CONCRETE TRACKING RECORD FOR C60+5%SF

MOZOON TOWER  Week Coverage: 16th to 21st of December 2017
E Test 
For 
l Total  Schedule 
Date  Cube crushing date  Cube crushing date  Total  Witness  
Date Finish Location Area Structure e Concrete  Supplier NPC for this  Date
Started (7 days) (28 days) Cubes (Please 
v (m 3 ) week (7D 
Check)
a & 28D)
18‐Nov‐17 18‐Nov‐17 25‐Nov‐17 16‐Dec‐17 Tower B 1st Lift  5nos. Columns 7 12 QATAR BETON NPC‐0558 28 16‐Dec‐17

18‐Nov‐17 18‐Nov‐17 25‐Nov‐17 16‐Dec‐17 Tower B & C 1st Lift Columns 7 17 QATAR BETON NPC‐0553 28 16‐Dec‐17
C2 GL(K/36), C2D GL(K/31), C2 
18‐Nov‐17 18‐Nov‐17 25‐Nov‐17 16‐Dec‐17 Tower D TD‐FP, 1st Lift 7 88 RABBAN NPC‐0569 28 16‐Dec‐17
GL(K/29), C2 GL(H/27)
18‐Nov‐17 19‐Nov‐17 26‐Nov‐17 17‐Dec‐17 Tower D GL(30‐YX1) Retaining Wall w/ Stair‐4 Wall 14 53 RABBAN NPC‐0571 28 17‐Dec‐17

19‐Nov‐17 19‐Nov‐17 26‐Nov‐17 17‐Dec‐17 Tower B TB‐FP Column Neck 7 45 QATAR BETON NPC‐0570 28 17‐Dec‐17

16‐Nov‐17 17‐Nov‐17 24‐Nov‐17 15‐Dec‐17 Tower A GL(A2‐AT/18‐26) Column necks 7 96 RABBAN NPC‐0477 28 15‐Dec‐17

18‐Nov‐17 18‐Nov‐17 25‐Nov‐17 16‐Dec‐17 Tower B 1st Lift Columns 7 12 QATAR BETON NPC‐0558 28 16‐Dec‐17

18‐Nov‐17 18‐Nov‐17 25‐Nov‐17 16‐Dec‐17 Tower B & C 1st Lift Columns 7 17 QATAR BETON NPC‐0553 28 16‐Dec‐17
C2 GL(K/36), C2D GL(K/31), C2 
18‐Nov‐17 18‐Nov‐17 25‐Nov‐17 16‐Dec‐17 Tower D TD‐FP, 1st Lift 7 88 RABBAN NPC‐0569 28 16‐Dec‐17
GL(K/29), C2 GL(H/27)
18‐Nov‐17 19‐Nov‐17 26‐Nov‐17 17‐Dec‐17 Tower D GL(30‐YX1) Retaining Wall w/ Stair‐4 Wall 14 53 RABBAN NPC‐0571 28 17‐Dec‐17

19‐Nov‐17 19‐Nov‐17 26‐Nov‐17 17‐Dec‐17 Tower B TB‐FP Column Neck 7 45 QATAR BETON NPC‐0570 28 17‐Dec‐17

20‐Nov‐17 20‐Nov‐17 27‐Nov‐17 18‐Dec‐17 Tower C GL(F‐K/1‐2) Retaining Wall w/ Stair‐3 Wall 7 FALCON 28 18‐Dec‐17

20‐Nov‐17 20‐Nov‐17 27‐Nov‐17 18‐Dec‐17 Tower  B & C Columns (2 nos.) 7 FALCON 28 18‐Dec‐17


GL(9/TC1), 
20‐Nov‐17 20‐Nov‐17 27‐Nov‐17 18‐Dec‐17 Tower   C W5 & W9 Walls 7 FALCON 28 18‐Dec‐17
(9/TC2)
20‐Nov‐17 21‐Nov‐17 28‐Nov‐17 19‐Dec‐17 Tower   B GL(X‐AS/1‐2) Retaining Wall w/ Stair‐5 Wal 7 FALCON 28 19‐Dec‐17
TB‐FP, 2nd Lift, 
20‐Nov‐17 21‐Nov‐17 28‐Nov‐17 19‐Dec‐17 Tower   B GL(8/TB1) &  Columns (C5) 7 FALCON 28 19‐Dec‐17
(9/TB1)
20‐Nov‐17 21‐Nov‐17 28‐Nov‐17 19‐Dec‐17 Tower   D Columns (3 nos.) 7 FALCON 28 19‐Dec‐17

21‐Nov‐17 21‐Nov‐17 28‐Nov‐17 19‐Dec‐17 Tower A TD‐FP Column Neck 7 128 FALCON NPC‐0572 28 19‐Dec‐17

22‐Nov‐17 22‐Nov‐17 29‐Nov‐17 20‐Dec‐17 Tower B GL(X‐A/1) Retaining Wall 7 24 FALCON NPC‐0583 28 20‐Dec‐17

22‐Nov‐17 23‐Nov‐17 30‐Nov‐17 21‐Dec‐17 Tower C PD‐3 Columns & Walls 14 FALCON NPC‐0587 28 21‐Dec‐17

22‐Nov‐17 23‐Nov‐17 30‐Nov‐17 21‐Dec‐17 Tower C GL(K‐J//13‐TC2) Shatf Walls w/ Staircase @ CW‐1 7 112 FALCON NPC‐0586 28 21‐Dec‐17

22‐Nov‐17 23‐Nov‐17 30‐Nov‐17 21‐Dec‐17 Tower C PD‐3, 2nd Lift Columns            FALCON NPC‐0588 28 21‐Dec‐17
PD‐1 & TB‐FP,  NPC‐0579 & 
23‐Nov‐17 23‐Nov‐17 30‐Nov‐17 21‐Dec‐17 Tower B Columns 7 24 FALCON 28 21‐Dec‐17
1st Lift 0585
23‐Nov‐17 23‐Nov‐17 30‐Nov‐17 21‐Dec‐17 Tower D TD‐FP 2 nos. Circular Columns 7 8 FALCON NPC‐0590 28 21‐Dec‐17
CONCRETE TRACKING RECORD FOR C60+5%SF

MOZOON TOWER  Week Coverage: 16th to 21st of December 2017
E Test 
For 
l Total  Schedule 
Date  Cube crushing date  Cube crushing date  Total  Witness  
Date Finish Location Area Structure e Concrete  Supplier NPC for this  Date
Started (7 days) (28 days) Cubes (Please 
v (m 3 ) week (7D 
Check)
a & 28D)
9‐Dec‐17 9‐Dec‐17 16‐Dec‐17 6‐Jan‐18 Tower D TD‐FP, 2nd Lift Shear Walls FALCON 7 16‐Dec‐17
14 56 NPC‐0630
9‐Dec‐17 9‐Dec‐17 16‐Dec‐17 6‐Jan‐18 Tower A TA‐FP, 1st Lift Columns (C1) FALCON 7 16‐Dec‐17
14 40 NPC‐0646
11‐Dec‐17 12‐Dec‐17 19‐Dec‐17 9‐Jan‐18 Tower C GL(9‐TC3/AB) Retaining Wall 14 45 QATAR BETON NPC‐0672 7 19‐Dec‐17
2nd Lift 
12‐Dec‐17 12‐Dec‐17 19‐Dec‐17 9‐Jan‐18 Tower B GL(AG/TB1).  Columns  C5, C6 & C3) 7 27 QATAR BETON NPC‐0668 7 19‐Dec‐17
(AG/TB2), 
NPC‐0677, 0669 
12‐Dec‐17 12‐Dec‐17 19‐Dec‐17 9‐Jan‐18 Tower A 2nd & 1st Lift Columns (C2 & C3A, PC16 & PC11) 14 63 QATAR BETON 7 19‐Dec‐17
& 0666
12‐Dec‐17 13‐Dec‐17 20‐Dec‐17 10‐Jan‐18 Tower B GL(18‐TB1/AV) Retaining Wall 14 43 QATAR BETON NPC# 0651 7 20‐Dec‐17

13‐Dec‐17 14‐Dec‐17 21‐Dec‐17 11‐Jan‐18 Tower C PD‐1 Columns (C13 & C14) 7 81 QATAR BETON NPC# 0664 7 21‐Dec‐17

13‐Dec‐17 14‐Dec‐17 21‐Dec‐17 11‐Jan‐18 Tower B TB‐FP Column Neck FALCON 7 21‐Dec‐17


14 152 NPC‐0661
14‐Dec‐17 14‐Dec‐17 21‐Dec‐17 11‐Jan‐18 Tower B PD‐2 3 nos. Columns (C8D) FALCON 7 21‐Dec‐17
7 8 NPC‐0674
14‐Dec‐17 15‐Dec‐17 22‐Dec‐17 12‐Jan‐18 Tower A PD‐3 4 nos.columns(C8),(C11A) 7 16 FALCON NPC‐0686 7 22‐Dec‐17