The document is a summary of work completed and associated costs across 5 line items for a construction project. It shows the planned quantity and rate, actual quantity completed in the field, and resulting amounts for each work item. The total planned amount was blank since work was not fully estimated initially, while the total actual amount came to over 1.9 million rupees including VAT.
The document is a summary of work completed and associated costs across 5 line items for a construction project. It shows the planned quantity and rate, actual quantity completed in the field, and resulting amounts for each work item. The total planned amount was blank since work was not fully estimated initially, while the total actual amount came to over 1.9 million rupees including VAT.
The document is a summary of work completed and associated costs across 5 line items for a construction project. It shows the planned quantity and rate, actual quantity completed in the field, and resulting amounts for each work item. The total planned amount was blank since work was not fully estimated initially, while the total actual amount came to over 1.9 million rupees including VAT.
1 Prefab Work Sq. Feet 400 - 2249.91 400 899,964.00 we constructed a wall of 1m height so as to support the post
The quantity was more as
2 False Ceiling Sq. Feet 115 - 3436.59 115 395,207.85 we have increased the area of false celling work. We have used false celling in the end portion also which was not planned before.
The quantity is less as we
3 Cement Board Sq. Feet 159.29 - 406.87 159.29 64,810.32 didn’t use cement board rather we used false celling in place of this 4 Steel Work Kg 123.89 - 2641 123.89 327,193.49 Contract 2 page 1 Contract 1 page 1 Rate of 5 7’x3’ metal door Pc 11025 - 1 11025 11,025.00 a door is 11025 and per Sq ft is 525 Total - Total 1,698,200.66 Vat - Vat 220,766.09 Grand Total - Grand Total 1,918,966.75