All of these Bronx, so it’s important that the “The Provisional program wasn’t
City is using the Provisional types of partnerships, it’s going
who are committed to building other contractors doing it non- Building Trades is a part of all this around at the time, but there
program to help ensure that. As to be rough,” says McInnis. Both
entirely Union." A difficult thing union can’t touch this level of affordable housing,” Paul notes. was always an understanding
far as making sure that a Carpenter parties are hoping that this is a fit
to consider for the District Council development.” The more solid examples that the that the Unions would provide
building the site can one day that will hold together for future
has been the deteriorating state Unions can present, the more it can economic incentive to help Forest
The Unions are hoping that afford to live there, McInnis notes development.
of Union market share, but the turn back the assumption that the City realize its goals,” says Bluhm.
this type of work can cover all that “there’s 14 buildings, and
amount of downtown Brooklyn that choice has to be between Union Now that the District Council has
the bases that usually get argued a percentage of it is tied to the
Forest City is looking to do is a big and affordable. its Provisional program up and
about when the terms “union labor”

550 Vanderbilt Avnue 535 Carlton Avenue Atlantic Yards Barclays Stadium Interior 461 Dean Street Barclays Stadium Exterior
EIC Associates/Regal Construction Difama Concrete Posillico/Tully Manhattan Company Cord Contractor CCC
Upper structure has started; 100 Upper Structure and Super Infrastructure work for buildings to Work to contain the sound from the Modular housing interior, right by Green roof and exterior; underneath
Affordable Housing; Provisional Strucutre; Provisional Carpenters sit on top of rail yards arena for the residents around the Barclays Center roof is sound attenuation through
building sheet rock to be done

18 WWW.NYCDISTRICTCOUNCIL.ORG FALL2015 THE CARPENTER 19

You might also like