Steel Melting Shop
Steel Melting Shop
ON
PREPARED BY
1. Introduction:
2. Market:
3. Raw Material:
The raw material used in manufacturing of Ingots is scrap and sponge iron.
2
4. Manufacturing Process
The most commonly used ingot mould sizes for ingot production are 3”x4”x60” 3 ½”x4
½”x60”. The process of manufacturing Ingots through steel melting shop is
explained in the following process flow diagram:
Melting of steel
In furnace
Solidification of ingots
3
5. Technology:
6. Investment:
The investment for setting up a Steel Melting Shop Plant works out to Rs. 2.34
Crores and the break up of the cost is tabulated below.
The land requirement will be around 1.0 acres. The Preliminary & Pre-operative
expense works out to Rs 0.17 crores. Plant & Machinery including installation,
erecting & transportation charges are of 0.60 Crores. Buildings and civil works
are estimated to be 0.30 Crores. Electricity Deposits of 0.38 Crores has been
estimated. The cost of electrical installation and Misc. Fixed assets works out to
Rs. 0.50 Crores. Contingencies @ 3% have been considered in the project cost.
Margin money for working capital is estimated to be 0.28 Crores.
4
4 Electrical Inst. & Misc. Fixed Assets 0.50
5 Contingency @ 3% 0.04
6 Electricity Deposits 0.38
7 Preliminary & Pre-operative Expenses 0.17
8 Margin Money for Working capital 0.28
Total Project Cost 2.34
Means of Finance
The project is proposed to finance with a debt equity ratio of 1.99:1 and the
means of finance is as follows:
7. Profitability Assumptions:
Basic assumptions of the Steel Melting shop unit are given in the table below:
• The installed capacity is considered at 25 TPD
• The unit will work for 300 days with single shift operations of 8 hours.
• The unit can work at 80% capacity for the first year and can increase by 5%
there on till third year.
• The manpower requirement is considered at 38 personnel for various level
viz. casual labour, Technical & Supervisory staff and administrative staff.
5
8. Key Financial indicators:
The returns are adequate enough to repay the term loan in 5 years. The key financial indicators are tabulated below.
(Rs. in Crores)
S No Particulars Year 1 Year 2 Year 3 Year 4 Year 5
1 Sales 12.96 13.77 14.58 14.58 14.58
2 Total Expenditure 12.19 12.93 13.67 13.68 13.70
3 PBIDT 0.77 0.84 0.91 0.90 0.88
4 PBT 0.39 0.49 0.59 0.60 0.62
5 PAT 0.30 0.36 0.42 0.42 0.42
6 Cash Accruals 0.38 0.44 0.49 0.50 0.50
7 BEP @ Operating capacity 52.55% 46.80% 41.99% 40.06% 38.13%
8 Debt Equity Ratio 1.68 1.38 1.07 0.77 0.46
9 DSCR (Gross) 1.34 1.50 1.70 1.77 1.87
10 Average DSCR 1.80
11 DSCR (Net) 1.61 1.84 2.08 2.09 2.10
12 Average DSCR 2.15
13 IRR (%) 22%
*********