Ref. No, [SsB-PRIMIS__] o SUHATI SDN BED [Revision No | METHOD OF STATEMENT mee oe 2a ; ee _ ———— METHOD STATEMENT FOR SITE INSTALLATION, MOBILISATION & DEMOBILISATION —_—__—_—————— RefNo. SSB-PRIMIS SUHATI SDN BHD REA 3 4 Bffective Date | 26/092014 E METHOD OF STATEMENT Tis a | —————————————— CONTENTS 1.0 Site Installation 2.0 Mobilization 3.0 Demobilization FPREMIS [ SUHATI SDN BED RevisionNo 9] Effective ats] 26/09/2014 METHOD OF STATEMENT Pigs were ia 2.0 ite Installation The contractor's project office will be set up at the existing shop lots locatedadjacent ‘0 the project site. Site cabins willbe set up at the center location near Bridge No. 4 to facilitate ease of construction supervision and coordination with the various sub- contractors and suppliers. Other temporary site installations i.e. the workshops, workers! quarters, stores, Imeterial storage yards, fabrication yard, etc. will be located near the site cabins at Bridge No. 4, ‘The installation of these facies shall comply with the requirements of the contract and the relevant authorities, Mobilization ‘Access to the site which Is currently occupied by the temporary buildings within the R.0.W. shall be prepared upon the removal of the buildings. Punch-in at suitable locations will be provided along the alignment to faciitate ease of access, The temporary access and the punch-in shall be constructed in compliance with the requirements of the contract and the relevant authorities, Mobllzation of the various plant and equipment shall be carried out through the existing road, temporary access and punch-in to the required works areas, Construction materials shall be transported to the site during off peak trafic hours and stockpiled at strategic work areas to ensure adequate material supply and to ease the problem of material delivery during the rush hours of the day, [ssB-PRIMIS SUHATI SDN BHD - | METHOD OF STATEMENT — Date acon So 0 Demobilization ‘The demobilization of the plant and equipment are cartied out in the same manner when the plant and equipment are no longer required for the works and with the Prior approval of the Engineer/ S,0,

You might also like