Rev 1 Rab Pondasi Saepul
Rev 1 Rab Pondasi Saepul
A PREPARATION
1 Bowplank 14.00 m' 500,000.00
- Kaso 4/6 6.00 btg 60,000.00 360,000.00
- Paku 7 2.00 kg 20,000.00 40,000.00
- Benang Ukur 1.00 pak 15,000.00 15,000.00
500,000.00 500,000.00
360,000.00
40,000.00
15,000.00
2,000,000.00 2,000,000.00
2,500,000.00 2,915,000.00
3,500,000.00 3,500,000.00
4,000,000.00 4,000,000.00
1,840,000.00 1,840,000.00
1,300,000.00
3,000,000.00
200,000.00
-
264,937.50 2,024,122.50
6,104,937.50 15,864,122.50
345,600.00 345,600.00
290,000.00
360,000.00
100,000.00
75,000.00
LABOUR MATERIAL & LABOUR
SUBTOTAL (IDR)
50,000.00
1,617,600.00 1,617,600.00
2,200,000.00
3,168,000.00
250,000.00
-
450,000.00 2,178,000.00
2,413,200.00 10,634,200.00
11,018,137.50 29,413,322.50