Professional Documents
Culture Documents
Chapter 7
Chapter 7
Chapter 7
1
See Section 7.4.1
Solution 7.2
1. Carbon steel, schedule 40, life 3 years
Number of replacements = 3
Cost = 3 x L(3 + 10) = £39L (where L = pipe length)
Solution 7.8
See Section 7.7.
Stainless steel, type 304 would be suitable. Aluminium could be considered as an alternative.