Professional Documents
Culture Documents
Lansangan - Robbie Multiphase Flow Measurement CPMA 20.3
Lansangan - Robbie Multiphase Flow Measurement CPMA 20.3
CPMA 20.3
50%
40%
30%
+/ - Uncert aint y
20%
cu t
70% w at er
Uncert aint y
Gas M easurem ent
Specificat ions Uncert aint y
Reservoir/ Well Increasing net oil uncert ainty w it h
10%
M anagem ent increasing w at er cut er c u t
0% w at
Fiscal 5%
Allocat ion Oil M easurem ent uncert aint y (best case)
0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0
Based on laborat ory t est s and field t rials w it h rigorous vendor set -up, m et er configurat ion and cont rol
SS MFPM Considerations
• Location
– XT, manifold, standalone structure
• Retrievability
• Power & comms
• Calibration
• Performance verification
• Maintenance & sustainability requirements
• Organizational capability
• Qualification – performance and reliability
• Can a single phase meter do the job?
In Summary
• Multiphase flow measurement is an inevitable
part of the business – it is complex but
fundamentally sound
• CAVEAT EMPTOR
– Know what you are getting
• QUESTIONS?