PROJECT: 126MW WIND POWER PROJECT SITE INSPECTION REPORT ON 01.11.2014 REPORT NO.

:
Action
No. Photographs Location Issues Action Required Action By Status
Date

1 Pending

Aggregate Ensure single size


Stock Pile 10mm & 20mm aggregate should not Atriwal
near aggregate is mix with each other. Contractor/
2 Immediate Pending
B.Plant @ mixing with Partition required for Laxmikant
Atriwal each other. avoiding mixing of (WEL)
Contractor aggregate.

Mixing of 20mm
& 10mm
aggregate

No. Photographs Location Issues Action Required Action By Action Status


Page 1 of 3
PROJECT: 126MW WIND POWER PROJECT SITE INSPECTION REPORT ON 01.11.2014 REPORT NO.:

Date

Improper
curing of
concrete cube

Curing Proper curing is Proper curing should be Atriwal


Tank @ not being done done for concrete Contractor/
3 lab , for concrete cubes. Ensure concrete Immediate Pending
Laxmikant
Atriwal cubes. cube should be covered (WEL)
Contractor with clean water
maintaining
temperature 27+/-2 deg
C.

Stone piece is
being used

Stone piece is Use of same should be


PRG 79
being used restricted. Only cover
,Raft Atriwal
4 instead of cover block should be used. Immediate Pending
Reinforcem Contractor/
block.
ent

Page 2 of 3
PROJECT: 126MW WIND POWER PROJECT SITE INSPECTION REPORT ON 01.11.2014 REPORT NO.:

Page 3 of 3