Download as pdf
Download as pdf
You are on page 1of 7
QS-8220 Factory Acceptance Test Part # TP-6000119 ie peed) Procedure (Commercial) Reva Commercial FAT a | Company Proprietary Page 1 of 7 Impla TORPORV TION QS-B220 Factory Acceptance Test Procedure (Commercial) FAT ‘System Serial Number: Software Version: Implant Sciences Representative: | Printed Name | Customer Representative: Date of FAT: Implant Sciences Corporation 500 Research Drive, Unit 3 Wilmington, MA01887 QS-8220 Factory Acceptance Test | Qs-8220 Procedure (Commercial) Commercial FAT Company Proprietary Purpose. Test Configuration and Descri Required Materials. QS-8220 Factory Acceptance Test Procedure. 44° Visual Inspection... 4.2 Hardware Verification .. 43 Warm Start-up Verification. 4.4 Calibration and Verification 4.5 Sampling Verification 46 Explosives Detection Verification... 4.7 Narcotics Detection Verification. 4.8 System and Start-up Verification Document History This table describes the history of the document in change order (latest changes at the bottom). Version Date Author Change History i ‘09/09/2016 | Christine Macneil_| initial Draft A 12/07/2016 C.Macneil__ | Updates and Release per ECO 16-120 QS-B220 Factory Accoptance Test Part # TP-6000119 as-2220 Procedure (Commercial) Commercial FAT 1 Purpose ‘The purpose of this document is to describe test procedures for the QS-B220 Factory Acceptance Test (FAT) for commercial customers. ‘The purpose of this Factory Acceptance Test procedure is to ensure that the unit is fully operational, meets detection requirements and contains no visual or aesthetic discrepancies prior to delivery. The procedure is broken into discrete segments that address functional, mechanical and visual aspects of the inspectionfest process. 2. Test Configuration and Description Configuration for the test (unless specified otherwise) is standard commercial configurations of the QS- 8220, 3 > Required Materials ‘The following materials are required in order to perform this Factory Acceptance Test on the QS-B220 Systems, ‘Stopwatch Verification A Sample Verification B Sample ‘Sample Traps Nitrile Gloves Pipettor (0.5 ~ 10 uL) Single explosive solution (RDX) Double explosive solution (RDX & PETN) ‘Single Narcotics solution (COC) 4 QS-B220 Factory Acceptance Test Procedure All second party applications and windows must be closed throughout the test. NOTE: THE SYSTEM MUST BE POWERED ON FOR A MINIMUM OF 24 HOURS BEFORE CONDUCTING FAT! QS-8220 Factory Acceptance Test Part # TP-6000119 os seed) Procedure (Commercial) con Commercial FAT Company Proprietary Page 4 of 7 4.1 Visual Inspection Itis important to verify that the unit, supplies and accessories are included an undamaged. Visually inspect the unit so that no scratches are present. Detailed test description [step] Action Expected Response TPF] [Visually inspect all exterior surfaces of the All corners and edges of the system are curved, 4 |@S-8220 to ensure that there are no [smooth and rounded so that a user's skin or |scratches, dents, or other physical [clothing will not be punctured, cut of torn during Ideficiencies with the unit. use. 2 [Ensure that the cabin fan fileris allached |The cabin fan fiteris allached al the rear of he lat the rear of the unit and is not damaged. unit and is not damaged. 3 [Verify that the serial nameplate is atlached |The serial namoplato is attached to the back left to the back left commer of the unit Icomer of the unit \Visuaily inspect the shipping container set_|The shipping container set up contains all 4 |up and ensure that all consumables are consumables. present _ 4.2 Hardware Verification Detailed test description: Verify that the UO panel located in the back |The VO panel located in the back right corner right comer has the following peripherals: [contains the following peripherals: 1 |)4xUSB Ports | 4x USB Ports 1 x Ethemet Connection | 4 x Ethernet Connection | 1 x speaker 1 x speaker |. 1 x External Display Connection 1 x External Display Connection [Vent thatthe B220 System contains an |The system includes an internal printer GT intemal printer it applicable) lappicable). QS-B220 Factory Acceptance Test Part # TP-6000119 joe beet) Procedure (Commercial) oa Commercial FAT ‘Company Proprietary Page $ of 7 4.3 Warm Start-up Verification Warm start-up occurs when the system has been powered off for a period of loss than 30 minutes and then is powered on. Note: The system off time should be timed from when the software has completed shutdown (when the screen goes black) and NOT from when the power button is turned off. The olf time is calculated by the software and as such must be timed from software shutdown and not the physical power switch off Detailed test description: tej Ration Expected Response PIE 1|_JObiain a stop watch. [A slop walch is obtained. 2, [bog onto the system as a supervisor or | The system is logged on. labove. 3 [Press the Shutdown button. [The Shutdown button is pressed. The system lbegins to shut down the software When the software has completed The powor button is turned off. 4 |shutdown (the screen goes black), turn off the power button, lLeave the system in a powered down state |The system is powered down for a ume or a period of at least 5 minutes but less [between S and less than 30 minutes. 5 than 80 minutes. ("*See note above regarding timing) saa @ _[Siarl the stop watch and simultaneously |The stop waioh le simultaneously started as the ower on the system, [power is switched on, 7 [tou on to the system as a supervisor or |The system is logged on- labove. @_ [Stop the slop watch when the Wain Mana |The Main Menu soreen appears in foss than 15 screen appears minutes. [Record the time from the stop waich. |The time on he stop watch is fess than 15 ei minutes. |Verity that the 6220 serial number on the — |The serial number on the B220 label is the 10 |label matches the serial number displayed _|same as the serial number displayed in the lin the software. software, 4.4 Calibration and Verification Detailed test desc: 1|_[Press the Maintenance button. 2 [Press the Calibration button. [The Calibration screen is displayed. '3_ [Perform a Calibration. [The system performs a Calibration. 4_|Press the Back button. [The Maintenance menu is displayed. 5 _[Pross the Verification bullon. [The Verification screen is displayed. as-8220 Q8-B220 Factory Acceptance Test Procedure (Commercial) Part # TP-6000119 RevA Commercial FAT Company Proprietary 8 Weritication. performed. Press the Print button located at the botlom |+ The printer prints the record of the Verification lof the Verification Screen. (if applicable) | The printout contains the name ofthe user, 7 system serial number, software version, algorithm version, and verification results. (C* if applicable) '8_|Press the Back button. [The Maintenance menu is displayed. 9g [Press the Back button [The Main Menu is displayed. ____|TIhe system is Ready to Sample. 40 [Press the Logoff button. [The system is logged oft _____|The logon screen is displayed. 4.5 Sampling Verification Dotalled tost description: 1_|Log on as an operator/screener. [The system is logged on. 2. [Stat the stopwatch while inserting a blank |The stopwaich is staried as the blank sample |sample tap into the desorber. lrap is inserted into the desorber. 3 [Remove the sample trap whon prompted fo |The sample trap is removed when the system ldo so. —__|prompts to do so. “4. [Acknowledge the "No Alarm, Insert tap to |The message is acknowledged and then lbegin” message. removed from the screen. [Stop the stopwatch when the status [The stopwatch is stopped when the system Imessage reads “Ready to Sample’ in _|status reads "Ready to Sample". 5 |ateen. Record the time on the stopwatch: ‘¢[Perform an alarm sample by inserting a [An alarm sample is performed. Idoped trap into the desorber. [Remove the trap when prompted to do s0. |The tap is removed when the system prompis 7 todo so. [Press the Acknowledge Alarm bution while |The stopwatch is started as the Acknowiedge simultaneously starting the stopwatch. __|Alarm button is pressed. [Stop the stopwatch when the clear down |The stopwatch is stopped when the clear down lcycle is complete. lcycle is complete. 2 Record tho time on the stopwatch: | ‘QS-B220 Factory Acceptance Test Part # TP-6000119 | as-6220 Procedure (Commercial) oe Commercial FAT ~ — Company Proprietary Page 7 of7 4.6 _ Explosives Detection Verification Dotailed tost description: (Step) Action Expected Response PE] Prom an arm sample wilt a doped Wap |" The sample alarms and the alam coreen is 4 foontaininga dual explosive solution. isplayed onthe system | The alarm substance Is Iisted as PETN and DX. Porfarm an alarm sample wih a doped trap |> The sample alams and the alarm screen Is 2. |eontaininga single explosive solution, |isplayod on tho systom. | The alarm substance is listed as ROX. 4.7 Narcotics Detection Ve Detailed test descriptior Stay ‘Action Expected Response Pr Perform an alarm sample with a doped trap |+ The sample alarms and the alarm screen is, 1 [containing a single narcotic solution. \displayed on the system. |The alarm substance is listed as COC. 4.8 System and Start-up Verification Detailed test description: [step Action Expected Response Pe] 41 [Complete information on cover page. FAT Complete.

You might also like