Professional Documents
Culture Documents
Faculty Members Porposal Cont
Faculty Members Porposal Cont
Faculty Members Porposal Cont
P R O J E C T P R O P O S A L FORM
PROJECT OVERVIEW
PROJECT Operation Excellence 2018
TITLE:
PROJECT Give the background and importance of the project. Identify the importance of the
RATIONALE: activity. List the success indicator
The importance of the activity is to make the professors of UST feel that we are grateful for them.
GENERAL Overall intention of the project. State only one general objective.
OBJECTIVE
To strengthen the student-teacher relationship and to celebrate the teacher's day in very
memorable manner.
SPECIFIC List down the specific steps that need to be accomplished in order achieve the general
OBJECTIVES objective. Indicate expected results for each specific objective. Identify only 3 three specific
objectives.
SPECIFIC EXPECTED RESULTS
OBJECTIVES
1 To strengthen the So that the students will not be afraid of the teachers. It will make them more approachable.
student-teacher
relationship in terms
of friendship and as
the student's 2nd
parent
PROPOSED PROGRAM FLOW: List down the sequence of events that needs to be followed for the
success and completion of the said project
Target Date: October 5, 2018 Target Venue: UST Qpav Classroom
Time Activity Description Point Person/Group
7:00AM Assembly Dolor
7:30AM Start of Presentation Chua
8:00AM Start of Breakfast with the Rotairo
Teacher
PROPOSED BUDGET: State the anticipated cost of the project. Please add or delete sub-items and
corresponding rows when necessary
I. Personnel
ITEM Number of participants
Students/ Athletes 30
Admin/Faculty/ Coaches/ Support Staf 4
Others
TOTAL
II. Operations and Logistics
ITEM DESCRIPTION (Number of Total
participants x Monetary Value x
No. of Days)
Snacks (Food for breakfast) 30 x 40 x 1 PhP 1,200
Sub Total 1: PhP 1,200.00
III. Materials and Supplies
ITEM DESCRIPTION Total
Giveaways 30 x 25 x 1 PhP 750.00
Sub Total 2: PhP 750.00
IV. Others (e.g Honorarium)
ITEM DESCRIPTION Total
PhP 00.00
PhP 00.00
Sub Total 3: PhP 00.00
PROPOSED PROJECT BUDGET SUMMARY
ITEM Total
I. Operations and Logistics 1,200.00
II. Material and Supplies 750.00
III. Others 00.00
GRAND TOTAL PhP 1,950.00
PROJECT EVALUATION: State the possible way/s how the project’s achievements be evaluated. List
down the needs to be done in order to know whether the project has achieved its general and specific
objectives.
Kindly check the box that corresponds to your answer.
Please rate your overall satisfaction with the event: (5 being the highest, 1 being the
lowest)
1 2 3 4 5
Name
Designation