4 500 E

5 000 E
RL 96
10 000 N

RL 48

RL 60

RL 72

RL 84

RL 96
of ction
ike
Str
e
Bench

Dir
RL 48
Orientation High
Wall
Low
Wall

Bench
Height
Cross Pit Ramp

Haul
Haul
Bench Width
Cross Pit Access

Back
Back
RL -12
Drop Temporary

Road
RL 00

Road
Cut Ramp

10 500 N

0 250 RL -48
PT Adaro Indonesia
Metres
TUTUPAN MINE

MINE LAYOUT DEFINITIONS


MineConsult
mine management consultants
Date: Nov. 2004 Job No. 1933 Figure 1
3 000 E

4 000 E

5 000 E

6 000 E
11 000 N

e
anc
A dv
P it
s
RL 96

itie
il
Fac
To
RL 48

10 000 N

RL 0

RL -48

RL -96
Road

RL -144
9 000 N
Haul

RL -144
RL 96

RL -48

RL -96
R L 48

RL 0

-192
-204
RL -174

RL -144

RL -96

RL -48
8 000 N

RL 0

RL 48

RL 96

R E H A B. SURFACE

7 000 N

LAYOUT WHEN BENCHES


ALIGN WITH HAULBACK ROADS

PT Adaro Indonesia
0 500
TUTUPAN MINE
Metres

2003 LOM HAULBACK CONCEPT


MineConsult
mine management consultants
Date: Nov. 2004 Job No. 1933 Figure 2
3 000 E

4 000 E

5 000 E

6 000 E

7 000 E
ce
v an
Ad
Pit
10 000 N

RL 96 RL 96
RL 120

RL 48

RL 0

9 000 N

RL -48

RL -96

RL -144

8 000 N

-192
RL 138

-204

-192

RL -144

RL -96
7 000 N

RL -48
RL 138

RL 0

RL 48

RL 90

6 000 N

In-Pit RL 138
Dump

5 000 N

0 500 PT Adaro Indonesia


Metres TUTUPAN MINE

HAULBACK DESIGN CONCEPT


MineConsult (Year 2016) 4 000 N
mine management consultants
Date: Nov. 2004 Job No. 1933 Figure 3
3 000 E

4 000 E

5 000 E

6 000 E

7 000 E
ce
v an
Ad
Pit
10 000 N

RL 96 RL 78 RL 120

RL 48 RL 36

RL 0

RL -12 RL -24

RL -48 9 000 N

RL -84

RL -96
RL -120
56
RL -1

8 000 N

RL 138
92
RL -1

4
-14

-96
RL

-48
RL

0
RL

RL
4

48
- 20

RL
RL

RL -192

RL
-144

RL -120

RL -72 7 000 N
RL -48

RL -24
RL 138
RL 0

RL 24

RL 48

RL 72

RL 90

6 000 N

In-Pit RL 138
Dump

5 000 N

0 500 PT Adaro Indonesia


Metres TUTUPAN MINE

HAULBACK DESIGN CONCEPT


MineConsult Mid Cycle 4 000 N
mine management consultants
Date: Nov. 2004 Job No. 1933 Figure 4
3 000 E

4 000 E

5 000 E

6 000 E

7 000 E
RL 120

2
9 000 N
7

2
7
ce
van
Ad
Pit

7
2

8 000 N

RL 84
RL 90

RL 48 RL 138
RL 48

0 RL 0 7 000 N

RL 138
RL -48

7 2
RL -96

RL -144 6 000 N

RL 138
RL -96

RL -48

5 000 N
RL 0
2
7

RL 48

RL 90

In-Pit
Dump
4 000 N

0 500 PT Adaro Indonesia


9 0

Metres TUTUPAN MINE

HAULBACK DESIGN CONCEPT


MineConsult (Year 2008) 3 000 N
mine management consultants
Date: Nov. 2004 Job No. 1933 Figure 5
4 500 E

5 000 E
RL 96
10 000 N

RL48

RL 0

10 500 N

0 250 RL-48
PT Adaro Indonesia
Metres
TUTUPAN MINE

STEP 1 OF HAULBACK ADVANCE


MineConsult
mine management consultants

RL-96 Date: Nov. 2004 Job No. 1933 Figure 6


4 500 E

5 000 E
RL 96
10 000 N

RL 48

RL 60

RL 72

RL 84

RL 96
RL 48

RL 00 RL -12

10 500 N

0 250 RL -48
PT Adaro Indonesia
Metres
TUTUPAN MINE

STEP 2 OF HAULBACK ADVANCE


MineConsult
mine management consultants
Date: Nov. 2004 Job No. 1933 Figure 7
4 500 E

5 000 E
RL 96
10 000 N

RL 48

RL 00

RL -12

10 500 N
RL -24

0 250 RL -48
PT Adaro Indonesia
Metres
TUTUPAN MINE

STEP 3 OF HAULBACK ADVANCE


MineConsult
mine management consultants
Date: Nov. 2004 Job No. 1933 Figure 8
4 500 E

5 000 E
RL 96
10 000 N

RL 48

RL 00

RL -12

RL -24
RL -24
10 500 N

RL -36

0 250 RL -48
PT Adaro Indonesia
Metres
TUTUPAN MINE

STEP 4 OF HAULBACK ADVANCE


MineConsult
mine management consultants
Date: Nov. 2004 Job No. 1933 Figure 9
4 500 E

5 000 E
RL 96
10 000 N

RL 48

RL 00

RL -24

RL -36
10 500 N

Next Ramp Drop Cut

0 250 RL -48
PT Adaro Indonesia
Metres
TUTUPAN MINE

STEP 5 OF HAULBACK ADVANCE


MineConsult
mine management consultants
Date: Nov. 2004 Job No. 1933 Figure 10
12m

6m
0
16

0 50

Metres SURFACE DUMP DESIGN

DIRECTION OF MINING

MINING FACE See Detail Above


Bench Height:............. 48m
IN-PIT DUMP FACE Bench Width:.............. 250m
Bench Height:............. 24m Individual Batter Angle: 500
Bench Width:.............. 30m Overall Angle:............. 130
Individual Batter Angle: 26
0

Overall Angle:............. 18
0

Active sump water level must


not be allowed to exceed level
of in-pit dump base to avoid
Previous sump with Goodbye Cut with saturation of the toe line
mud left in place a clean base

150m 100m 250m

PT Adaro Indonesia

0 250 TUTUPAN MINE


Metres

PIT AND DUMP DESIGN CRITERIA


MineConsult
mine management consultants
Date: Nov. 2004 Job No. 1933 Figure 11