Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 26

A PROJECT FEASIBILITY STUDY ON THE ESTABLISHMENT OF

CAMPO DE KAMALIG LODGING HUTS

By:

MARYNEL C. AGULO

BENA B. JAGONOB

JOVY KATE C. JUNIO

KRISZLE E. LAGING

LEO ANGELO S. PALOA

RIZAOLAN P. RAPAN

A Feasibility Study Presented to the College of Business and Faculty in Partial

Fulfillment of the Requirements for the Course

MGMT. 38 -MANAGEMENT CONSULTANCIES WITH BUSINESS

RESEARCH

Notre Dame of Midsayap College


College of Business and Accountancy

Midsayap, Cotabato

March 2018

CHAPTER I

INTRODUCTION

Most of the people nowadays have a great interest in exploring the beauty of

nature not just those wonders which have already known to most of the people but

also those undiscovered natural wonders in the country. Traveling has undeniably

become the precious time for almost everyone to think, relax, observe and learn new

things as to culture, foods, and history of both the place and the people. One of the

most wonderful chronicles that has brought to the history of North Cotabato is the

majestic Asik-Asik falls. Gushing out from a cliff at the edge of a 200-meter flattened

hill, water crashes down in what seems to be music to the ears of everyone close to it.

Where the water comes from is still a mystery. Many has been attracted to witness

this mysterious-like spot making the Asik-Asik falls the top tourist attraction of
Alamada town in North Cotabato. Thus, the researchers decided to put up nipa huts

named: Campo de Kamalig to accommodate tourists.

It will be established in Sitio Dulao, Dado, Alamada, North Cotabato. The service

would be availed by those tourists who want to spend a night in the area especially

those who had a long way going through the place. Of course, the stay would not be

complete without the Filipino dishes and native delicacies that would also be served

in the dining hall where food stalls are situated. The stalls will be rented by potential

vendors of the locality. The food stall is not only exclusive for those tourists who are

staying but also to anyone who wanted to satisfy their cravings.

PROJECT OBJECTIVES

This feasibility study looks forward to aim the following objectives:

 To be able to find effective strategies of increasing the profit of the business

while underrating the cost.

 To satisfy customers by providing best quality service at effective price.


 To be able to formulate the most effective management techniques in operating a

business.

 To provide possible employment.

Significance of the Study

This study entitled “ Feasibility of Establishing Campo de Kamalig”, could be of

help to the following:

The researchers. It will help us gain more knowledge with the needed data and

information that is essential in putting up a business and be familiar with the process

in handling it.

The future researchers. This study could be a good reference to future researchers

who will be involved in this kind of business. And finally, the prospective

investors.The future investors may use this study as a guide and make them realize

that putting up a business like this is feasible.

Scope and Limitations


This study focuses on establishing Campo de Kamalig in Sitio Dulao, Dado,

Alamada, North Cotabato. It will cover the future market which are the foreign and

domestic travellers who will visit Asik-Asik Falls and other tourist spots nearby.

Although the research has reached its aims,there were some unavoidable

limitations. This research was conducted only on a small size of population, therefore

to generalize the results for larger groups and to obtain accurate results, the study

should have involved more participants.

Methodology

The research methodology to be used in conducting this project study is the

descriptive method of research which helps the researcher since this type of research

method concerned with the description of data and characteristics about the

population that provides an accurate portrayal of the characteristics of a particular

individual, situation or a group in a current trend of the operation.

The primary source of data for this study is through distribution and conduction

of questionnaires and surveys from possible travelers who are interested in traveling.

The other sources of data to be used in this study are books, other related research

papers and studies and through the internet.

Type of Business Organization and Proponent


Campo de Kamalig lodging house will be registered as single proprietorship. It

will be managed by Mr. Arguelles as a single proprietor. Mr. Arguelles owns a 1600

sguare meter lot at Sitio Dulao, Dado,Alamada, which will be utilized for the

construction. The expenses in starting up the business will be financed by him. Mr

Arguelles has already a background in managing a restaurant and lodging house

business, so it is a great opportunity for him to expand and make use of his resources.

Vision

Campo de Kamalig lodging house envisions to become a well-known progressing

and accommodating place in the locality of Alamada and province of Cotabato.

Mission

The mission of Campo de Kamalig is to become the foremost lodging house in

the area and nearby municipality. We will attend clients and give quality services at

very reasonable price.

Its economic mission is to operate and grow at a profitable rate through sound

economic decision.

Management and Personnel Study

The business will employ twelve (12) persons in the business, the

house-in-charge, a receptionist, a cashier, a driver, a line cook, two (2) security guards

and five (5) helpers. Duties and responsibilities of each personnel are stated below:

Personal Function and Duties


House-in-charge  Supervises and coordinates activities of workers in the guest’s

house engaged in the accommodation of the guests and serving

meals if needed.

 Supervises helpers engaged in such task as cleaning rooms and

comfort rooms, issuing linens and laundry task.

 Inventory counting and purchase supplies

 Inspecting rooms to make sure that standard have been met

 Coordinates with the receptionist or cashier and check the

financial reports

 Resolves complaints regarding food, accommodation, or service

Receptionist  Deals with bookings by phone, email, letter, or face to face

 Assign in choosing rooms and handing out keys

 Dealing with special requests from guests (bookings or questions

regarding Campo de Kamalig)

 Dealing with complaints or problems


Cashier  Coordinates with the house-in-charge and receptionist

 Preparing bills and collection of payments

 Maintains records of financial transactions and prepares financial

report

 Setting up and stocking stations with all necessary supplies in the


Line Cook
kitchen

 Preparing foods for service

 Cooking menu items in cooperation with the Helper 1

 Ensure that food comes out simultaneously, in high quality and in

a timely fashion

 Maintain a positive and professional approach with customers

 Coordinates with the Line Cook


Helper 1
 In charge of buying groceries

 Answer, report and follow the Line Cook instructions

 Clean up station and take care of leftover food

 Serve and deliver the ordered meals

 In charge of washing dishes

Helper 2  Coordinates with the receptionist and cashier.


 In charge of assisting guests to their respective rooms

 Follow-ups the necessary requests of the customers

 In charge of checking and requesting supplies (pillows, blankets,

bath towels, etc.)

Helpers 3, 4 & 5  In charge of maintaining cleanliness of the whole area

 In charge of washing and changing the bed sheets, pillow cases

and curtains

 In charge of checking and cleaning each hut

 In charge in washing the rugs and cleaning the floor and

bathrooms

 In charge of cutting grasses within the area

 Assigned in collecting and disposing garbage

 In charge of necessary repairs in equipments and machineries


Driver
 Must be present in times of need such as emergency concerns

 Accompanies the helper 1 in buying kitchen supplies

 Complete daily maintenance checks on deliveries and notify


manager of any issues

 In charge to check each in every vehicles before entering the


Security Guard 1
facility

 Patrolling in hallways, parking lots, lobbies and surroundings

 Must watch for unusual, illegal or dangerous activities on the

premises

 In charge near in the reception area


Security Guard 2
 Warn violators of rule infraction, such as loitering, smoking and

bringing weapons inside the premises

 Provide assistance to customers, employees and visitor in a

courteous and professional manner

C. Profiles and Qualifications

 Must have at least a high school diploma or an undergraduate


House-in-charge degree in hotel management, hospitality or business.

 Have an experience, such as three to four years working in a hotel

management job position

 Must have flexible time schedules, as they may be required to

work irregular hours.

 Possesses pleasant personalities and have a good communication

skills

 Must be a high school graduate or equivalent


Receptionist/
 Must have an experience in previous hotel-related experience
Cashier
desired especially in operating hotel front office software.

 Must have flexible time schedules, as they may be required to

work irregular hours.

 Possesses pleasant personalities and have a good communication

skills

 Must present his/her high school diploma


Line Cook
 Either male/female at least 25-35 years of age

 Must have at least 4 years’ cooking and kitchen administration

experience

 Comfortable working with a team in a fast-paced kitchen

environment
 Must be a female at least 20-35 years of age
Helper 1
 Must have at least 1-2 years experience in assisting inside the

kitchen

Helpers 2, 3, 4  Must have at least 25-35 years of age

and 5  Must be punctual and diligent in every job assigned

 Must be a Male and at least 20-35 years old


Driver
 Must completed the driving license and paper documents

 Minimum of one year verifiable and successful driving

experience

 Must be a Male and at least 20-35 years old


Security Guard 1
 Minimum of one year verifiable and successful security
and 2
experience

 You must be able to work flexible schedules and respond to work

assignments with little to no advance notice


MARKET STUDY

A. Product/Service

The proposed project will be introduced with a business name: Campo de

Kamalig .The business name is based on the purpose of the business to provide a

cheaper and comfortable accommodation for all the travellers who would like to visit

Asik-Asik falls.

Price

The accommodation price will be based on the commercial rate of lodging houses

nearby the municipality.

The prices of each room vary as follows:

Room Type Price

Family Room ( 5-8 persons) P750.00


Twin Room ( 3-4 persons) P600.00

Single Room ( 1-2 persons) P375.00

Promotion

The business will make use of “word of mouth”, social media promotion and

noticeable print advertisements.

Place

The proposed business would be located near the Asik-Asik Falls of Sitio Dulao,

Dado- Municipality of Alamada. The business could benefit from the choice of its

location because the location itself attracts the tourists.

B. Market Size and Trends

C. Target Market Area and Selection

D.Customer Analysis

E. Industry Overview and Characteristics

F. Market Potential and Opportunities


G. Demand and Supply Analyses

Estimation of Present Demand

Based on the survey conducted by the proponents, the summary of present

demand arrived as shown in table 1. A total of 26 out of 35 respondents or estimated

74% of the population size are willing to stay in a nipa huts. Nine of the respondents

or 26% of the population size are not interested or prefers to go at another tourist

destination

Target Market

14%

86%

Willing to visit Asik-Asik Not interested

Projection of Future Demand


Market Present Estimated Estimated Percentage Projected

Demand Increase Increase of Demand

Estimated (Year
(Year 1) (Year 2) (Year 3)
Increase 1+Year

2+Year 3)

Visitors

H. SWOT Analysis

I. Strategies and Approaches

J. Risks and Challenges

A review of the 2015-2017 data of Asik-Asik visitors which was taken from the Local

Government Unit of Alamada showed that tourist count has a steady increase of

6.85% from 2015 to 2017.


TABLE 1. VISITOR ARRIVALS AT ASIK-ASIK FALLS

YEAR

MONTH

2017 2016 2015

JANUARY 621 503 485

FEBRUARY 157 118 102

MARCH 419 392 406

APRIL 518 498 511

MAY 874 702 651

JUNE 370 353 237

JULY 175 209 115

AUGUST 106 141 119

SEPTEMBER 309 239 283

OCTOBER 562 483 239

NOVEMBER 417 403 394

DECEMBER 1103 1260 1027

TOTAL 5631 5301 4569

GRAND TOTAL 15 501

TECHNICAL ANALYSIS
A. Description of Operation and Process

The lodging house will have ten (10) rooms which will accommodate a maximum

of forty-two(42) persons. The two rooms that can accommodate 5-8 persons each will

be called family room and will cost P750 each room. The three rooms that can

accommodate 1-2 persons each will be called single room and will cost P375 each

room. Whereas the five rooms that can accommodate 3-4 persons each will be called

twin room and will cost P600 each room. Payments can be made through cash.

Reservations can be made through phone calls and through websites where the

nipa huts is registered. Walk-in guest can be entertained if there is an available room

for them.

Checking out will be made every twelve o’clock in the afternoon. Keys from the

room will be surrendered upon checking out. Linen will be washed on every bed after

the guest leaves.

The house will have two showers and two CR’s for male and female guests for

their privacy. Travelers can give their important documents to the receptionist for

safe keeping.
Aside from providing rooms for the guests, the house will provide free water for

the travelers. Guests will have free beddings. Laundry service can be accommodated

for the guests.

Guests are not encouraged to eat inside the rooms. Dining areas are provided for

the guest for them to eat their meals. Spaces for verandas and small living areas for

the travelers to mingle or to get acquainted with each other are provided. Silence is

required inside the room to keep a peaceful atmosphere and allow the travelers to

have a restful sleep.

B. Project Location

The proposed location of the project would be at Sitio Dulao,Dado, Alamada,

North Cotabato. It is located in a residential lot measuring 1800 square meters, atop

the hill overlooking the majestic view of the falls and green vast of lands.

C. Project Equipment, Furniture & Fixtures

Every business cannot operate without equipment, furniture and fixtures in the

workplace. The proposed equipment, furniture and fixtures to be acquired before the

project is implemented are the following: one (1) set of computer, one (1) telephone ,

one(1) printer and a calculator.


These equipment will be used by the employees of the business to ensure the

smooth operation of the business. The proponent suggested having one set of

computer for the nipa huts in-charge and the receptionist/cashier. The printer would

also be used by the office. The business must have at least one (1) unit of telephone

for the queries of the prospective clients and for other business related concerns.

One (1) printer will be used for scanning important documents and printing vouchers

and forms. And of course, calculators to be used for computation of interest and other

related financial matters

Sleeping
KitchenMaterials
Utensils No.
No.ofofUnits
Units Unit
UnitCost
Cost(Pesos)
(Pesos) Total
TotalCost
CostininPesos
Pesos

Foam (48” x 75 x 2”)


Spoon 20 50 1,770 15 P35,400 P750

Bed sheets (54”x 78”)


Fork 20 50 330 15 P 6,600 P750

Comforter
Knife (39” x 78.5”) 20 3 599 65 P11,980 P195

Pillows (4”
Dinner x 12” x 28”)
plate 30 50 280 35 P 8,400 P1750

Pillowsheets
Small plate (12”x30”) 30 30 85 25 P 2,550 P750

Soup (40”
Curtain cup x 60”) 20 30 399 20 P 7,980 P600

Floor Mat
Glass cup 50 meters50 120 20 P6000 P1000

Total P78, 910


Mug 30 25 P750

Frying Pan 5 299 P1495

Frying Pot 5 299 P1495

Ladle 5 50 P250

Total P9,785

Cleaning Equipment No. of Units Unit Cost (Pesos) Total Cost in Pesos

Door Mat 10 100 P1000

Soft broom 5 45 P225

Broom stick 5 20 P100

Mop 5 100 P500

Spray bottle 5 25 P125

Dustpan 5 70 P350

Rugs 10 10 P100

Total P2,400

Equipment No. of Units Unit Cost (Pesos) Total Cost in Pesos


Service vehicle 1 650,000 P650,000

Television 1 5,300 P5,300

Wall Fan 12 2,300 P27,600

Computer desktop 1 35,000 P35,000

Dispenser (Hot & Cold) 2 3,499 P6,900

Mobile Phone 1 3,600 P3,600

Printer 1 3,000 P3,000

Freezer 1 17,600 P17,600

Rice cooker (7.8L) 3 3,895 P3,895

Stove 1 10,000 P10,000

Fire Extinguisher 3 1,200 P3,600

Chairs (wooden) 30 189 P5,670

Dinning wooden Table 3 13,500 P13,500

sets

Circular table 6 10,000 60,000

Total P845,665
ORGANIZATIONAL CHART
Salary Scales

Position Daily Salary Number of Monthly Salary Annual Salary


Personnel (26 days)

Receptionist P300 1 P7,800 P93,600

Cashier P300 1 P7,800 P93,600

Line Cook P300 1 P7,800 P93,600

Security Guard P250 2 P13,000 P156,000

Driver P200 1 P5,200 P62,400

Helper(s) P200 5 P26,000 P312,000

Total P1,550 11 P67, 600 P811,200

Management Proposals

The general operating policies and rules in the business are:

1. the employee must report fifteen minutes prior to it’s opening for the preparation

purpose

2. Helper’s must kept the place clean at all times.

3. The staff in the Campo de Kamalig should check the machines and equipment that

will e used in the operation to minimize the breakdown.

4. All employees are entitled to have a one day-off per week.


5. Excessive absences or tardiness will result in disciplinary action up to and

including termination.

6. The garbage must be segregated accordingly, recyclable, biodegradable, and

non-biodegradable.

7. Each employee shall be entitled to a thirty minutes break for snacks, lunch and

dinner but not simultaneous with one another so that the business operation will

be disrupted.

The responsibilities or role of the house-in-charge are to: manage the day to day

operations within the company, manage working capital including; receivables,

inventory, cash, purchasing, portioning, pricing and inventory control including

approval of all financial obligations of the company.

Utilities

Monthly Annually

Water Expense P 1000 P 12 000

Electricity Expense P 6000 P 72 000

Total P 7 000 P 84 000

You might also like