Professional Documents
Culture Documents
Projects Undertaken by JKERA
Projects Undertaken by JKERA
Rs in crores
Estimated
Release
Year of
S. cost Expdt. Expen
start
Constituenc Ex.Agen Balanc d Physical
No Name of the work 8/201 8/201
y Re cy e cost 2017- status
. Org 7 7
v 18
construction of
flyover/Express
way Corridor
from Jahangir
Chowk to
339.5 186.3 153.2 186.3 work in
NA
Year of
cost Expdt. Release Expen
start
S.No Constituen Ex.Agenc Balanc Physica
Name of the work cy
8/201 d 2017- 8/201
. Re y e cost l status
Org 7 18 7
v
construction of
surface Drainage
System in
Athawagan
Amirakadal
catchment on work in
45.9
NA
Year of
cost Expdt. Release Expen
start
S.No Name of the Constituenc Ex.Agenc Balanc Physical
y
8/201 d 2017- 8/201
. work Re y e cost status
Org 7 18 7
v
construction
ofsanitary
landfill cell 3 Main cell
at existing complete
Amirakadal
d and
landfill site at 19.5
NA
Year of
cost Expdt. Release Expen
start
S.No Constituen Ex.Agenc Balanc Physica
Name of the work cy
8/201 d 2017- 8/201
. Re y e cost l status
Org 7 18 7
v
Upgradation
and upliftment
of existing
drainage
pumping
Amirakadal
work in
stations on left 42.8
NA
Year of
cost Expen Physic
start
S.N Constituen Ex.Agen . Balanc d
Name of the work 8/201 al
o. cy Re cy 8/201 e cost 2017-
Org 7 status
v 7 18
Providing and
laying of raw
water main from
higher reaches of
Amirakadal
Doodhganga work
42.6 27.7 27.7 in
NA
1 Nalah to _ ERA 14.97 0.00
7 0 0 progre
Kralpora (WTP ss
Dodhganga)
(JKUSDIP
Srinagar
/WS/02)
DEPARTMENT :- ERA
Rs in crores
Year of start
S.No. Name of the work Constitu Estimated Ex.Agen Expdt. Balanc Releas Expen Physical
ency cost cy 8/201 e cost ed 8/201 status
Org Re 7 2017- 7
v 18
1 Construction of New 61.7 _ ERA 26.30 35.47 0.00 26.30 work in
Majoor Bridge at 7 progress
Amirakadal
Year of start
S.No Name of the work Constitue Estimated Ex.Age Expdt. Balan Releas Expen Physical
. ncy cost ncy 8/201 ce ed 8/201 status
Org Re 7 cost 2017- 7
v 18
1 construction of Surface Amirakad 155.5 _ ERA 128.9 26.59 0.00 128.9 work in
water drainage System al 7 8 8 progress
for Rawalpora-
Chanapora area with a
total catchment area
NA