3757 Demolition and site clearance

Rate Total
Item Description Qty Unit
USD USD

Demolition and site clearance

Site Clearance (Items for demolition and site clearance


shall be deemed to include disposal of the materials
arising)

General Clearance

D111 On Urban Land ha 0.00 0.00

D111.1 Removal from site and disposal of ha 0.00 0.00

D111.2 Locally disposed ha 0.00 0.00

D111.3 Set aside for reuse ha 0.00 0.00

D111.4 Removed from site and disposed of as directed ha 0.00 0.00

On Agricultural Land

D112.1 Removal from site and disposal of ha 0.00 0.00

D112.2 Locally disposed ha 0.00 0.00

D112.3 Set aside for reuse ha 0.00 0.00

D112.4 Removed from site and disposed of as directed ha 0.00 0.00

Rough grassland

D113.1 Removal from site and disposal of ha 0.00 0.00

D113.2 Locally disposed ha 0.00 0.00

D113.3 Set aside for reuse ha 0.00 0.00

D113.4 Removed from site and disposed of as directed ha 0.00 0.00

Seasonal swamp

D114.1 Removal from site and disposal of ha 0.00 0.00

D114.2 Locally disposed ha 0.00 0.00

To Collection 0.00
Page 1 / 1

Ref:X
3757 Demolition and site clearance
Rate Total
Item Description Qty Unit
USD USD

D114.3 Set aside for reuse ha 0.00 0.00

D114.3 Removed from site and disposed of as directed ha 0.00 0.00

Removal of Trees

D210 Girth: 500 mm - 2 m nr 0.00 0.00

D220 Girth exceeding 2m nr 0.00 0.00

Removal of Stumps

D310 Diameter less than 1m nr 0.00 0.00

D320 Diameter exceeding 1m nr 0.00 0.00

Buildings (Demolish and remove existing buildings,


reinstate or remove to dump site as per project
specification)

Brickwork

D411 Volume: not exceeding 50 m3 sum 0.00 0.00

D412 Volume: 50 - 100 m3 sum 0.00 0.00

D413 Volume: 100 - 250 m3 sum 0.00 0.00

D414 Volume: 250 - 500 m3 sum 0.00 0.00

D415 Volume: 500 - 1000 m3 sum 0.00 0.00

D416 Volume: 1000 - 2500 m3 sum 0.00 0.00

D417 Volume: 2500 - 5000 m3 sum 0.00 0.00

D418 Volume: stated exceeding 5000 m3 sum 0.00 0.00

Concrete

D421 Volume: not exceeding 50 m3 sum 0.00 0.00

To Collection 0.00
Page 1 / 2

Ref:X
3757 Demolition and site clearance
Rate Total
Item Description Qty Unit
USD USD

D422 Volume: 50 - 100 m3 sum 0.00 0.00

D423.01 Volume: 100 - 250 m3 sum 0.00 0.00

Metal

D441 Volume: not exceeding 50 m3 sum 0.00 0.00

D442 Volume: 50 - 100 m3 sum 0.00 0.00

Other structures

Brickwork

D511 Volume: not exceeding 50 m3 sum 0.00 0.00

D512 Volume: 50 - 100 m3 sum 0.00 0.00

D513 Volume: 100 - 250 m3 sum 0.00 0.00

Concrete

D521 Volume: not exceeding 50 m3 sum 0.00 0.00

D522 Volume: 50 - 100 m3 sum 0.00 0.00

D523 Volume: 100 - 250 m3 sum 0.00 0.00

Masonry

D531 Volume: not exceeding 50 m3 sum 0.00 0.00

D532 Volume: 50 - 100 m3 sum 0.00 0.00

Metal

D541 Volume: not exceeding 50 m3 sum 0.00 0.00

D542 Volume: 50 - 100 m3 sum 0.00 0.00

D543 Volume: 100 - 250 m3 sum 0.00 0.00

To Collection 0.00
Page 1 / 3

Ref:X
3757 Demolition and site clearance
Rate Total
Item Description Qty Unit
USD USD

Timber

D551 Volume: not exceeding 50 m3 sum 0.00 0.00

D552 Volume: 50 - 100 m3 sum 0.00 0.00

D553 Volume: 100 - 250 m3 sum 0.00 0.00

No predominant material

D561 Volume: not exceeding 50 m3 sum 0.00 0.00

D562 Volume: 50 - 100 m3 sum 0.00 0.00

D563 Volume: 100 - 250 m3 sum 0.00 0.00

Clearance of Pipeline Wayleaves, disposal local

Pipelines

Nominal bore: 100 - 300 mm

D611 Pipeline only m³ 0.00 0.00

D612 Pipeline and access track 1 m³ 0.00 0.00

Nominal bore: 300 - 500 mm

D621 Pipeline only m³ 0.00 0.00

D622 Pipeline and access track m³ 0.00 0.00

Nominal bore: exceeding 500 mm

D631 Pipeline only m³ 0.00 0.00

D632 Pipeline and access track m³ 0.00 0.00

To Collection 0.00
Page 1 / 4

Ref:X
3757 Demolition and site clearance
Rate Total
Item Description Qty Unit
USD USD

Removal of ant and termite hills and nests

General site clearance

D711 Excess material - removed form site and disposed m³ 0.00 0.00
of
D712 Excess material - locally disposed m³ 0.00 0.00

Along pipeline routes

D721 Excess material - removed form site and disposed m³ 0.00 0.00
of
D722 Excess material - locally disposed m³ 0.00 0.00

Removal of man placed or naturally deposited material

In existing channels

D811 Removed from site and disposed of m³ 0.00 0.00

D812 Locally disposed m³ 0.00 0.00

D813 Set aside for reuse m³ 0.00 0.00

D814 Removed from site and disposed of as directed m³ 0.00 0.00

In existing chambers

D821 Removed from site and disposed of m³ 0.00 0.00

D822 Locally disposed m³ 0.00 0.00

D823 Set aside for reuse m³ 0.00 0.00

D824 Removed from site and disposed of as directed m³ 0.00 0.00

In existing cellular structures

D831 Removed from site and disposed of m³ 0.00 0.00

D832 Locally disposed m³ 0.00 0.00

D833 Set aside for reuse m³ 0.00 0.00

To Collection 0.00
Page 1 / 5

Ref:X
3757 Demolition and site clearance
Rate Total
Item Description Qty Unit
USD USD

D834 Removed from site and disposed of as directed m³ 0.00 0.00

In other structures, (........)

D841 Removed from site and disposed of m³ 0.00 0.00

D842 Locally disposed m³ 0.00 0.00

D843 Set aside for reuse m³ 0.00 0.00

D844 Removed from site and disposed of as directed m³ 0.00 0.00

D910 Earthworks 0.00

D911 Landscaping, Plant Trees - replant indigenous nr 0.00 0.00


plants

To Collection 0.00
Page 1 / 6

Ref:X
3757 Demolition and site clearance
Total
USD

Collection From
1/1 0.00
1/2 0.00
1/3 0.00
1/4 0.00
1/5 0.00
1/6 0.00

Demolition and site clearance Carried to Summary 0.00

Ref:X
3757 Demolition and site clearance

D1

D1.010

D1.010.01

D1.010.010.01

D1.010.010.02

D1.010.010.03

D1.010.010.04

D1.010.02

D1.010.020.01

D1.010.020.02

D1.010.020.03

D1.010.020.04

D1.010.03

D1.010.030.01

D1.010.030.02

D1.010.030.03

D1.010.030.04

D1.010.04

D1.010.04.01

D1.010.04.02

Ref:X
3757 Demolition and site clearance

D1.010.04.03

D1.010.04.03

D2

D2.010

D2.020

D3

D3.010

D3.020

D4

D4.010

D4.010.010

D4.010.020

D4.010.030

D4.010.040

D4.010.050

D4.010.060

D4.010.070

D4.010.080

D4.020

D4.020.010

Ref:X
3757 Demolition and site clearance

D4.020.020

D4.020.030

D4.040

D4.040.010

D4.040.020

D5

D5.010

D5.010.010

D5.010.020

D5.010.030

D5.020

D5.020.010

D5.020.020

D5.020.030

D5.030

D5.030.010

D5.030.020

D5.040

D5.040.010

D5.040.020

D5.040.030

Ref:X
3757 Demolition and site clearance

D5.050

D5.050.010

D5.050.020

D5.050.030

D5.060

D5.060.010

D5.060.020

D5.060.030

D6

D6

D6.010

D6.010

D6.010

D6.020

D6.020.010

D6.020.020

D6.030

D6.030.010

D6.030.020

Ref:X
3757 Demolition and site clearance

D7

D7.010

D7.010.01

D7.010.02

D7.020

D7.020.01

D7.020.02

D8

D8.010

D8.010.010

D8.010.020

D8.010.030

D8.010.040

D8.020

D8.020.01

D8.020.02

D8.020.03

D8.020.04

D8.030

D8.030.01

D8.030.02

D8.030.03

Ref:X
3757 Demolition and site clearance

D8.030.04

D8.040

D8.040.01

D8.040.02

D8.040.03

D8.040.04

D9

D9.010.01

Ref:X
3757
Total
USD

Collection from:-
Demolition and site clearance 0.00

To Final Summary 0.00