DEPARTMENT :- ERA

Rs in crores
Estimated
Release

Year of
S. cost Expdt. Expen

start
Constituenc Ex.Agen Balanc d Physical
No Name of the work 8/201 8/201
y Re cy e cost 2017- status
. Org 7 7
v 18

construction of
flyover/Express
way Corridor
from Jahangir
Chowk to
339.5 186.3 153.2 186.3 work in
NA

1 Rambagh- Amirakadal _ ERA 0.00


7 2 5 2 progress
Natipora in
srinagar City
(JKUSDIP
Srinagar/UT/01
)
DEPARTMENT :- ERA
Rs in crores
Estimated

Year of
cost Expdt. Release Expen

start
S.No Constituen Ex.Agenc Balanc Physica
Name of the work cy
8/201 d 2017- 8/201
. Re y e cost l status
Org 7 18 7
v
construction of
surface Drainage
System in
Athawagan
Amirakadal

catchment on work in
45.9
NA

1 National _ ERA 23.40 22.52 0.00 23.40 progres


2 s
Highway Bypas
at Srinagar
(JKUSDIP
Srinagar/SWD/
01)
DEPARTMENT :- ERA
Rs in crores
Estimated

Year of
cost Expdt. Release Expen

start
S.No Name of the Constituenc Ex.Agenc Balanc Physical
y
8/201 d 2017- 8/201
. work Re y e cost status
Org 7 18 7
v
construction
ofsanitary
landfill cell 3 Main cell
at existing complete
Amirakadal

d and
landfill site at 19.5
NA

1 _ ERA 3.73 15.81 0.00 23.40 O&M


Achan, 4 started
Srinagar from 06-
(JKUSDIP 09-2017
Srinagar/SW
M /05)
DEPARTMENT :- ERA
Rs in crores
Estimated

Year of
cost Expdt. Release Expen

start
S.No Constituen Ex.Agenc Balanc Physica
Name of the work cy
8/201 d 2017- 8/201
. Re y e cost l status
Org 7 18 7
v
Upgradation
and upliftment
of existing
drainage
pumping
Amirakadal

work in
stations on left 42.8
NA

1 _ ERA 20.28 22.56 0.00 20.28 progres


and right side 4 s
of river Jehlum
in srinagar city
(JKUSDIP
Srinagar/SWD
/03)
DEPARTMENT :- ERA
Rs in crores
Estimated
Expdt Release

Year of
cost Expen Physic

start
S.N Constituen Ex.Agen . Balanc d
Name of the work 8/201 al
o. cy Re cy 8/201 e cost 2017-
Org 7 status
v 7 18

Providing and
laying of raw
water main from
higher reaches of
Amirakadal

Doodhganga work
42.6 27.7 27.7 in
NA
1 Nalah to _ ERA 14.97 0.00
7 0 0 progre
Kralpora (WTP ss
Dodhganga)
(JKUSDIP
Srinagar
/WS/02)
DEPARTMENT :- ERA
Rs in crores

Year of start
S.No. Name of the work Constitu Estimated Ex.Agen Expdt. Balanc Releas Expen Physical
ency cost cy 8/201 e cost ed 8/201 status
Org Re 7 2017- 7
v 18
1 Construction of New 61.7 _ ERA 26.30 35.47 0.00 26.30 work in
Majoor Bridge at 7 progress
Amirakadal

Jawahar Nagar and Two


grade separators in NA
srinagar city (JKUSDIP
Srinagar/UT /03)
DEPARTMENT:- ERA
Rs in crores

Year of start
S.No Name of the work Constitue Estimated Ex.Age Expdt. Balan Releas Expen Physical
. ncy cost ncy 8/201 ce ed 8/201 status
Org Re 7 cost 2017- 7
v 18
1 construction of Surface Amirakad 155.5 _ ERA 128.9 26.59 0.00 128.9 work in
water drainage System al 7 8 8 progress
for Rawalpora-
Chanapora area with a
total catchment area
NA

284.75 Hain srinagar


City (JKUSDIP
Srinagar/SWD/02)