Beam Design Check
- - -42 Not Ok
- - -42 Not Ok
OK
- - -36.5 Not OK
OK
- - -32 Not OK
OK
- - -40 Not OK
OK
- - -34 Not OK
OK
- - -28.8 Not OK
1B 40 8000 300 600 25 10 25 512 552.5 47.5 0.14 0.156 Singly 446.00 0
Shear link
fcu fyv bv Φ No d As prov M
h Main Main V v100As/b(400/d)
v
d vc T.3.8(fcu/25)^1/3 vc 0.5vc
30 250 300 750 25 4 701 1963 285 120.2 0.57 0.93 1.00 0.62 1.06 0.66 0.33
Hook Up
Reaction fy Ash BAR As As prov As? %As prov
3 - T 32
400 500 920 2413 OK 162.39
1 - T 0
Compression Tension DEFLE
BAR As' As' prov As? %As' prov Mf C As BAR As As prov As? %As prov M/bd2
0 - T 0 6 - T 25
0 OK - 1.00 2639 2945 OK 11.60 5.591
0 - T 0 0 - T 25
20%= 527.8 0 - T 25
30%= 791.7
50%= 1320
max s
0.5vc vc + 0.4 0.8√(fcu) @ 5 Case Dia no Asv sv <0.75d L max, x
< v 1.06 >v 4.38 > v 2 Min link 10 2 157 285 200 OK -779
Nos -3894
0T0 Case 3
0T0
x=-779m x=1566m
min s
sv L min, x
311 250 1566.0
Nos 6263
<3 >1
fcu fyv bv h Main Φ Main No d As prov V v 100As/bvd (400/d) vc T.3.8
30 500 230 750 25 5 703 2454 705 4.36 1.52 1.00 0.73
CASE 2
Maximum Spacing
Spacing, Sv
Assume Spacing
3R10-250
CASE 3
Min Link
Spacing, Sv
Assume Spacing
(fcu/25)1/3 vc 0.5vc vc + 0.4 0.8√(fcu) @ 5 Case Dia no Asv
1.06 0.77 0.39 < v 1.17 < v 4.38 >v 3 Link Required 10 3 236
Depth, H = 750
Maximum Spacing = 527.3 < 0.75d Mainbar = = 25
Spacing, Sv = 1217 mm Cover = = 25
Assume Spacing = 250 mm Link = = 10
Effective d = 702.5
Length, x = 1.81 m
Spacing, Sv = 135.6 mm
Assume = 125 mm
Spacing, Sv = 1217 mm
Assume Spacing = 250 mm
sv
124