Professional Documents
Culture Documents
PROCEDURE
PROCEDURE
4.1 The screw speed, pelletize speed and temperature are first decided before the testing
is done.
4.2 The extruder machine is then switched on and the decided screw speed and
temperature is then set and wait until the temperature to heat up the machine.
4.3 The thermoplastic sample PE copolymer is then poured into the hopper.
4.4 The extrudate is cut for two times for an interval of 5 seconds and then it is cut again
4.5 The melt pressure, melt temperature is recorded for every 10 min.
4.6 The extrudate is then put into the cutter to be cut into pellet and the pellet is then
weight
Flow Rate =
time