Calculate the flow rate in a horizontal reservoir 5000 ft long, having absolute
permeability of 30 md. The reservoir is 1000 ft wide and has 20 ft net pay. The oil in the
reservoir has a viscosity of 2 cp. The pressure at the right end is 2500 psia and the
pressure at the left end is 1200 psia.
SOLUTION
1. Comprehension and analysis of the statement of the problem:
Calculate the flow rate ( q ? RB/D) in a horizontal reservoir 5000 ft long (
L 5000 ft), having absolute permeability of 30 md ( k 30 md). The reservoir is
1000 ft wide and has 20 ft net pay ( A 1000 20 ft2). The oil in the reservoir has
a viscosity of 2 cp ( 2 cp). The pressure at the right end is 2500 psia (
pL pup 2500 psia) and the pressure at the left end is 1200 psia (
pR pdn 1200 psia).
2. Solution:
( The problem uses field units).
kA p kA ( pup pdn )
q c c .
L L
Question 10:
A sample of reservoir liquid with volume of 400 cc under reservoir conditions was passed
through a separator and into a stock tank at atmospheric pressure and 600F.
The liquid volume in the stock tank was 274 cc. A total of 1.21 scf of gas was released.
Solution
Question 11:
Example 2-17 data
Question 12:
An oil-water reservoir extends over 16,000 acres and has average net thickness of
32 ft. Reservoir average porosity is 22%. Average oil saturation is estimated at
80%. Oil formation-volume-factor at initial pressure is 1.23 RB/STB. Estimate the
initial oil-in-place in this reservoir.
SOLUTION
1. Comprehension and analysis of the statement of the problem:
An oil-water reservoir extends over 16,000 acres ( A 16000 acres) and has
average net thickness of 32 ft ( h 32 ft). Reservoir average porosity is 22% (
0.22 ). Average oil saturation is estimated at 80% ( So 0.80 ). Oil formation-
volume-factor at initial pressure is 1.23 RB/STB ( Bo 1.23 RB/STB). Estimate
the initial oil-in-place in this reservoir ( N ? STB).
2. Solution:
N 7758AhSo / Bo .
Solution