Annex-A Thermal Power Plants

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 29

INFORMATION PLAN FOR NETWORK & GENERATION EQUIPMENT Annex-A

General Instructions: The following Guidelines may please be followed for completion of all templates
1. The soft form of this proforma is avaialble for download at the link "http://bit.ly/2kyVryu" under title "Annex-A THERMAL Power Plant"
2. All information must be in accordance with NPCC Standard Nomenclature and given format.
3. Terminologies/ nomenclature for data/ information may be used as given in this document.
4. Number of records may be added / provided as per actual number of CBs, Lines, Transformers and Generation Units etc.
5. Provide the photocopy of name plate data of each transformer along with winding connection diagram
6. Provide factory testing report of the transformer in which open circuit and short circuit tests are given with their test results.
7. For Generators provide the capability curve table.

A. Power Plant Information

Coal fired powe project Total No of Fuels. (Multi fuel Number of Units that Can Start
Name of Power Plant TWO (02 No)
(CFPP) Units) Simultaniously

Installed Capacity (MW) 50MW Primary Fuel Name COAL Plant Must Run (Yes/No) YES

Derated Capacity (MW) Secondary Fuel Name No of Boilers/HRSG

Cold Start Boiler Startup Energy


Available Capacity (MW) 44MW Mixed Fuel (Yes/No) NO
(Mega BTU)

Calorific Value of Primary Fuel


COD (DD/MM/YYYY) Boiler Efficiency Factor (%)
(HHV)

Type of Generation Measuring Unit for Fuel


(GT/DG/STG/NUCLR/WIND/HY STG (Ton/MTON/MCFT/MSCF/KG/Cu TON Combined Cycle (Yes / NO) NO
DRO/SOLR/Others) bit Meter)

GTs STGs DGs

Total No of Generators MBTUs / Unit (kWh) No of Combined Cycle Groups

02 N0

Total No of Station/Unit
02 NO Gross Heat Rate (BTU/kWh)
Transformers

Total No of Auxilliary
05 N0 Net Heat Rate (BTU/kWh)
Transformers.

02 NO GCB(11KV) Total Auxiliary Consumption


Total No of Circuit Breakers. 6MW
5 NO SF6 (132KV) (kWh)
INFORMATION PLAN FOR NETWORK & GENERATION EQUIPMENTS
B-1. Unit Wise Details (Generators Section)
Measurement
Type Unit#1 Unit#2 Unit#3 Unit#4 Unit#5 Unit#6 Unit#7 Unit#8 Unit#9 Unit#10
Unit
Minimum (MW)
Operable Capacity
Maximum (MW)
Load Frequency Control (LFC) Minimum (MW)
Reference Maximum (MW)
Minimum (MW)
Economic Reference
Maximum (MW)
Offline Threshold
Minimum (MW)
(%age of Max Capacity)
Offline Threshold Deadband (%age of
Maximum (MW)
offline Limit)

Maximum Spin Reserve MW

Maximum Contribution MW

Frequency Deadband HZ

UP Windup Limit MW

Down Windup Limit MW

Startup Ramp MW/Min

Time Decay Constant for Startup Cost Hours

Cold Start Turbine Startup Energy Mega BTU

Per Startup
Maintenance Cost Per MWH
Per Hour
Peaker Unit Yes/No
Up Equals Down Yes /No
Short Equals Nominal Yes/No
Maximum MW Exchange using Short UP
Term Ramp Rate (MW) Down
Default Nominal MSR (Maximum UP
Sustained Rate) MW/Min Down
UP
Short Term Ramp Rate (MW/Min)
Down
Sox
Percentage (%) Scrubbed Out by Unit Nox
CO2
INFORMATION PLAN FOR NETWORK & GENERATION EQUIPMENTS
B-1. Unit Wise Details (Generators Section)
Measurement
Type Unit#1 Unit#2 Unit#3 Unit#4 Unit#5 Unit#6 Unit#7 Unit#8 Unit#9 Unit#10
Unit
Unit Type ST/GT/DG STG STG NIL NIL NIL NIL NIL NIL NIL NIL

Standard / Accuracy Class

Rated MVA MVA 31.25 31.25

Nominal Voltage kV 11 11

Nominal Current AMPs 1640 1640

Damping Coefficient P.U MW/P.U Freq

Base MW (Pbse) MW

Min Real Power Output of Unit MW

Maximum Real Power Output of Unit MW

MVAR Min MVAR

MVAR Max MVAR

Upward Ramp Rate Limit MW/Min

Downard Ramp Rate Limit MW/Min

Transient reactance 100MVA Base %age 16.20% 16.20%

Sub-Transient Reactance 100 MVA Base %age 10.30% 10.30%

Zero Sequence Reactance 100 MVA


%age 6.40% 6.40%
Base

Inertia Constant
(Per Unit: MW-Sec/mva) When MW-Sec/MVA
Operating as Genrator--Inertia Gen.

Sub-Transient Reactance for a unit on


%age
100 MVA Base -- Inertia Sync

Inertia Constant (Per Unit: MW-Sec/mva)


Sequence reactance for a unit on 100 %age
MVA base

Winding Connection Type Y Y


INFORMATION PLAN FOR NETWORK & GENERATION EQUIPMENTS
C-1. Transmission Lines (500/220/132 kV)
Measurement
Type Line # 1 Line # 2 Line # 3 Line # 4 Line # 5 Line # 6
Unit
Line From (Station Name) - CFPP switchyard
Line To ( Station Name) - ABC Switchyard
Circuit Number - ABC-10 ABC-11
Voltage Level KV 132 132

Conductor Type - LYNX LYNX


Current Carrying Capacity Amps
No of Bundles - 1 N0. 1 No.
Measured Used CT Ratio - 300/1A 300/1A
Nominal Current Amps
Length of Line Kilometers 3.5KM 3.5KM
Surge Impedance Loading (SIL) MW
Number of Towers - 17 17

Value -

Positive Sequence
Line Resistance Explained in (1) -
(1) = Possible
expression units are : %
B(MVA) if value expressed in % at B
at B(MVA) Base, ohm, -
miliohm. Base
(2) = Possible
expression units are the Value -
same as for LNRES data
if it is a classical line it Line Reactance Explained in (2) -
is a series reactance,
they are : ohm, mohm,
B(MVA) if value expressed in % at B
MVAR, milihenry (mH), -
ampere (A) Base
(3) = Possible
expression units are: Value -
%/km at a B (MVA) base,
micro S/kM, nanofarad Line Susceptance Explained in (3) -
(nF)/kM, MVAR/kM
B(MVA) if value expressed in % at B
-
Base

Value -

Zero Sequence Line Resistance Explained in (4) -


(4) = Possible
expression units are : % B(MVA) if value expressed in % at B
at B(MVA) Base, ohm, -
miliohm.
Base
(5) = Possible
expression units are the Value -
same as for LNRES data
if it is a classical line it Line Reactance Explained in (5) -
is a series reactance,
they are : ohm, mohm,
MVAR, milihenry (mH), B(MVA) if value expressed in % at B
-
ampere (A) Base
(6) = Possible
expression units are: Value -
%/km at a B (MVA) base,
micro S/kM, nanofarad
(nF)/kM, MVAR/kM Line Susceptance Explained in (6) -

B(MVA) if value expressed in % at B


-
Base
INFORMATION PLAN FOR NETWORK & GENERATION EQUIPMENTS
D-1. All Transformers Data
Type Transfo#1 Transfo#2 Transfo#3 Transfo#4 Transfo#5 Transfo#6 Transfo#7 Transfo#8 Transfo#9 Transfo#10
Transformer ID/Make/Year
Standard/Class
Rated Power Respect to
Cooling Methods
Rated MVA(3-Phase)
Primary Voltage Level

Secondary Voltage Level

Vector Group

No. of Taps

Rated Max. Current


Respect to Cooling Method

UCC % (Short Circuit impedence in terms


of %age on 100 MVA base and base voltage
with respect to Max,Nominal and Min.
Voltage Tap Position)

Unomfix (Nominal fix


voltage at low voltage side)

Ucc Base (MVA)

No load Excitation current


respect to %age rating current

No load Current (3 Phase)


Total Iron losses/core losses/no load
losses 3Phase
(From open circuit test)
Total Copper Losses/Winding Losses/Load
Losses 3 Phase (From Short Circuit Test)

Total Iron losses/core losses/no load


losses 1Phase (From open circuit test)

Total Copper Losses/Winding Losses/Load


Losses 1 Phase (From Short Circuit Test)

Losses Base
Table of current & Voltage
respect to Tap Positions
Nominal Tap Position
Minimum Tap Position
Maximum Tap Position
Type of Tap Changer
%age Tap Changer

Per unit Step size of each tap changer

No of Taps
Nominal Current (AMPS)
Measured Used CT (A)
INFORMATION PLAN FOR NETWORK & GENERATION EQUIPMENTS
D-2. Transformers (3 Winding Transformer Data, Pi Model)
Measurement
Type Transfo#1 Transfo#2 Transfo#3 Transfo#4 Transfo#5 Transfo#6 Transfo#7 Transfo#8 Transfo#9 Transfor#10
Unit
Value -
1-2 Winding
B(MVA) -
Reactance
U base (kV) -
Value -
1-3 Winding
B(MVA) -
Reactance
U base (kV) -
Value -
2-3 Winding
B(MVA) -
Reactance
U base (kV) -
D-3. Short Circuit Data
Winding Contact Type -
Grounding Resistance -
Primary Grounding Reactance -
Grounding Type -
No. of Transformer -
Winding Contact Type -
Grounding Resistance -
Secondary Grounding Reactance -
Grounding Type -
No. of Transformer -
Winding Contact Type -
Grounding Resistance -
Tertiary Grounding Reactance -
Grounding Type -
No. of Transformer -

D-4. Tap Operation at LTC Side


Nominal Voltage (KV) -

Nominal Tap No -

Minimal Tap No -

Voltage of Minimum Tap -

Number of Taps over/under Nominal Voltage -

Step Size (%) Over Nominal Voltage -

Step Size (%) Under Nominal Voltage -


INFORMATION PLAN FOR NETWORK & GENERATION EQUIPMENTS
D-5. Transformers (2 Winding Transformer Data, Pi Model)
Measurement
Type Transfo#1 Transfo#2 Transfo#3 Transfo#4 Transfo#5 Transfo#6 Transfo#7 Transfo#8 Transfo#9 Transfor#10
Unit
VALUE -
Series Resistance B(MVA) -
U base (kV) -
Value -
Series Reactance B(MVA) -
U base (kV) -
Value -
Shunt Mag.
B(MVA) -
Conductance
U base (kV) -
Value -
Shunt Mag.
B(MVA) -
Suseptance
U base (kV) -
Nominal Voltage (kV) -
D-6. Short Circuit Data
Primary Winding Contact Type -
Primary Grounding Resistance -
LTC SIDE Primary Grounding Reactance -
Primary Grounding Type -
No. of Transformers -
Secondary Winding Contact Type -
Secondary Grounding Resistance -
FIXED SIDE Secondary Grounding Reactance -
Secondary Grounding Type -
No. of Transformers -
D-7. Tap Position at LTC Side (H.T Side)
Nominal Tap No -

Minimal Tap No -

Voltage at Minimum Tap -

Number of Taps over Nominal Voltage -

Step Size (%) Over nominal Voltage -

Number of Taps under Nominal Voltage -

Step Size (%) Under Nominal Voltage -


INFORMATION PLAN FOR NETWORK & GENERATION EQUIPMENTS
E-1. All Circuit Breakers.
Type Measurement Unit CB#1 CB#2 CB#3 CB#4 CB#5 CB#6 CB#7 CB#8 CB#9 CB#10

Block ID -

Voltage Level kV

Open
Nomral Status
Close

Rating (Amps)
Asymmetrical Faults
Short Circuit Analysis
Rating (Amps)
Symmetrical Faults

Rated Impulse Standing Voltage -

Rated Normal Current -

F-1. All Shunt Reactors


Type Measurement Unit SR#1 SR#2 SR#3 SR#4 SR#5 SR#6 SR#7 SR#8 SR#9 SR#10

Shunt Reactor ID -

Shunt Reactor Type -

MVAR Nominal -
MW LEVEL OF THE TYPE OF
INCREMENTAL HEAT RATE
NUMBER OF POINTS HEAT ATCURVE
FIRST POINT HEAT RATE POINT NUMBER OF GENERATION
(MBTU FOR GIVEN MWH
STATION/ PLANT (THE FIRST POINT GENERATORS THAT
GENERATOR NAME FOR HEAT RATE FOR GIVEN MW LEVEL)
NAME MUST BE ZERO) CAN START (GT/ ST/ DG/
CURVES (MBTU/HOUR) SIMULTANOUSLY NUCLEAR/ HYDRO/
MBTU/ MWH
MW WIND/ SOLAR)

UNIT NO. 1

UNIT NO. 2

UNIT NO. 3

UNIT NO. 4

UNIT NO. 5

UNIT NO. 6

UNIT NO. 7

UNIT NO. 8

UNIT NO. 9

UNIT NO. 10

UNIT NO. 11

UNIT NO. 12

UNIT NO. 13

UNIT NO. 14

……..
UNIT/GENERATOR SPECIFIC DATA

TYPE OF FUEL
NUMBER OF FUELS MEASURE UNIT OF CALORIFIC VALUE
FO/ RFO/ HFO/ COST PER FUEL FUEL EFFICIENCY
STATION/ PLANT FUEL OF FUEL NOX PRODUCED BY
GENERATOR NAME RSFO/ COAL/ GAS/ UNIT
NAME (if unit/ plant is (TONS, MCF, MBTUs PER FUEL FUEL UNIT
HYDRO/ NUCLEAR/ (PKR.) % AGE
mutifuel) BARRELS ETC) UNIT
WIND/ SOLAR/
BAGGASE

UNIT NO. 1

UNIT NO. 2

UNIT NO. 3

UNIT NO. 4

UNIT NO. 5

UNIT NO. 6

UNIT NO. 7

UNIT NO. 8

UNIT NO. 9

UNIT NO. 10

UNIT NO. 11

UNIT NO. 12

UNIT NO. 13

UNIT NO. 14

……..
ECIFIC DATA

NUMBER OF
FORBIDDEN ZONES (SOME UNITSZONES
FORBIDDEN FORBIDDEN ZONE FORBIDDEN ZONE FORBIDDEN ZONE
STATION/ PLANT GENERATOR NAME SO2FUEL
PRODUCED BY CO2 PRODUCED BY HAVE ID NUMBER MINIMUM LIMIT MAXIMUM LIMIT
NAME UNIT FUEL UNIT (YES/NO) MORE THAN 1 E.G. FZ 1, FZ 2 ETC MW MW
FORBIDDEN ZONES)

UNIT NO. 1

UNIT NO. 2

UNIT NO. 3

UNIT NO. 4

UNIT NO. 5

UNIT NO. 6

UNIT NO. 7

UNIT NO. 8

UNIT NO. 9

UNIT NO. 10

UNIT NO. 11

UNIT NO. 12

UNIT NO. 13

UNIT NO. 14

……..
Minimum Time
STATION/ PLANT Between Forbidden
GENERATOR NAME
NAME Zone Crossing
(in Seconds)

UNIT NO. 1

UNIT NO. 2

UNIT NO. 3

UNIT NO. 4

UNIT NO. 5

UNIT NO. 6

UNIT NO. 7

UNIT NO. 8

UNIT NO. 9

UNIT NO. 10

UNIT NO. 11

UNIT NO. 12

UNIT NO. 13

UNIT NO. 14

……..
UNIT DATA

OPERABLE OPERABLE
UNIT CURRENT Load Frequency Load Frequency ECONOMIC ECONOMIC
STATION/ PLANT GENERATOR NAME CAPACITY CAPACITY
CAPACITY Control MINIMUM Control MAXIMUM MINIMUM MAXIMUM
NAME MINIMUM MAXIMUM
(MW) (MW) (MW) (MW) (MW)
(MW) (MW)

UNIT NO. 1

UNIT NO. 2

UNIT NO. 3

UNIT NO. 4

UNIT NO. 5

UNIT NO. 6

UNIT NO. 7

UNIT NO. 8

UNIT NO. 9

UNIT NO. 10

UNIT NO. 11

UNIT NO. 12

UNIT NO. 13

UNIT NO. 14

……..
UNIT DATA

UNIT OFFLINE UNIT OFFLINE


THRESHOLD THRESHOLD MAX CONTRIBUTION
(IN % AGE OF DEADBAND MAX SPINNING
STATION/ PLANT GENERATOR NAME OF THE UNIT TO NON- UNIT FREQUENCY DEADBAND UP WIND UP LIMIT
MAXIMUM (IN % AGE OF RESERVE
NAME SPINNING RESERVE
CAPACITY) OFFLINE LIMIT) (MW) HZ MW
(MW)
MW MW

UNIT NO. 1

UNIT NO. 2

UNIT NO. 3

UNIT NO. 4

UNIT NO. 5

UNIT NO. 6

UNIT NO. 7

UNIT NO. 8

UNIT NO. 9

UNIT NO. 10

UNIT NO. 11

UNIT NO. 12

UNIT NO. 13

UNIT NO. 14

……..
UNIT DATA

SYNCHRONOUS SYNCHRONOUS SYNCHRONOUS PUMPING


PUMP BACK CONDENSER CONDENSER CONDENSER
DOWN WIND UP PUMP BACK (MAXIMUM
STATION/ PLANT GENERATOR NAME LIMIT LIMITS OPERATING )
UNIT CAN OPERATE UNIT CAN MW THRESHHOLD FOR MVAR THRESHHOLD
NAME (MW) RESERVE
AS A PUMP OPERATE AS A SYNCHRONOUS FOR SYNCHRONOUS OBTAINABLE
MW FROM A
(Yes/No) CONDENSER CONDENSER CONDENSER UNIT OPERATING
(Yes/No) DETECTION DETECTION

UNIT NO. 1

UNIT NO. 2

UNIT NO. 3

UNIT NO. 4

UNIT NO. 5

UNIT NO. 6

UNIT NO. 7

UNIT NO. 8

UNIT NO. 9

UNIT NO. 10

UNIT NO. 11

UNIT NO. 12

UNIT NO. 13

UNIT NO. 14

……..
ATA UNIT DATA

SYNCHING SPINNING TIME DECAY


RESERVE(MAXIMUM UNIT UNIT STARTUP CONSTANT OF TURBINE STARTUP
UNIT MINIMUM MINIMUM
SPINNING RESERVE (MBTU) COLD START BOILER
STATION/ PLANT GENERATOR NAME UP HOURS RAMP RATE BOILER FOR
OBTAINABLE FROM A DOWN HOURS (COLD START START UP
NAME (before STARTUP COST TURBINE START UP ENERGY(MBTU)
UNIT OPERATING AS A (before
shutdown) MW/MIN
SYNCHRONOUS startup) ENERGY)
HOURS
CONDENSOR)

UNIT NO. 1

UNIT NO. 2

UNIT NO. 3

UNIT NO. 4

UNIT NO. 5

UNIT NO. 6

UNIT NO. 7

UNIT NO. 8

UNIT NO. 9

UNIT NO. 10

UNIT NO. 11

UNIT NO. 12

UNIT NO. 13

UNIT NO. 14

……..
UNIT DATA U

MAINTENANCE MAINTENANCE MAINTENANCE


COSTS COSTS COSTS MAX MW CHANGE USING SHORT
STATION/ PLANT GENERATOR NAME BOILER PUMPING COST TERM RAMP RATE
NAME EFIICIENCY(%) PER STARTUP PER MWH PER HOUR (MW/MIN)
PKR. PKR. PKR.

UP (MW) DOWN (MW)


UNIT NO. 1

UNIT NO. 2

UNIT NO. 3

UNIT NO. 4

UNIT NO. 5

UNIT NO. 6

UNIT NO. 7

UNIT NO. 8

UNIT NO. 9

UNIT NO. 10

UNIT NO. 11

UNIT NO. 12

UNIT NO. 13

UNIT NO. 14

……..
UNIT DATA UNIT DATA

DEFAULT NOMINAL MAXIMUM UNIT LIMIT ALARMS SCRUB OUT SCRUB OUT
STATION/ PLANT GENERATOR NAME SHORT TERM RAMP RATE
SUSTAINED RATES DEADBAND % AGE OF NITROUS % AGE OF SULPHUR
NAME (MW/MIN)
(MW/MIN) (AGC ONLY) DIOXIDE OXIDE

UP (MW) DOWN (MW) UP (MW) DOWN (MW)


UNIT NO. 1

UNIT NO. 2

UNIT NO. 3

UNIT NO. 4

UNIT NO. 5

UNIT NO. 6

UNIT NO. 7

UNIT NO. 8

UNIT NO. 9

UNIT NO. 10

UNIT NO. 11

UNIT NO. 12

UNIT NO. 13

UNIT NO. 14

……..
UNIT DATA

SCRUB OUT
STATION/ PLANT GENERATOR NAME % AGE OF CARBON
NAME DIOXIDE

UNIT NO. 1

UNIT NO. 2

UNIT NO. 3

UNIT NO. 4

UNIT NO. 5

UNIT NO. 6

UNIT NO. 7

UNIT NO. 8

UNIT NO. 9

UNIT NO. 10

UNIT NO. 11

UNIT NO. 12

UNIT NO. 13

UNIT NO. 14

……..
UNIT PLC DATA, RELATED TO AGC

MAXIMUM RAISE/ MINIMUM RAISE/


TYPE OF CONTROL PULSE
STATION/ PLANT GENERATOR REGULATION PARTICIAPTION LOWER PULSE LOWER PULSE SETPOINT
(SETPOINT OR DISCRETIZATION
NAME NAME PRIORITY FACTOR LENGTH LENGTH FEEDBACK BIAS
PULSE CONTROL) FACTOR (IN SECONDS) (IN SECONDS)

UNIT NO. 1

UNIT NO. 2

UNIT NO. 3

UNIT NO. 4

UNIT NO. 5

UNIT NO. 6

UNIT NO. 7

UNIT NO. 8

UNIT NO. 9

UNIT NO. 10

UNIT NO. 11

UNIT NO. 12

UNIT NO. 13

UNIT NO. 14

……..
UNIT PLC DATA, RELATED TO AGC

FREQUNCY BIAS
SETPOINT SIGNAL UNIT RESPONSE SETTING TIME FOR PLC TO BUILD BOILER PENDING MW
STATION/ PLANT GENERATOR DEADBAND TIME CONSTANT (MW/0.1Hz) ENERGY WEIGHING
NAME NAME (MW) (SECONDS) (TYPICALLY 3.3 % OF (SECONDS) FACTOR
CAPACITY)

UP DOWN
UNIT NO. 1

UNIT NO. 2

UNIT NO. 3

UNIT NO. 4

UNIT NO. 5

UNIT NO. 6

UNIT NO. 7

UNIT NO. 8

UNIT NO. 9

UNIT NO. 10

UNIT NO. 11

UNIT NO. 12

UNIT NO. 13

UNIT NO. 14

……..
UNIT PLC DATA, RELATED TO AGC

STATION/ PLANT GENERATOR DELAY ERROR DEAD GAIN GAIN


KNEE POINT PENDING GAIN
NAME NAME (SECONDS) BAND K1 K2

UNIT NO. 1

UNIT NO. 2

UNIT NO. 3

UNIT NO. 4

UNIT NO. 5

UNIT NO. 6

UNIT NO. 7

UNIT NO. 8

UNIT NO. 9

UNIT NO. 10

UNIT NO. 11

UNIT NO. 12

UNIT NO. 13

UNIT NO. 14

……..
PLC PULSE CALIBRATION TABLE

MW CHANGE PER MW CHANGE PER


RAISE PULSE LOWER PULSE
STATION/ PLANT GENERATOR RAISE RAISE LOWER LOWER
NAME NAME HIGH LIMIT LOW LIMIT HIGH LIMIT LOW LIMIT
MW/ 1 SECOND MW/ 1 SECOND
PULSE PULSE

UNIT NO. 1

UNIT NO. 2

UNIT NO. 3

UNIT NO. 4

UNIT NO. 5

UNIT NO. 6

UNIT NO. 7

UNIT NO. 8

UNIT NO. 9

UNIT NO. 10

UNIT NO. 11

UNIT NO. 12

UNIT NO. 13

UNIT NO. 14

……..
UNIT DATA
1 2 3 4 5 6 7 8 9

Derated Derated Derated Derated Derated Economic Initial MW


Current
Unit No. Economic Economic LFC LFC Current Dispatch Unit Type (Just after
Capacity
Minimum Maximum Minimum Maximum Capacity Ramp Synchronization)

GT/ ST/ Nuclear/ Hydro/


MW MW MW MW MW MW MW/Hour MW
DG/ Wind/ Solar

10

..... And so
on for all
Units

Notes:
1. ECONOMIC MINMUM OF A UNIT MAY DIFFER FROM LFC MINIMUM. ECONOMIC MINMUM OF A UNIT IS THE MINIMUM MW OF A GENERATOR AT WHICH THE OUTPUT ENERGY IS MOST ECONOMICAL.
2. SAME AS ECONOMIC MINIMUM BUT IN THE UPWARD MAXIMUM SIDE.
3. LFC MINIMUM IS THE MINIMUM MW LEVEL OF A MACHINE FOR LOAD FREQUENCY CONTROL. IT IS DIFFERENT FROM ECONOMIC MINIMUM. FOR EXAMPLE
Derated Derated
CAPACITY Economic Economic Derated LFC Derated LFC
Minimum Maximum
Minimum Maximum
UNIT NO. 1 350 150 320 70 350

4. SAME AS LFC MINIMUM BUT IN THE UPWARD MAXIMUM SIDE.


7. SOME UNITS HAS FAST RAMP RATE BUT IT IS NOT MOST ECONOMIC RAMP RATE. NOMINAL ECONOMIC DISPATCH RAMP RATE IN MW/ HOUR OR MW/ MIN IS REQUIRED.
9. WHEN THE UNIT JUST COME ON BUS BAR OR JUST SYNCHRONIZED, INITIAL MW VALUE IS REQUIRED.
UNIT STARTUP DATA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Warm Cold Hot Warm Cold Hot to Hot to Boiler Shutdown


Hot Startup Startup Startup Startup Startup Shutdown Startup Maximum
Unit No. Startup Startup Warm Cold Heat Base Decay Down Bank
Cost Heat Heat Heat Ramp Rate Ramp Rate Bank Time Starts Per Day
Cost Cost Required Required Required Time Time Time Time

Rs. Rs. Rs. MBTU MBTU MBTU Hours Hours MBTU/Hour Hours MW/Hour MW/Hour Hours Hours No. of starts
1
2
3
4
5
6
7
8
9
10
..... And so
on for all
Units

NOTES:
Unit Daily Energy Limits, If any
1 2
Maximum Unit Minimum Unit
Unit No. Energy Energy
MWH MWh
1
2
3
4
5
6
7
8
9
10
..... And so
on for all
Units

NOTES:
1. IF GENERATING UNIT HAS ANY MAXIMUM DAILY ENERGY LIMIT AS PER CONTRACT/ PPA, MENTION IT.
2. IF GENERATING UNIT HAS ANY MINIMUM DAILY ENERGY LIMIT AS PER CONTRACT/ PPA, MENTION IT.
UNIT HEAT RATE CURVES DATA
1 2 3 4 5 6 7
For Combined Cycle Plants Only

Fuel

Note: For multi fuel


Unit No. units, provide Heat Heat Rate MW Heat Rate Unit Input Combined Cycle ST Combined Cycle ST
Rate curve for each Output Curve Input MW Output MW
Fuel for each Unit
Separetly

Gas/ RFO/ HSD/


Nuclear/ LSFO/ MW MBTU/ MWh MBTU/ Hour MW MW
Baggase/ Coal etc
1 0%
25%
50%
75%
100%

2 0%
25%
50%
75%
100%

3 0%
25%
50%
75%
100%

..... And so
on for all
Units

NOTES:
6. A COMBINED CYCLE STEAM TURBINE GIVES A PARTICULAR OUTPUT MW AGAINST SPECIFIC TOTAL MW OF ITS CONTROLLING GTs OR CTs.
7. OUTPUT MW OF A COMBINED CYCLE ST FOR A GIVEN INPUT MW OF ITS CONTROLLING GTs OR CTs.
FOR EXAMPLE: A COMBINED CYCLE POWER PLANT HAS 2 GTs AND 1 ST IN 2+1 CONFIGURATION

GT 1 + GT 2
TOTAL MW
ST MW MW vs MW CURVE OF A COMBINED CYCLE POWER PLANT
OUTPUT
INPUT
140
0 0
120
50 25
100
100 50
ST MW OUTPUT

150 75 80 ST MW
60 OUTPUT
200 100
250 125 40
20
0
0 50 100 150 200 250
GT-1 + GT-2 INPUT MW
UNIT FORBIDDEN ZONES
1 2 3 4 5
At Minimum Head At Maximum Head
Forbidden Forbidden Forbidden Forbidden
Unit No. Number of Zone Zone Zone Zone
Forbidden Zones Low High Low High

For more than One


Forbidden Zones,
Provide data for all MW MW MW MW
Forbidden Zones

1
2
3
4
5
6
7
8
9
10
..... And so
on for all
Units

Notes:
1. If a generating unit has more than one Forbidden Zones, mention the total number of forbidden zones and provide dat for each forbidden zone separately.
2. Lower MW value of Forbidden zone at minimum head.
3. Upper MW value of Forbidden zone at minimum head.
4. Lower MW value of Forbidden zone at maximum head.
5. Upper MW value of Forbidden zone at maximum head.
JOINTLY OWNED UNIT DATA JOU TELEMETERY

NAME OF THE RELATIVE PENALTY FACTOR SHARE UNIT SHARE UNIT


JOINTLY OWNED INTERNAL JOINTLY IS THIS UNIT OR PLC OPERATIONAL SHARE UNIT SHARE UNIT SHARE UNIT
STATION/ PLANT GENERATOR NAME UNIT OWNED UNIT NON PHYSCIAL AREA(OPA) that PLANT NAME IN PARTICIPATION OF USED TO ACCOUNT HIGH LIMIT LOW ON/OFF AT HIGH LIMIT AT LOW LIMIT
NAME (Y/N) (Y/N) (Y/N) OWNS THE EXTERNAL OPA EACH SHARE IN THE FOR LOSSES FROM (Y/N) LIMIT(Y/N) STATUS(Y/N) STATUS AT THE STATUS AT THE
PHYSICALLY JOU UNIT GEN TO TIE TIE (Y/N) TIE(Y/N)
PARTICULAR SHARE

You might also like